[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-580-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":620},{"id":5,"name":6,"category":7,"favorite":8},580,"[土木建筑工程]建设工程计量与计价实务","建筑工程",0,8,50,1733,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,428,440,452,464,476,488,500,512,524,536,548,560,572,584,596,608],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},893326,1,"单选题","在砂土地层中施工泥浆护壁成孔灌注桩，桩径1.8m，桩长52m，应优先考虑采用（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","正循环钻孔灌注桩",false,{"key":24,"text":25,"correct":26},"B","反循环钻孔灌注桩",true,{"key":28,"text":29,"correct":22},"C","钻孔扩底灌注桩",{"key":31,"text":32,"correct":22},"D","冲击成孔灌注桩","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},893327,"关于地基夯实加固处理成功的经验是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"沙土、杂填土和软黏土层适宜采用重锤夯实",{"key":24,"text":41,"correct":22},"地下水距地面0.8m以上的湿陷性黄土不宜采用重锤夯实",{"key":28,"text":43,"correct":22},"碎石土、砂土、粉土不宜采用强夯法",{"key":31,"text":45,"correct":26},"工业废渣、垃圾地基适宜采用强夯法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},893328,"钢筋混凝土预制桩锤击沉桩法施工，通常采用（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"轻锤低击的打桩方式",{"key":24,"text":53,"correct":26},"重锤低击的打桩方式",{"key":28,"text":55,"correct":22},"先四周后中间的打桩顺序",{"key":31,"text":57,"correct":22},"先打短桩后打长桩",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},893329,"地基处理常采用强夯法，其特点在于（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"处理速度快、工期短，适用于城市施工",{"key":24,"text":65,"correct":22},"不适用于软黏土层处理",{"key":28,"text":67,"correct":22},"处理范围应小于建筑物基础范围",{"key":31,"text":69,"correct":26},"采取相应措施还可用于水下夯实",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},893330,"在渗透系数大、地下水量大的土层中，适宜采用的降水形式为（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"轻型井点",{"key":24,"text":77,"correct":22},"电渗井点",{"key":28,"text":79,"correct":22},"喷射井点",{"key":31,"text":81,"correct":26},"管井井点",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},893331,"跨度18m的钢屋架拼装应采用（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"构件平装法",{"key":24,"text":89,"correct":22},"构件立装法",{"key":28,"text":91,"correct":22},"利用模具拼装法",{"key":31,"text":93,"correct":22},"利用桁架拼装法",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},893332,"北方寒冷地区采用轻型井点降水时，井点管与集水总管连接应用（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"PVC-U管",{"key":24,"text":101,"correct":22},"PVC-C管",{"key":28,"text":103,"correct":22},"PP-R管",{"key":31,"text":105,"correct":26},"橡胶软管",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},893333,"当屋面坡度小于（ ）时，防水卷材宜平行于屋脊铺贴。",[110,112,114,116],{"key":20,"text":111,"correct":26},"3%",{"key":24,"text":113,"correct":22},"5%",{"key":28,"text":115,"correct":22},"10%",{"key":31,"text":117,"correct":22},"15%",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},893334,"土石方在填筑施工时应（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"先将不同类别的土搅拌均匀",{"key":24,"text":125,"correct":26},"采用同类土填筑",{"key":28,"text":127,"correct":22},"分层填筑时需搅拌",{"key":31,"text":129,"correct":22},"将含水量大的黏土填筑在底层",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},893335,"桥梁墩台基础施工时，在砂夹卵石层中，优先采用的主要沉桩方法为（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"锤击沉桩",{"key":24,"text":137,"correct":26},"射水沉桩",{"key":28,"text":139,"correct":22},"振动沉桩",{"key":31,"text":141,"correct":22},"静力压桩",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},893336,"混凝土冬季施工时，应注意（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"不宜采用普通硅酸盐水泥",{"key":24,"text":149,"correct":22},"适当增加水灰比",{"key":28,"text":151,"correct":22},"适当添加缓凝剂",{"key":31,"text":153,"correct":26},"适当添加引气剂",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},893337,"路基填土施工时应特别注意（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"优先采用竖向填筑法",{"key":24,"text":161,"correct":22},"尽量采用水平分层建筑",{"key":28,"text":163,"correct":22},"纵坡大于12%时不宜采用混合填筑",{"key":31,"text":165,"correct":26},"不同性质的土不能任意混填",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},893338,"填筑路堤前是否需要进行基底处理不取决于（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"地面横坡陡缓",{"key":24,"text":173,"correct":22},"基底土层松实",{"key":28,"text":175,"correct":22},"填方高度大小",{"key":31,"text":177,"correct":26},"填料土体性质",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},893339,"关于软土路基施工中稳定剂处置法施工，说法正确的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"该方法主要用于排出土体中的富余水分",{"key":24,"text":185,"correct":26},"该方法主要用于改善地基的压缩性和强度特征",{"key":28,"text":187,"correct":22},"压实后均不需要养护",{"key":31,"text":189,"correct":22},"稳定剂一般不用水泥作掺和料",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},893340,"石方爆破施工作业正确的顺序是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"钻孔→装药→敷设起爆网络→起爆",{"key":24,"text":197,"correct":22},"钻孔→确定炮位→敷设起爆网络→装药→起爆",{"key":28,"text":199,"correct":22},"确定炮位→敷设起爆网络→钻孔→装药→起爆",{"key":31,"text":201,"correct":22},"设置警戒线→敷设起爆网络→确定炮位→装药→起爆",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},893341,"路基石方开挖，在高作业面施工时为保证爆破岩石块度均匀，常采用的装药形式为（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"集中药包",{"key":24,"text":209,"correct":26},"分散药包",{"key":28,"text":211,"correct":22},"药壶药包",{"key":31,"text":213,"correct":22},"坑道药包",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},893342,"先张法预应力混凝土构件施工，其工艺流程为（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"支底模→支侧模→张拉钢筋→浇筑混凝土→养护、拆模→放张钢筋",{"key":24,"text":221,"correct":22},"支底模→张拉钢筋→支侧模→浇筑混凝土→放张钢筋→养护、拆模",{"key":28,"text":223,"correct":26},"支底模→预应力钢筋安放→张拉钢筋→支侧模→浇筑混凝土→拆模→放张钢筋",{"key":31,"text":225,"correct":22},"支底模→钢筋安放→支侧模→张拉钢筋→浇筑混凝土→放张钢筋→拆模",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},893343,"隧道工程施工时，通风方式通常采用（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"钢管压入式通风",{"key":24,"text":233,"correct":22},"PVC管抽出式通风",{"key":28,"text":235,"correct":26},"塑料布管压入式通风",{"key":31,"text":237,"correct":22},"PR管抽出式通风",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},893344,"关于桥梁墩台施工的说法，正确的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":26},"简易活动脚手架宜于25m以下的砌石墩台施工",{"key":24,"text":245,"correct":22},"当墩台高度超过30m时宜采用固定模板施工",{"key":28,"text":247,"correct":22},"墩台混凝土适宜采用强度等级较高的普通水泥",{"key":31,"text":249,"correct":22},"6m以下的墩台可采用悬吊脚手架施工",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},893345,"跨径100m以下的桥梁施工时，为满足桥梁上下部结构平行作业和施工精度要求，优先选用的方法是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"悬臂浇筑法",{"key":24,"text":257,"correct":26},"悬臂拼装法",{"key":28,"text":259,"correct":22},"转体法",{"key":31,"text":261,"correct":22},"支架现浇法",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},893346,"水泥土挡墙式深基坑支护方式不宜用于（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":26},"基坑侧壁安全等级为一级",{"key":24,"text":269,"correct":22},"施工范围内地基承载力小于150kPa",{"key":28,"text":271,"correct":22},"基坑深度小于6m",{"key":31,"text":273,"correct":22},"基坑周围工作面较宽",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},893347,"适用深埋于岩体的长隧洞施工的方法是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"顶管法",{"key":24,"text":281,"correct":26},"TBM法",{"key":28,"text":283,"correct":22},"盾构法",{"key":31,"text":285,"correct":22},"明挖法",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":28,"analysis":33},893348,"下列设备中，专门用来开挖竖井或斜井的大型钻具是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"全断面掘进机",{"key":24,"text":293,"correct":22},"独臂钻机",{"key":28,"text":295,"correct":26},"天井钻机",{"key":31,"text":297,"correct":22},"TBM设备",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},893349,"采用盾构施工技术修建地下隧道时，选择盾构工法应首先考虑（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"路线附近的重要构筑物",{"key":24,"text":305,"correct":22},"覆盖土的厚度",{"key":28,"text":307,"correct":22},"掘进距离和施工工期",{"key":31,"text":309,"correct":26},"盾构机种和辅助方法",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},893350,"地下工程的早强水泥砂浆锚杆用树脂药包的，正常温度下需要搅拌的时间为（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":26},"30s",{"key":24,"text":317,"correct":22},"45～60s",{"key":28,"text":319,"correct":22},"3min",{"key":31,"text":321,"correct":22},"5min",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},893351,"对地下工程喷射混凝土施工说法正确的是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":26},"喷嘴处水压应比工作风压大",{"key":24,"text":329,"correct":22},"工作风压随送风距离增加而调低",{"key":28,"text":331,"correct":22},"骨料回弹率与一次喷射厚度成正比",{"key":31,"text":333,"correct":22},"喷嘴与作业面之间的距离越小，回弹率越低",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},893352,"现场采用重叠法预制钢筋混凝土桩时，上层桩的浇筑应等到下层桩混凝土强度达到设计强度等级的（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":26},"30%",{"key":24,"text":341,"correct":22},"60%",{"key":28,"text":343,"correct":22},"70%",{"key":31,"text":345,"correct":22},"100%",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":31,"analysis":33},893353,"关于钢筋混凝土预制桩加工制作，说法正确的是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"长度在10m以上的桩必须工厂预制",{"key":24,"text":353,"correct":22},"重叠法预制不宜超过5层",{"key":28,"text":355,"correct":22},"重叠法预制下层桩强度达到设计强度70%时方可灌注上层桩",{"key":31,"text":357,"correct":26},"桩的强度达到设计强度的70%方可起吊",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},893354,"在钢筋混凝土预制桩打桩施工中，仅适用于软弱土层的接桩方法是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":26},"硫磺胶泥锚接",{"key":24,"text":365,"correct":22},"焊接连接",{"key":28,"text":367,"correct":22},"法兰连接",{"key":31,"text":369,"correct":22},"机械连接",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},893355,"墙面铺装工程中，阴角砖应压向正确，阳角线宜做成（ ）角对接。",[374,376,378,380],{"key":20,"text":375,"correct":22},"30°",{"key":24,"text":377,"correct":26},"45°",{"key":28,"text":379,"correct":22},"60°",{"key":31,"text":381,"correct":22},"90°",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":28,"analysis":33},893356,"路基开挖宜采用通道纵挖法的是（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"长度较小的路堑",{"key":24,"text":389,"correct":22},"深度较浅的路堑",{"key":28,"text":391,"correct":26},"两端地面纵坡较小的路堑",{"key":31,"text":393,"correct":22},"不宜采用机械开挖的路堑",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":31,"analysis":33},893357,"大跨径桁式组合拱桥上部结构，通常采用的安装方法是（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"支架安装",{"key":24,"text":401,"correct":22},"无支架吊装",{"key":28,"text":403,"correct":22},"转体安装",{"key":31,"text":405,"correct":26},"悬臂安装",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":28,"analysis":33},893358,"通常情况下，基坑土方开挖的明排水法主要适用于（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"细砂土层",{"key":24,"text":413,"correct":22},"粉砂土层",{"key":28,"text":415,"correct":26},"粗粒土层",{"key":31,"text":417,"correct":22},"淤泥土层",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":24,"analysis":33},893359,"钢筋混凝土预制桩的混凝土达到其设计强度的（ ）后方可起吊。",[422,424,425,427],{"key":20,"text":423,"correct":22},"50%",{"key":24,"text":343,"correct":26},{"key":28,"text":426,"correct":22},"90%",{"key":31,"text":345,"correct":22},{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":20,"analysis":33},893360,"关于基坑土石方工程采用轻型井点降水，说法正确的是（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":26},"U形布置不封闭段是为施工机械进出基坑留的开口",{"key":24,"text":435,"correct":22},"双排井点管适用于宽度小于6m的基坑",{"key":28,"text":437,"correct":22},"单排井点管应布置在基坑的地下水下游一侧",{"key":31,"text":439,"correct":22},"施工机械不能经U形布置的开口端进出基坑",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":31,"analysis":33},893361,"电渗井点降水的井点管应（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"布置在地下水流上游侧",{"key":24,"text":447,"correct":22},"布置在地下水流下游侧",{"key":28,"text":449,"correct":22},"沿基坑中线布置",{"key":31,"text":451,"correct":26},"沿基坑外围布置",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":24,"analysis":33},893362,"关于土石方填筑正确的意见是（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":22},"不宜采用同类土填筑",{"key":24,"text":459,"correct":26},"从上至下填筑土层的透水性应从小到大",{"key":28,"text":461,"correct":22},"含水量大的黏土宜填筑在下层",{"key":31,"text":463,"correct":22},"硫酸盐含量小于5%的土不能使用",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":24,"analysis":33},893363,"采用锤击法打预制钢筋混凝土桩，方法正确的是（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":22},"桩重大于2t时，不宜采用“重锤低击”施工",{"key":24,"text":471,"correct":26},"桩重小于2t时，可采用1.5～2倍桩重的桩锤",{"key":28,"text":473,"correct":22},"桩重大于2t时，可采用桩重2倍以上的桩锤",{"key":31,"text":475,"correct":22},"桩重小于2t时，可采用“轻锤高击”施工",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":24,"analysis":33},893364,"打桩机正确的打桩顺序为（ ）。",[480,482,484,486],{"key":20,"text":481,"correct":22},"先外后内",{"key":24,"text":483,"correct":26},"先大后小",{"key":28,"text":485,"correct":22},"先短后长",{"key":31,"text":487,"correct":22},"先浅后深",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":20,"analysis":33},893365,"静力压桩正确的施工工艺流程是（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":26},"定位→吊桩→对中→压桩→接桩→压桩→送桩→切割桩头",{"key":24,"text":495,"correct":22},"吊桩→定位→对中→压桩→送桩→压桩→接桩→切割桩头",{"key":28,"text":497,"correct":22},"对中→吊桩→插桩→送桩→静压→接桩→压桩→切割桩头",{"key":31,"text":499,"correct":22},"吊桩→定位→压桩→送桩→接桩→压桩→切割桩头",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":24,"analysis":33},893366,"主要用于浇筑平板式楼板或带边梁楼板的工具式模板为（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":22},"大模板",{"key":24,"text":507,"correct":26},"台模",{"key":28,"text":509,"correct":22},"隧道模板",{"key":31,"text":511,"correct":22},"永久式模板",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},893367,"一般路基土方施工时，可优先选作填料的是（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":22},"亚砂土",{"key":24,"text":519,"correct":22},"粉性土",{"key":28,"text":521,"correct":22},"黏性土",{"key":31,"text":523,"correct":26},"粗砂",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":20,"analysis":33},893368,"顶推法施工桥梁承载结构适用于（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":26},"等截面梁",{"key":24,"text":531,"correct":22},"变截面梁",{"key":28,"text":533,"correct":22},"大跨径桥梁",{"key":31,"text":535,"correct":22},"总长1000m以上桥梁",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":20,"analysis":33},893369,"关于喷射混凝土施工，说法正确的有（ ）。",[540,542,544,546],{"key":20,"text":541,"correct":26},"一次喷射厚度太薄，骨料易产生较大的回弹",{"key":24,"text":543,"correct":22},"工作风压大于水压有利于喷层附着",{"key":28,"text":545,"correct":22},"喷头与工作面距离越短越好",{"key":31,"text":547,"correct":22},"喷射混凝土所用骨料含水率越低越好",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":28,"analysis":33},893370,"沉井的排水挖土下沉法适用于（ ）。",[552,554,556,558],{"key":20,"text":553,"correct":22},"透水性较好的土层",{"key":24,"text":555,"correct":22},"涌水量较大的土层",{"key":28,"text":557,"correct":26},"排水时不致于产生流砂的土层",{"key":31,"text":559,"correct":22},"地下水较丰富的土层",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":28,"analysis":33},893371,"采用沉井法施工，当沉井中心线与设计中心线不重合时，通常采用以下方法纠偏（ ）。",[564,566,568,570],{"key":20,"text":565,"correct":22},"通过起重机械吊挂调试",{"key":24,"text":567,"correct":22},"在沉井内注水调试",{"key":28,"text":569,"correct":26},"通过中心线两侧挖土调整",{"key":31,"text":571,"correct":22},"在沉井外侧卸土调整",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":31,"analysis":33},893372,"以下土层中不宜采用重锤夯实法夯实地基的是（ ）。",[576,578,580,582],{"key":20,"text":577,"correct":22},"砂土",{"key":24,"text":579,"correct":22},"湿陷性黄土",{"key":28,"text":581,"correct":22},"杂填土",{"key":31,"text":583,"correct":26},"软黏土",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":20,"analysis":33},893373,"水泥掺量较小，土质较松时，搅拌桩成桩工艺可采用（ ）工艺。",[588,590,592,594],{"key":20,"text":589,"correct":26},"一次喷浆、二次搅拌",{"key":24,"text":591,"correct":22},"二次喷浆、二次搅拌",{"key":28,"text":593,"correct":22},"二次喷浆、三次搅拌",{"key":31,"text":595,"correct":22},"三次喷浆、三次搅拌",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":28,"analysis":33},893374,"一般处理淤泥、淤泥质土、流塑、软塑或可塑黏性土、粉土、砂土、黄土、素填土和碎石土等地基时，可采用的施工方法为（ ）。",[600,602,604,606],{"key":20,"text":601,"correct":22},"强夯法",{"key":24,"text":603,"correct":22},"重锤夯实法",{"key":28,"text":605,"correct":26},"高压喷射注浆法",{"key":31,"text":607,"correct":22},"振动水冲法",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":24,"analysis":33},893375,"高压喷射注浆法的类别不包括（ ）。",[612,614,616,618],{"key":20,"text":613,"correct":22},"旋喷",{"key":24,"text":615,"correct":26},"直喷",{"key":28,"text":617,"correct":22},"定喷",{"key":31,"text":619,"correct":22},"摆喷",[621,624,627,630,633,636],{"id":15,"name":622,"category":7,"favorite":623},"领导干部任职前廉政法规知识测试题",92,{"id":625,"name":626,"category":7,"favorite":15},595,"建筑结构与设备",{"id":628,"name":629,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":631,"name":632,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":634,"name":635,"category":7,"favorite":8},534,"BIM工程师",{"id":637,"name":635,"category":7,"favorite":8},535]