[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-580-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},580,"[土木建筑工程]建设工程计量与计价实务","建筑工程",0,7,50,1733,[13,34,46,58,70,79,91,103,115,127,139,151,163,175,187,199,211,223,235,247,259,271,283,295,307,319,331,343,355,367,379,391,403,415,427,439,451,463,475,487,499,511,521,532,544,556,568,580,592,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},893272,1,"单选题","适用于拼装跨度较小、构件相对刚度较大的钢结构的预拼装方法是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","平装法",true,{"key":24,"text":25,"correct":26},"B","立拼法",false,{"key":28,"text":29,"correct":26},"C","组立法",{"key":31,"text":32,"correct":26},"D","旋转法","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},893273,"下列关于钢结构安装，表述正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"一般钢柱的刚性较差，吊装时通常采用双机抬吊",{"key":24,"text":41,"correct":22},"高层钢结构一般是划分多个流水作业段进行安装",{"key":28,"text":43,"correct":26},"吊车梁与牛腿用焊接，梁与制动架之间用螺栓连接",{"key":31,"text":45,"correct":26},"吊车梁吊装常采用自行杆式起重机，以轮胎式起重机应用最多",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},893274,"（ ）是把零件和半成品部件装配成为独立的成品构件的组装方式。",[50,52,54,56],{"key":20,"text":51,"correct":26},"部件组装",{"key":24,"text":53,"correct":22},"装配",{"key":28,"text":55,"correct":26},"预总装",{"key":31,"text":57,"correct":26},"总装",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},893275,"采用后张法施工，如设计无规定，张拉预应力筋时，要求混凝土的强度至少要达到设计规定的混凝土立方体抗压强度标准值的（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"85%",{"key":24,"text":65,"correct":26},"80%",{"key":28,"text":67,"correct":22},"75%",{"key":31,"text":69,"correct":26},"70%",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},893276,"先张法预应力钢筋混凝土的施工，在放松预应力钢筋时，要求混凝土的强度不低于设计强度等级的（ ）。",[74,75,76,77],{"key":20,"text":67,"correct":22},{"key":24,"text":65,"correct":26},{"key":28,"text":63,"correct":26},{"key":31,"text":78,"correct":26},"100%",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":20,"analysis":33},893277,"某先张法预应力施工中，预应力筋长度为25m，其张拉方式为（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":22},"宜采用两端张拉",{"key":24,"text":86,"correct":26},"宜采用一端张拉",{"key":28,"text":88,"correct":26},"应采用一段张拉",{"key":31,"text":90,"correct":26},"应采用两端张拉",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":28,"analysis":33},893278,"大体积混凝土结构的混凝土养护，不宜使用（ ）。",[95,97,99,101],{"key":20,"text":96,"correct":26},"喷涂保护层养护",{"key":24,"text":98,"correct":26},"塑料布养护",{"key":28,"text":100,"correct":22},"蒸汽养护",{"key":31,"text":102,"correct":26},"覆盖浇水养护",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":20,"analysis":33},893279,"下列关于混凝土浇筑过程中应注意的事项，表述正确的为（ ）。",[107,109,111,113],{"key":20,"text":108,"correct":22},"混凝土运输、浇筑及间歇时间的总和应小于其初凝时间",{"key":24,"text":110,"correct":26},"为了保证大体积混凝土的整体性，不宜分层浇筑",{"key":28,"text":112,"correct":26},"冬期混凝土施工，应增加水灰比，增加水用量",{"key":31,"text":114,"correct":26},"高温期混凝土浇筑入模温度不应低于35℃",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":31,"analysis":33},893280,"下列适用于浇筑平板式楼板混凝土的模板是（ ）。",[119,121,123,125],{"key":20,"text":120,"correct":26},"组合模板",{"key":24,"text":122,"correct":26},"滑升模板",{"key":28,"text":124,"correct":26},"爬升模板",{"key":31,"text":126,"correct":22},"台模",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":24,"analysis":33},893281,"下列关于砌体工程施工，表述正确的是（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":26},"马牙槎应先进后退，对称砌筑",{"key":24,"text":134,"correct":22},"拉结钢筋伸入墙内不宜小于600mm",{"key":28,"text":136,"correct":26},"砌体的转角处和交接处应同时砌，不应留槎",{"key":31,"text":138,"correct":26},"构造柱墙体，应砌成马牙槎，马牙槎凹凸尺寸不宜大于60mm",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":31,"analysis":33},893282,"下列关于脚手架构造要求，表述正确的是（ ）。",[143,145,147,149],{"key":20,"text":144,"correct":26},"单排脚手架搭设高度不应超过25m",{"key":24,"text":146,"correct":26},"双排脚手架搭设高度不宜超过42m",{"key":28,"text":148,"correct":26},"一次悬挑脚手架高度不宜超过18m",{"key":31,"text":150,"correct":22},"悬挑钢梁截面高度不应小于160mm",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":31,"analysis":33},893283,"下列荷载，属于作用于脚手架上的可变荷载为（ ）。",[155,157,159,161],{"key":20,"text":156,"correct":26},"安全网自重",{"key":24,"text":158,"correct":26},"剪刀撑自重",{"key":28,"text":160,"correct":26},"架体立杆自重",{"key":31,"text":162,"correct":22},"作业人员自重",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":20,"analysis":33},893284,"逆作法基础施工的大致顺序为（ ）。",[167,169,171,173],{"key":20,"text":168,"correct":22},"支护结构→中间支撑→地下室顶板浇筑→底板混凝土浇筑",{"key":24,"text":170,"correct":26},"支护结构→中间支撑→底板混凝土浇筑→地下室顶板浇筑",{"key":28,"text":172,"correct":26},"支护结构→地下室顶板浇筑→中间支撑→底板混凝土浇筑",{"key":31,"text":174,"correct":26},"中间支撑→支护结构→底板混凝土浇筑→地下室顶板浇筑",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":33},893285,"钻孔压浆桩施工中，向孔内高压灌注制备好的以水泥浆为主剂的浆液，要求达到没有塌孔危险的高程或（ ）处。",[179,181,183,185],{"key":20,"text":180,"correct":22},"地下水位以上0.5～1.0m",{"key":24,"text":182,"correct":26},"地下水位以下0.5～1.0m",{"key":28,"text":184,"correct":26},"地下水位以上0.8m",{"key":31,"text":186,"correct":26},"地下水位以下0.8m",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":31,"analysis":33},893286,"下列桩基础施工中，无振动，对环境无影响的工法为（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":26},"泥浆护壁成孔灌注桩",{"key":24,"text":194,"correct":26},"干作业成孔灌注桩",{"key":28,"text":196,"correct":26},"钢筋混凝土预制桩",{"key":31,"text":198,"correct":22},"人工挖孔灌注桩",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":20,"analysis":33},893287,"下列关于钢筋混凝土预制桩的制作、起吊、运输和堆放，表述正确的是（ ）。",[203,205,207,209],{"key":20,"text":204,"correct":22},"现场预制桩，多采用重叠法制作",{"key":24,"text":206,"correct":26},"长度小于10m的短桩，工艺简单，宜现场预制",{"key":28,"text":208,"correct":26},"钢筋混凝土预制桩应在混凝土达到设计强度的50%时方可起吊",{"key":31,"text":210,"correct":26},"不同规格的预制桩应上小下大的模式堆放，堆放层数不宜超过4层",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":31,"analysis":33},893288,"下列选项中，不属于地基加固处理中，桩加固法的是（ ）。",[215,217,219,221],{"key":20,"text":216,"correct":26},"振冲桩法",{"key":24,"text":218,"correct":26},"水泥粉煤灰碎石桩法",{"key":28,"text":220,"correct":26},"深层搅拌桩法",{"key":31,"text":222,"correct":22},"钻孔压浆桩法",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":28,"analysis":33},893289,"重锤夯实法适于加固地下水距地面（ ）稍湿的黏土、砂土、湿陷性黄土、杂填土和分层填土，不适于有效夯实深度内存在软黏土层的地基。",[227,229,231,233],{"key":20,"text":228,"correct":26},"1.0m以下",{"key":24,"text":230,"correct":26},"1.0m以上",{"key":28,"text":232,"correct":22},"0.8m以上",{"key":31,"text":234,"correct":26},"0.8m以下",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":20,"analysis":33},893290,"挖除不能承受荷载的软弱土体，并回填强度较高、压缩性较低，且没有侵蚀性的材料，作为地基持力层的地基加固处理为（ ）。",[239,241,243,245],{"key":20,"text":240,"correct":22},"换填法",{"key":24,"text":242,"correct":26},"夯实法",{"key":28,"text":244,"correct":26},"预压法",{"key":31,"text":246,"correct":26},"桩加固法",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":31,"analysis":33},893291,"下列不能作为填方土料的是（ ）。",[251,253,255,257],{"key":20,"text":252,"correct":26},"碎石土",{"key":24,"text":254,"correct":26},"砂土",{"key":28,"text":256,"correct":26},"有机物含量5%的土",{"key":31,"text":258,"correct":22},"硫酸盐含量8%的土",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":24,"analysis":33},893292,"某工程场地平整，土质为含水量较小的亚黏土，挖填高差不大，且挖区与填区有一宽度400m相对平整地带，这种情况宜选用的主要施工机械为（ ）。",[263,265,267,269],{"key":20,"text":264,"correct":26},"推土机",{"key":24,"text":266,"correct":22},"铲运机",{"key":28,"text":268,"correct":26},"正铲挖土机",{"key":31,"text":270,"correct":26},"反铲挖土机",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":24,"analysis":33},893293,"铲运机的施工特点是适宜于（ ）。",[275,277,279,281],{"key":20,"text":276,"correct":26},"砾石层开挖",{"key":24,"text":278,"correct":22},"独立完成铲土、运土、填土",{"key":28,"text":280,"correct":26},"冻土层开挖",{"key":31,"text":282,"correct":26},"远距离运土",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":24,"analysis":33},893294,"某基坑，当支护结构失效、土体失稳后，对基坑周边环境及地下结构施工产生的影响为“严重”，则该基坑结构安全重要性系数为（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":26},"1.1",{"key":24,"text":290,"correct":22},"1.0",{"key":28,"text":292,"correct":26},"0.9",{"key":31,"text":294,"correct":26},"0.5",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":28,"analysis":33},893295,"下列不属于深基坑支护形式的为（ ）。",[299,301,303,305],{"key":20,"text":300,"correct":26},"型钢横档板",{"key":24,"text":302,"correct":26},"现浇地下连续墙",{"key":28,"text":304,"correct":22},"挡土灌注桩支护",{"key":31,"text":306,"correct":26},"深层搅拌水泥土桩墙",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":31,"analysis":33},893296,"下列关于横撑式的沟槽支护，表述正确的是（ ）。",[311,313,315,317],{"key":20,"text":312,"correct":26},"对于湿度大的黏土，可以采用间断式水平挡土板支撑",{"key":24,"text":314,"correct":26},"对于湿度很大的黏土，可以采用连续式水平挡土板支撑",{"key":28,"text":316,"correct":26},"采用间断式水平挡土板支撑时，挖土深度超过5m",{"key":31,"text":318,"correct":22},"挡土板等构件应根据实际布置进行结构验算",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":28,"analysis":33},893297,"浅基坑的开挖深度一般（ ）。",[323,325,327,329],{"key":20,"text":324,"correct":26},"小于3m",{"key":24,"text":326,"correct":26},"小于4m",{"key":28,"text":328,"correct":22},"小于5m",{"key":31,"text":330,"correct":26},"不大于5m",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":31,"analysis":33},893298,"堤身较高或受地形限制时，建筑路堤的方法通常采用（）。",[335,337,339,341],{"key":20,"text":336,"correct":26},"水平分层填筑",{"key":24,"text":338,"correct":26},"竖向填筑",{"key":28,"text":340,"correct":26},"纵向分层填筑",{"key":31,"text":342,"correct":22},"混合填筑",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":28,"analysis":33},893299,"地下连续墙的施工工序包括：①开挖槽段②吊放钢筋笼③吸泥清底④筑导墙⑤水下浇筑混凝土（）。",[347,349,351,353],{"key":20,"text":348,"correct":26},"①→④→③→②→⑤",{"key":24,"text":350,"correct":26},"①→④→②→③→⑤",{"key":28,"text":352,"correct":22},"④→①→③→②→⑤",{"key":31,"text":354,"correct":26},"④→①→②→③→⑤",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":20,"analysis":33},893300,"路堤填筑时应优先选用的填筑材料为（）。",[359,361,363,365],{"key":20,"text":360,"correct":22},"卵石",{"key":24,"text":362,"correct":26},"粉性土",{"key":28,"text":364,"correct":26},"重黏土",{"key":31,"text":366,"correct":26},"亚砂土",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":20,"analysis":33},893301,"石方爆破施工作业正确的顺序是（）。",[371,373,375,377],{"key":20,"text":372,"correct":22},"钻孔→装药→敷设起爆网路→起爆",{"key":24,"text":374,"correct":26},"钻孔→确定炮位→敷设起爆网路→装药→起爆",{"key":28,"text":376,"correct":26},"确定炮位→敷设起爆网路→钻孔→装药→起爆",{"key":31,"text":378,"correct":26},"设置警戒线→敷设起爆网路→确定炮位→装药→起爆",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":31,"analysis":33},893302,"下列关于路面施工的说法，正确的是（）。",[383,385,387,389],{"key":20,"text":384,"correct":26},"级配碎（砾）石施工方法只能采用厂拌法",{"key":24,"text":386,"correct":26},"热拌沥青混合料路面施工时，初压应选用开启振动装置的振动压路机",{"key":28,"text":388,"correct":26},"热拌沥青混合料路面施工时，初压从路中心向外侧碾压两遍",{"key":31,"text":390,"correct":22},"沥青表面处治最常用的施工方法是层铺法",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":24,"analysis":33},893303,"下列关于屋面保温工程施工，表述错误的是（ ）。",[395,397,399,401],{"key":20,"text":396,"correct":26},"对分层干铺的保温板块，上、下层接缝应相互错开",{"key":24,"text":398,"correct":22},"泡沫混凝土保温层施工前，基层应浇水湿润，留有一定积水",{"key":28,"text":400,"correct":26},"硬泡聚氨酯保温层，应分层喷涂施工，喷涂后20min内严禁上人",{"key":31,"text":402,"correct":26},"纤维材料保温层所使用的金属龙骨，其与基层间应采取隔热断桥措施",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},893304,"地下工程开挖后，对于软弱围岩优先选用的支护方式为（ ）",[407,409,411,413],{"key":20,"text":408,"correct":26},"锚索支护",{"key":24,"text":410,"correct":26},"锚杆支护",{"key":28,"text":412,"correct":26},"喷射混凝土支护",{"key":31,"text":414,"correct":22},"喷锚支护",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":31,"analysis":33},893306,"关于地基夯实加固处理成功的经验是（）。",[419,421,423,425],{"key":20,"text":420,"correct":26},"砂土、杂填土和软黏土层适宜采用重锤夯实",{"key":24,"text":422,"correct":26},"地下水距地面0.8m以上的湿陷性黄土不宜采用重锤夯实",{"key":28,"text":424,"correct":26},"碎石土、砂土、粉土不宜采用强夯法",{"key":31,"text":426,"correct":22},"工业废渣、垃圾地基适宜采用强夯法",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":28,"analysis":33},893307,"沉井高度较大时，为避免不均匀沉降，沉井制作前应（）。",[431,433,435,437],{"key":20,"text":432,"correct":26},"开挖基坑和搭设工作台",{"key":24,"text":434,"correct":26},"挖土下沉",{"key":28,"text":436,"correct":22},"铺设垫层、承垫木",{"key":31,"text":438,"correct":26},"抽取垫木",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":20,"analysis":33},893308,"下列关于钻孔压浆桩施工的说法，正确的是（）。",[443,445,447,449],{"key":20,"text":444,"correct":22},"向孔内高压灌注制备好的浆液要达到没有塌孔危险的高程",{"key":24,"text":446,"correct":26},"向孔内高压灌注制备好的浆液要达到地下水位以下0.5～1.0m处",{"key":28,"text":448,"correct":26},"投放粗集料至孔口设计标高以上0.5m",{"key":31,"text":450,"correct":26},"在水泥浆初凝之前多次重复地向孔内补浆",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":31,"analysis":33},893309,"关于钢筋混凝土构造柱的说法，正确的是（）。",[455,457,459,461],{"key":20,"text":456,"correct":26},"应按先浇柱后砌墙的施工顺序进行",{"key":24,"text":458,"correct":26},"构造柱与墙体连接处应砌马牙搓，从每层柱脚开始，先进后退",{"key":28,"text":460,"correct":26},"沿墙高每500mm设2φ6拉结钢筋，每边伸入墙内不宜小于500mm",{"key":31,"text":462,"correct":22},"应按先砌墙后浇柱的施工顺序进行",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":31,"analysis":33},893311,"关于钢筋混凝土预制桩加工制作，说法正确的是（）。",[467,469,471,473],{"key":20,"text":468,"correct":26},"长度在10m以上的桩必须工厂预制",{"key":24,"text":470,"correct":26},"重叠法预制不宜超过5层",{"key":28,"text":472,"correct":26},"重叠法预制下层桩强度达到设计强度70%时方可灌注上层桩",{"key":31,"text":474,"correct":22},"桩的强度达到设计强度的70%方可起吊",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},893312,"下列关于脚手架的说法，正确的是（）。",[479,481,483,485],{"key":20,"text":480,"correct":26},"单、双排脚手架一次搭设高度不应超过相邻连墙件以上三步",{"key":24,"text":482,"correct":26},"单排脚手架搭设高度不应超过50m",{"key":28,"text":484,"correct":26},"一次悬挑脚手架高度不宜超过24m",{"key":31,"text":486,"correct":22},"立杆垫板或底座底面标高宜高于自然地坪50～100mm",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":24,"analysis":33},893313,"墙体为构造柱砌成的马牙槎，其凹凸尺寸和高度可约为（）。",[491,493,495,497],{"key":20,"text":492,"correct":26},"60mm和345mm",{"key":24,"text":494,"correct":22},"60mm和260mm",{"key":28,"text":496,"correct":26},"70mm和385mm",{"key":31,"text":498,"correct":26},"90mm和385mm",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},893314,"关于桥梁墩台施工的说法，正确的是（）。",[503,505,507,509],{"key":20,"text":504,"correct":22},"简易活动脚手架适宜于25m以下的砌石墩台施工",{"key":24,"text":506,"correct":26},"当墩台高度超过30m时宜采用固定模板施工",{"key":28,"text":508,"correct":26},"6m以下的墩台可采用悬吊脚手架施工",{"key":31,"text":510,"correct":26},"装配式墩台适用于砂石供应充足的地区",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":24,"analysis":33},893315,"当场地起伏高差较大、土方运输距离为1500 米，且工程量大而集中时，可采用（ ），配合自卸汽车运土。",[515,516,518,519],{"key":20,"text":264,"correct":26},{"key":24,"text":517,"correct":22},"挖掘机",{"key":28,"text":266,"correct":26},{"key":31,"text":520,"correct":26},"平地机",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":28,"analysis":33},893316,"当开挖较大、较浅（深度小于 5m） 的基坑，且邻近有建筑物不容许背面地基下沉或位移时，可采用（ ） 。",[525,527,529,530],{"key":20,"text":526,"correct":26},"连续式水平挡土板支撑",{"key":24,"text":528,"correct":26},"叠袋式挡墙支护",{"key":28,"text":304,"correct":22},{"key":31,"text":531,"correct":26},"间断式水平挡土板支撑",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":28,"analysis":33},893317,"场地平整前，确定场地平整施工方案的首要任务是（ ）。",[536,538,540,542],{"key":20,"text":537,"correct":26},"确定场地内外土方调配方案",{"key":24,"text":539,"correct":26},"计算挖方的工程量",{"key":28,"text":541,"correct":22},"明确场地的设计标高",{"key":31,"text":543,"correct":26},"计算填方的工程量",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},893318,"对于大跨度的焊接球节点钢管网架的吊装，出于防火等考虑，一般选用（ ）。",[548,550,552,554],{"key":20,"text":549,"correct":26},"大跨度结构高空拼装法施工",{"key":24,"text":551,"correct":22},"大跨度结构整体吊装法施工",{"key":28,"text":553,"correct":26},"大跨度结构整体顶升法施工",{"key":31,"text":555,"correct":26},"大跨度结构滑移法施工",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":31,"analysis":33},893319,"以下关于扣件脚手架搭设要求说法正确的是（ ）。",[560,562,564,566],{"key":20,"text":561,"correct":26},"双排脚手架的搭设高度不宜超过24m",{"key":24,"text":563,"correct":26},"一次搭设高度不应超过相邻连墙件以上三步",{"key":28,"text":565,"correct":26},"对接扣件开口应朝下或朝外",{"key":31,"text":567,"correct":22},"扣件规格应与钢管外径相同",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":31,"analysis":33},893320,"制作预制桩的方法中，为节约场地现场预制桩常采用（ ）。",[572,574,576,578],{"key":20,"text":573,"correct":26},"并列法",{"key":24,"text":575,"correct":26},"间隔法",{"key":28,"text":577,"correct":26},"翻模法",{"key":31,"text":579,"correct":22},"重叠法",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":28,"analysis":33},893321,"桩基础工程施工中，振动沉桩法的主要特点有（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":26},"适宜于黏性土层",{"key":24,"text":587,"correct":26},"对夹有孤石的土层优势突出",{"key":28,"text":589,"correct":22},"在含水砂层中效果显著",{"key":31,"text":591,"correct":26},"尤其适用于砂砾层",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":28,"analysis":33},893324,"在松散土体中开挖6m深的沟槽，支护方式应优先采用（ ）。",[596,598,600,602],{"key":20,"text":597,"correct":26},"间断式水平挡土板横撑式支撑",{"key":24,"text":599,"correct":26},"连续式水平挡土板横撑式支撑",{"key":28,"text":601,"correct":22},"垂直挡土板式支撑",{"key":31,"text":603,"correct":26},"重力式支护结构支撑",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":31,"analysis":33},893325,"在砂性土中施工直径2.5m的高压喷射注浆桩，应采用（ ）。",[608,610,612,614],{"key":20,"text":609,"correct":26},"单管法",{"key":24,"text":611,"correct":26},"二重管法",{"key":28,"text":613,"correct":26},"三重管法",{"key":31,"text":615,"correct":22},"多重管法",[617,620,623,626,629,632],{"id":15,"name":618,"category":7,"favorite":619},"领导干部任职前廉政法规知识测试题",92,{"id":621,"name":622,"category":7,"favorite":15},595,"建筑结构与设备",{"id":624,"name":625,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":627,"name":628,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":630,"name":631,"category":7,"favorite":8},534,"BIM工程师",{"id":633,"name":631,"category":7,"favorite":8},535]