[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-580-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":607},{"id":5,"name":6,"category":7,"favorite":8},580,"[土木建筑工程]建设工程计量与计价实务","建筑工程",0,6,50,1733,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,368,380,392,404,416,428,440,452,464,476,488,500,512,524,532,544,554,566,578,586,595],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},893222,1,"单选题","主要用于浇筑平板式楼板或带边梁楼板的工具式模板为（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","大模板",false,{"key":24,"text":25,"correct":26},"B","台模",true,{"key":28,"text":29,"correct":22},"C","隧道模板",{"key":31,"text":32,"correct":22},"D","永久式模板","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},893223,"下列关于混凝土工程施工的说法，正确的为( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"混凝土运输、输送及浇筑过程中可以加水",{"key":24,"text":41,"correct":22},"同一施工段的混凝土应在底层混凝土终凝之前将上一层混凝土浇筑完毕",{"key":28,"text":43,"correct":22},"大体积混凝土结构目前应用较多的是分段分层方案",{"key":31,"text":45,"correct":26},"振动器按工作方式可分为内部振动器、外部振动器、表面振动器和振动台四种",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},893224,"先张法预应力构件适用的条件是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"预制构件厂生产中、小型构件",{"key":24,"text":53,"correct":22},"预制构件厂生产大型构件",{"key":28,"text":55,"correct":22},"施工现场生产中、小型构件",{"key":31,"text":57,"correct":22},"施工现场生产大型构件",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},893225,"装配整体式结构中，预应力混凝土预制构件的混凝土强度等级( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"不宜低于C30",{"key":24,"text":65,"correct":26},"不宜低于C40",{"key":28,"text":67,"correct":22},"不应低于C25",{"key":31,"text":69,"correct":22},"不应低于C35",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},893226,"下面选项，关于土石方填筑正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"宜采用同类土填筑",{"key":24,"text":77,"correct":22},"从上至下填筑土层的透水性应从大到小",{"key":28,"text":79,"correct":22},"含水量大的黏土宜填筑在下层",{"key":31,"text":81,"correct":22},"硫酸盐含量小于5％的土不能使用",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},893227,"先张法预应力混凝土构件施工，其工艺流程为( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"支底模．支侧模．张拉钢筋．浇筑混凝土．养护、拆模．放张钢筋",{"key":24,"text":89,"correct":22},"支底模．张拉钢筋．支侧模．浇筑混凝土．放张钢筋．养护、拆模",{"key":28,"text":91,"correct":26},"支底模．预应力钢筋安放．张拉钢筋．支侧模．浇混凝土．拆模．放张钢筋",{"key":31,"text":93,"correct":22},"支底模．钢筋安放．支侧模．张拉钢筋．浇筑混凝土．放张钢筋．拆模",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},893228,"泥浆护壁成孔灌注桩施工流程（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"测量放线定位→桩机就位→埋设护筒→成孔→一次清孔→安装导管→安装钢筋笼→二次清孔→灌注水下混凝土→起拔导管、护筒→桩头混凝土养护",{"key":24,"text":101,"correct":22},"测量放线定位→埋设护筒→桩机就位→成孔→安装钢筋笼→一次清孔→安装导管→二次清孔→起拔导管、护筒→灌注水下混凝土→桩头混凝土养护",{"key":28,"text":103,"correct":26},"测量放线定位→埋设护筒→桩机就位→成孔→一次清孔→安装钢筋笼→安装导管→二次清孔→灌注水下混凝土→起拔导管、护筒→桩头混凝土养护",{"key":31,"text":105,"correct":22},"测量放线定位→埋设护筒→桩机就位→成孔→一次清孔→安装钢筋笼→安装导管→灌注水下混凝土→二次清孔→桩头混凝土养护→起拔导管、护筒",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},893229,"下列关于先张法预应力施工说法错误的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"预应力筋长度大于20m的宜采用一端张拉",{"key":24,"text":113,"correct":22},"重叠法生产构件时，下层构件的混凝土强度达到5MPa后方可浇筑上层构件的混凝土",{"key":28,"text":115,"correct":22},"混凝土可采用自然养护或湿热养护",{"key":31,"text":117,"correct":22},"预应力筋放张时不应低于30MPa",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},893230,"屋面防水工程中，混凝土结构层宜采用结构找坡，坡度不应小于（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"2％",{"key":24,"text":125,"correct":26},"3％",{"key":28,"text":127,"correct":22},"4％",{"key":31,"text":129,"correct":22},"5％",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},893231,"跨度较小、构件相对刚度较大的钢屋架拼装应采用( )。",[134,136,138,140],{"key":20,"text":135,"correct":26},"构件平装法",{"key":24,"text":137,"correct":22},"构件立装法",{"key":28,"text":139,"correct":22},"利用模具拼装法",{"key":31,"text":141,"correct":22},"利用桁架拼装法",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},893232,"单层钢结构厂房在安装前需要进行吊装稳定性验算的钢结构件是( )。",[146,148,150,152],{"key":20,"text":147,"correct":22},"钢柱",{"key":24,"text":149,"correct":26},"钢屋架",{"key":28,"text":151,"correct":22},"吊车梁",{"key":31,"text":153,"correct":22},"钢桁架",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},893233,"下面关于桥梁墩台施工的说法，正确的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"简易活动脚手架适用于25m以上的砌石墩台施工",{"key":24,"text":161,"correct":26},"当墩台高度超过30m时常用滑动模板施工",{"key":28,"text":163,"correct":22},"墩台高度小于30m时采用固定式轻型脚手架",{"key":31,"text":165,"correct":22},"6m以下的墩台可采用悬吊脚手架施工",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},893234,"钢筋砼预制桩的运输和堆放应满足以下要求（）",[170,172,174,176],{"key":20,"text":171,"correct":22},"砼强度达到设计强度的70%以上方可运输",{"key":24,"text":173,"correct":26},"砼强度达到设计强度的100%方可运输",{"key":28,"text":175,"correct":22},"堆放层不宜超过10层",{"key":31,"text":177,"correct":22},"不同规格的桩按上小下大堆放",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},893235,"爆扩成孔灌注桩的主要优点在于（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"适于在软土中形成桩基础",{"key":24,"text":185,"correct":26},"扩大桩底支撑面",{"key":28,"text":187,"correct":22},"增大桩身周边土体的密实度",{"key":31,"text":189,"correct":22},"有效扩大桩柱直径",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},893236,"静力压桩正确的施工工艺流程为（）",[194,196,198,200],{"key":20,"text":195,"correct":26},"定位-吊桩-对中-压桩-接桩-压桩-送桩-切割桩头",{"key":24,"text":197,"correct":22},"吊桩-定位-对中-压桩-送桩-压桩-接桩-切割桩头",{"key":28,"text":199,"correct":22},"对中-吊桩-插桩-送桩-静压-接桩-压桩-切割桩头",{"key":31,"text":201,"correct":22},"吊桩-定位-压桩-送桩-接桩-压桩-切割桩头",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},893237,"推土机的经济运距在100m以内，以（ ）m为最佳运距。",[206,208,210,212],{"key":20,"text":207,"correct":22},"20～40",{"key":24,"text":209,"correct":22},"20～50",{"key":28,"text":211,"correct":22},"30～50",{"key":31,"text":213,"correct":26},"30～60",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},893238,"（ ）是国内外目前最常用的一种幕墙，广泛运用于现代化高档公共建筑的外墙装饰。",[218,220,222,224],{"key":20,"text":219,"correct":26},"玻璃幕墙",{"key":24,"text":221,"correct":22},"石材幕墙",{"key":28,"text":223,"correct":22},"混凝土幕墙",{"key":31,"text":225,"correct":22},"金属幕墙",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},893239,"预应力砼构件先张法施工工艺流程正确的为（）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"安骨架、钢筋-张拉-安底、侧模-浇灌-养护-拆模-放张",{"key":24,"text":233,"correct":26},"安底模、骨架、钢筋-张拉-支侧模-浇灌-养护-拆模-放张",{"key":28,"text":235,"correct":22},"安骨架-安钢筋-安底、侧模-浇灌-张拉-养护-放张-拆模",{"key":31,"text":237,"correct":22},"安底模、侧模-安钢筋-张拉-浇灌-养护-放张-拆模",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},893240,"关于预应力后张法的施工工艺，下列说法正确的是（）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"灌浆孔的间距，对预埋金属螺旋管不宜大于40m",{"key":24,"text":245,"correct":26},"张拉预应力筋时，设计无规定的，构件混凝土的强度不低于设计强度等级的75%",{"key":28,"text":247,"correct":22},"对后张法预应力梁，张拉时现浇结构混凝土的龄期不宜小于5d",{"key":31,"text":249,"correct":22},"孔道灌浆所用水泥浆拌和后至灌浆完毕的时间不宜超过35min",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":28,"analysis":33},893241,"钢结构单层厂房的吊车梁安装选用较多的起重机械是（）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"拔杆",{"key":24,"text":257,"correct":22},"桅杆式起重机",{"key":28,"text":259,"correct":26},"履带式起重机",{"key":31,"text":261,"correct":22},"塔式起重机",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":28,"analysis":33},893242,"采用明排水法开挖基坑，在基坑开挖过程中设置的集水坑应( )。",[266,268,270,272],{"key":20,"text":267,"correct":22},"布置在基础范围以内",{"key":24,"text":269,"correct":22},"布置在基坑底部中央",{"key":28,"text":271,"correct":26},"布置在地下水走向的上游",{"key":31,"text":273,"correct":22},"经常低于挖土面1．Om以上",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},893243,"基坑开挖时，采用明排法施工，其集水坑应设置在( )。",[278,280,282,284],{"key":20,"text":279,"correct":22},"基础范围以外的地下水走向的下游",{"key":24,"text":281,"correct":26},"基础范围以外的地下水走向的上游",{"key":28,"text":283,"correct":22},"便于布置抽水设施的基坑边角处",{"key":31,"text":285,"correct":22},"不影响施工交通的基坑边角处",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},893244,"对大面积二类土场地进行平整的主要施工机械应优先考虑( )。",[290,292,294,296],{"key":20,"text":291,"correct":22},"拉铲挖掘机",{"key":24,"text":293,"correct":26},"铲运机",{"key":28,"text":295,"correct":22},"正铲挖掘机",{"key":31,"text":297,"correct":22},"反铲挖掘机",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},893245,"土石方在填筑施工时应( )。",[302,304,306,308],{"key":20,"text":303,"correct":22},"先将不同类别的土搅拌均匀",{"key":24,"text":305,"correct":26},"采用同类土填筑",{"key":28,"text":307,"correct":22},"分层填筑时需搅拌",{"key":31,"text":309,"correct":22},"将含水量大的黏土填筑在底层",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},893246,"下列关于隧道支护的方法，表述正确的是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"喷射混凝土支护，基本采用干喷法",{"key":24,"text":317,"correct":22},"随机锚杆支护，是对个别松动岩块随机性固定",{"key":28,"text":319,"correct":22},"超前预注浆支护，使开挖工作面始终在预注浆固结之前的岩层中推进",{"key":31,"text":321,"correct":26},"超前锚杆支护，当锚杆可能强度不够时，可改用打入钢导管注浆加固",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},893247,"下列关于隧道开挖的方法，表述正确的是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"软土隧道不宜采用明挖法",{"key":24,"text":329,"correct":26},"山岭隧道常用钻爆法或掘进法",{"key":28,"text":331,"correct":22},"通风、排水是钻爆法施工的基本工序",{"key":31,"text":333,"correct":22},"TBM法可同时进行切削开挖、余土外运、顶进，以及拼装预制管片等工序",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},893248,"地下连续墙的混凝土是在泥浆中采用导管浇灌的，导管埋入混凝土面下的深度保持在（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"0.5～1.0m",{"key":24,"text":341,"correct":22},"0.5～5.0m",{"key":28,"text":343,"correct":22},"1.0～2.0m",{"key":31,"text":345,"correct":26},"2.0～4.0m",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":31,"analysis":33},893249,"地下连续墙挖槽中，适用于适用于老黏性土、硬土的开挖方法是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"沟槽推土法",{"key":24,"text":353,"correct":22},"多头钻施工法",{"key":28,"text":355,"correct":22},"钻抓式施工法",{"key":31,"text":357,"correct":26},"冲击式施工法",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":28,"analysis":33},893250,"同时适用于沥青路面初压和终压的压路机为（ ）。 A.轻型钢筒式压路机 B.重型轮胎式压路机 C.关闭振动装置的振动压路机 D.双轮钢筒式压路机",[362,363,364,365,366],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"key":367,"text":367,"correct":22},"E",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":20,"analysis":33},893251,"道路施工中的沥青表面处治施工是指（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":26},"按设计分层浇洒沥青及撒铺矿料并碾压形成路面面层",{"key":24,"text":375,"correct":22},"用机械方法将冷料热油拌和、摊铺并压实形成路面面层",{"key":28,"text":377,"correct":22},"用专用设备将混合料热铺热压成形面面层",{"key":31,"text":379,"correct":22},"用热沥青热铺面层",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":24,"analysis":33},893252,"下列关于地面工程施工，表述错误的是（ ）。",[384,386,388,390],{"key":20,"text":385,"correct":22},"当使用张紧器伸展地毯时，应由地毯中心向四周展开",{"key":24,"text":387,"correct":26},"竹、实木地板的铺装中，毛地板及地板与墙之间应留有3mm的缝隙",{"key":28,"text":389,"correct":22},"竹、实木地板的铺装中，毛地板应与龙骨成30°或45°铺钉，相邻板的接缝应错开",{"key":31,"text":391,"correct":22},"强化复合地板的铺装中，当房间长度或宽度超过8m时，应在适当位置设置伸缩缝",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":28,"analysis":33},893253,"涂饰工程施工中，施工现场环境温度宜在（ ）之间。",[396,398,400,402],{"key":20,"text":397,"correct":22},"-5～5℃",{"key":24,"text":399,"correct":22},"-5～10℃",{"key":28,"text":401,"correct":26},"5～35℃",{"key":31,"text":403,"correct":22},"5～38℃",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":20,"analysis":33},893254,"下列关于墙面铺装工程施工的表述，正确的是（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":26},"墙面砖铺贴，结合砂浆宜采用1：2水泥砂浆",{"key":24,"text":411,"correct":22},"墙面石材铺装，采用湿法铺装时，灌注砂浆时应一次性连续进行",{"key":28,"text":413,"correct":22},"墙面砖铺贴，每面墙不应有两列非整砖，非整砖宽度不宜小于整砖的1\u002F3",{"key":31,"text":415,"correct":22},"墙面石材铺装，采用湿法铺装时，每块石材与钢筋网的拉接点不得少于2个",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},893255,"下列关于轻质隔墙工程施工，表述正确的是（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":26},"纸面石膏板宜竖向铺设，长边接缝应安装在竖向龙骨上",{"key":24,"text":423,"correct":22},"当胶合板用木压条固定时，固定点间距不应小于200mm",{"key":28,"text":425,"correct":22},"石膏板与周围的墙或柱应留有8～10mm的槽口，以便进行防开裂处理。",{"key":31,"text":427,"correct":22},"安装贯通系列龙骨时，低于5m的隔墙只安装一道，5～8m的隔墙可安装两道",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":20,"analysis":33},893256,"下列关于吊顶工程施工，表述正确的是（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":26},"主龙骨应按房间短向跨度适当起拱",{"key":24,"text":435,"correct":22},"纸面石膏板固定时应从板的四周向板的中心固定",{"key":28,"text":437,"correct":22},"当安装双层石膏板时，上、下层板的接缝应对齐，固定在同一根龙骨上",{"key":31,"text":439,"correct":22},"当采用沉头自攻螺钉安装饰面板时，接缝处次龙骨的宽度不得小于30mm",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":24,"analysis":33},893257,"加气混凝土块和板的底层抹灰时，一般宜选用（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"水泥砂浆",{"key":24,"text":447,"correct":26},"混合砂浆",{"key":28,"text":449,"correct":22},"麻刀石灰砂浆",{"key":31,"text":451,"correct":22},"纸筋石灰浆",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":28,"analysis":33},893258,"下列关于地下室表面防水施工，表述错误的是（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":22},"涂膜防水的特点在于适用部位广泛",{"key":24,"text":459,"correct":22},"可以采用多层法和外加剂法进行水泥砂浆刚性防水",{"key":28,"text":461,"correct":26},"卷材防水采用外贴法时，应先砌保护墙，并在保护墙内侧铺贴卷材",{"key":31,"text":463,"correct":22},"在同一个变形缝处，采用止水带防水，可采用多种止水带组合构造",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":24,"analysis":33},893259,"地下防水混凝土工程施工时，应满足的要求是（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":22},"环境应保持潮湿",{"key":24,"text":471,"correct":26},"混凝土浇筑时的自落高度应控制在1.5m以内",{"key":28,"text":473,"correct":22},"自然养护时间应不少于7天",{"key":31,"text":475,"correct":22},"施工缝应留在底板表面以下的墙体上",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":20,"analysis":33},893260,"根据《屋面工程质量验收规范》的规定，同一层相邻两幅卷材短边搭接缝错开不应（ ）。",[480,482,484,486],{"key":20,"text":481,"correct":26},"小于500mm",{"key":24,"text":483,"correct":22},"小于300mm",{"key":28,"text":485,"correct":22},"大于500mm",{"key":31,"text":487,"correct":22},"大于300mm",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":28,"analysis":33},893261,"下列不属于合成高分子防水卷材施工方式的为（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"冷粘法",{"key":24,"text":495,"correct":22},"自粘法",{"key":28,"text":497,"correct":26},"热熔法",{"key":31,"text":499,"correct":22},"焊接法",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":20,"analysis":33},893262,"当卷材防水层上有重物覆盖或基层变形较大时，不应优先采用铺贴方式为（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":26},"满粘法",{"key":24,"text":507,"correct":22},"点粘法",{"key":28,"text":509,"correct":22},"条粘法",{"key":31,"text":511,"correct":22},"空铺法",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":24,"analysis":33},893263,"在大跨度桁架结构和网架结构安装中常常采用，高空拼装作业地点集中在起点一端，搭设脚手架较少，特别是当场地狭窄、起重机械无法出入时更为有效的吊装方法为（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":22},"整体吊装法",{"key":24,"text":519,"correct":26},"滑移吊装法",{"key":28,"text":521,"correct":22},"高空拼装法",{"key":31,"text":523,"correct":22},"整体顶升法",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":20,"analysis":33},893264,"适合吊装焊接球节点钢管网架，不需要高大的拼装支架，高空作业少的大跨度结构吊装方法为（ ）。",[528,529,530,531],{"key":20,"text":517,"correct":26},{"key":24,"text":519,"correct":22},{"key":28,"text":521,"correct":22},{"key":31,"text":523,"correct":22},{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":28,"analysis":33},893265,"某结构吊装工程，待吊装结构为屋架，其安装支座表面高度为10m，屋架绑扎点至屋架底面距离1.5m，索具高度为1.5m，则起重机的起重高度至少为（ ）。",[536,538,540,542],{"key":20,"text":537,"correct":22},"11.5m",{"key":24,"text":539,"correct":22},"13.0m",{"key":28,"text":541,"correct":26},"13.3m",{"key":31,"text":543,"correct":22},"14.5m",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":20,"analysis":33},893266,"某6层工业建筑，其厂房结构吊装，适宜采用的起重机械为（ ）。",[548,549,550,552],{"key":20,"text":261,"correct":26},{"key":24,"text":259,"correct":22},{"key":28,"text":551,"correct":22},"汽车式起重机",{"key":31,"text":553,"correct":22},"自升式塔式起重机",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":20,"analysis":33},893267,"柱的最后固定中，灌筑分两次进行，第一次灌注后，待混凝土强度达到（ ）设计强度后，拔去楔块再第二次灌筑混凝土至杯口顶面。",[558,560,562,564],{"key":20,"text":559,"correct":26},"25%",{"key":24,"text":561,"correct":22},"30%",{"key":28,"text":563,"correct":22},"70%",{"key":31,"text":565,"correct":22},"75%",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":24,"analysis":33},893268,"吊装作业较安全，但吊升过程中柱所受振动较大，只有当起重机或场地受限时才采用的起吊方法为（ ）。",[570,572,574,576],{"key":20,"text":571,"correct":22},"旋转法",{"key":24,"text":573,"correct":26},"滑行法",{"key":28,"text":575,"correct":22},"顶升法",{"key":31,"text":577,"correct":22},"滑移法",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":20,"analysis":33},893269,"柱吊升中所受振动较小，但对起重机的机动性要求高，一般采用自行式起重机的起吊方式为（ ）。",[582,583,584,585],{"key":20,"text":571,"correct":26},{"key":24,"text":573,"correct":22},{"key":28,"text":575,"correct":22},{"key":31,"text":577,"correct":22},{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":31,"analysis":33},893270,"下列不属于自行杆式起重机的是（ ）。",[590,591,592,594],{"key":20,"text":259,"correct":22},{"key":24,"text":551,"correct":22},{"key":28,"text":593,"correct":22},"轮胎式起重机",{"key":31,"text":257,"correct":26},{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":20,"analysis":33},893271,"下列选项中，对钢结构防腐涂料的施工顺序，表述错误的是（ ）。",[599,601,603,605],{"key":20,"text":600,"correct":26},"先下后上",{"key":24,"text":602,"correct":22},"先左后右",{"key":28,"text":604,"correct":22},"先里后外",{"key":31,"text":606,"correct":22},"先难后易",[608,611,614,617,620,623],{"id":15,"name":609,"category":7,"favorite":610},"领导干部任职前廉政法规知识测试题",92,{"id":612,"name":613,"category":7,"favorite":15},595,"建筑结构与设备",{"id":615,"name":616,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":618,"name":619,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":621,"name":622,"category":7,"favorite":8},534,"BIM工程师",{"id":624,"name":622,"category":7,"favorite":8},535]