[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-580-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},580,"[土木建筑工程]建设工程计量与计价实务","建筑工程",0,5,50,1733,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,453,465,477,489,500,512,524,536,548,556,568,580,592,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},893170,1,"单选题","塑料的主要组成材料是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","玻璃纤维",false,{"key":24,"text":25,"correct":22},"B","乙二胺",{"key":27,"text":28,"correct":22},"C","DBP和DOP",{"key":30,"text":31,"correct":32},"D","合成树脂",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},893171,"采矿业防水防渗工程常用（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"PVC防水卷材",{"key":24,"text":41,"correct":32},"氯化聚乙烯防水卷材",{"key":27,"text":43,"correct":22},"三元乙丙橡胶防水卷材",{"key":30,"text":45,"correct":22},"APP改性沥青防水卷材",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},893172,"制作光泽度高、花纹耐久、抗风化、耐火、防潮性好的水磨石板材，应采用（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"硫铝酸盐水泥",{"key":24,"text":53,"correct":32},"高铝水泥",{"key":27,"text":55,"correct":22},"硅酸盐水泥",{"key":30,"text":57,"correct":22},"普通硅酸盐水泥",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},893173,"保持坍落度不变，掺减水剂可（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":32},"降低单位混凝土用水量",{"key":24,"text":65,"correct":22},"增加单位混凝土用水量",{"key":27,"text":67,"correct":22},"提高混凝土强度",{"key":30,"text":69,"correct":22},"降低混凝土强度",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},893174,"关于钢材的塑性变形及伸长率，以下说法正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"塑性变形在标距内分布是均匀的",{"key":24,"text":77,"correct":32},"伸长率的大小与标距长度有关",{"key":27,"text":79,"correct":22},"离颈缩部位越远变形越大",{"key":30,"text":81,"correct":22},"同一种钢材，δ5应小于δ10",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},893175,"决定混凝土密实性的主要因素是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"振捣方法",{"key":24,"text":89,"correct":22},"养护温度",{"key":27,"text":91,"correct":32},"水灰比及水泥用量",{"key":30,"text":93,"correct":22},"养护湿度",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},893176,"铝酸盐水泥主要适宜的作业范围是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"与石灰混合使用",{"key":24,"text":101,"correct":22},"高温季节施工",{"key":27,"text":103,"correct":22},"蒸气养护作业",{"key":30,"text":105,"correct":32},"交通干道抢修",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},893177,"用于普通混凝土的砂，最佳的细度模数为（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"3.1～3.7",{"key":24,"text":113,"correct":32},"2.3～3.0",{"key":27,"text":115,"correct":22},"1.6～2.2",{"key":30,"text":117,"correct":22},"1.0～1.5",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},893178,"下列改善混凝土性能的措施中，不能提高混凝土耐久性的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":32},"掺入适量的加气剂和速凝剂",{"key":24,"text":125,"correct":22},"在规范允许条件下选用较小的水灰比",{"key":27,"text":127,"correct":22},"适当提高砂率和水泥浆体量",{"key":30,"text":129,"correct":22},"合理选用水泥品种",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},893179,"下列能够反映混凝土和易性指标的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":32},"保水性",{"key":24,"text":137,"correct":22},"抗渗性",{"key":27,"text":139,"correct":22},"抗冻性",{"key":30,"text":141,"correct":22},"充盈性",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":30,"analysis":33},893180,"与普通混凝土相比，高强混凝土的优点在于（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"延性较好",{"key":24,"text":149,"correct":22},"初期收缩小",{"key":27,"text":151,"correct":22},"水泥用量少",{"key":30,"text":153,"correct":32},"更适宜用于预应力钢筋混凝土构件",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},893181,"一般气候条件下，每拌制一立方米的M15的水泥砂浆需用强度等级为32.5的水泥约（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"260kg",{"key":24,"text":161,"correct":22},"280kg",{"key":27,"text":163,"correct":32},"310kg",{"key":30,"text":165,"correct":22},"350kg",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},893182,"下列材料中，主要用作室内装饰的材料是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"花岗石",{"key":24,"text":173,"correct":32},"陶瓷锦砖",{"key":27,"text":175,"correct":22},"瓷质砖",{"key":30,"text":177,"correct":22},"合成石面板",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},893183,"高速公路的防潮保温一般选用（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"膨胀蛭石",{"key":24,"text":185,"correct":22},"玻化微珠",{"key":27,"text":187,"correct":32},"聚苯乙烯板",{"key":30,"text":189,"correct":22},"矿渣棉",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":30,"analysis":33},893184,"某建筑物钢筋混凝土基础的混凝土设计强度等级为C60，使用硅酸盐水泥的强度等级为52.5，现场混凝土强度标准差为5MPa，则该基础混凝土的施工配制强度至少应为（ ）MPa。",[194,196,198,200],{"key":20,"text":195,"correct":22},"60.7",{"key":24,"text":197,"correct":22},"65.8",{"key":27,"text":199,"correct":22},"68.2",{"key":30,"text":201,"correct":32},"69",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},893185,"目前多用于钢网架结构的吊装方法是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":32},"高空拼装法施工",{"key":24,"text":209,"correct":22},"整体吊装法施工",{"key":27,"text":211,"correct":22},"整体顶升法施工",{"key":30,"text":213,"correct":22},"滑移吊装法施工",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},893186,"通常情况下，适宜墩台基础振动沉桩法施工的土质为（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"中密砂类土",{"key":24,"text":221,"correct":22},"砂夹卵石层",{"key":27,"text":223,"correct":32},"砂质黏土、亚黏土层",{"key":30,"text":225,"correct":22},"高压缩性黏性土",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":30,"analysis":33},893187,"大跨径桁式组合拱桥，通常采用的施工方法是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"支架安装",{"key":24,"text":233,"correct":22},"无支架安装",{"key":27,"text":235,"correct":22},"转体安装",{"key":30,"text":237,"correct":32},"悬臂安装",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},893188,"灌注桩后压浆正确的施工工艺流程是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"准备工作→灌注桩→施工桩检测→拌制水泥浆液→压注水泥浆液",{"key":24,"text":245,"correct":32},"准备工作→灌注桩施工→拌制水泥浆液→压注水泥浆液→桩检测",{"key":27,"text":247,"correct":22},"准备工作→拌制水泥浆液→灌注桩施工→压注水泥浆液→桩检测",{"key":30,"text":249,"correct":22},"准备工作→灌注桩施工→拌制水泥浆液→桩检测→压注水泥浆液",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":27,"analysis":33},893189,"在松散土体中开挖6m深的沟槽，支护方式应优先采用（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"间断式水平挡土板横撑式支撑",{"key":24,"text":257,"correct":22},"连续式水平挡土板式支撑",{"key":27,"text":259,"correct":32},"垂直挡土板式支撑",{"key":30,"text":261,"correct":22},"重力式支护结构支撑",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},893190,"装配整体式结构中，预制构件吊装就位后，应及时校准并（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":32},"采取临时固定措施，每个预制构件的临时支撑不宜少于2道",{"key":24,"text":269,"correct":22},"采取临时固定措施，每个预制构件的临时支撑不宜少于3道",{"key":27,"text":271,"correct":22},"采取永久固定措施，每个预制构件的临时支撑不宜少于2道",{"key":30,"text":273,"correct":22},"采取永久固定措施，每个预制构件的临时支撑不宜少于3道",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},893191,"轻型钢结构制作流程（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":32},"材料检验、堆放、矫正→号料→切割→矫正→成型、加工、制孔→装配→焊接→后处理→总体试验→除锈→油漆包装→库存→出厂",{"key":24,"text":281,"correct":22},"材料检验、堆放、矫正→号料→切割→成型、加工、制孔→装配→矫正→后处理→焊接→总体试验→油漆包装→除锈→库存→出厂",{"key":27,"text":283,"correct":22},"号料→材料检验、堆放、矫正→切割→矫正→成型、加工、制孔→装配→焊接→总体试验→后处理→除锈→油漆包装→库存→出厂",{"key":30,"text":285,"correct":22},"材料检验、堆放、矫正→切割→号料→矫正→成型、加工、制孔→装配→焊接→后处理→总体试验→除锈→油漆包装→出厂→库存",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},893192,"在多层及高层、高耸钢结构安装中，宜划分多个流水作业段进行安装，每节流水段内柱的分节位置宜在梁顶标高以上（ ）m处。",[290,292,294,296],{"key":20,"text":291,"correct":22},"0．5～1．0",{"key":24,"text":293,"correct":32},"1．0～1．3",{"key":27,"text":295,"correct":22},"1．3～1．8",{"key":30,"text":297,"correct":22},"1．8～2．1",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},893193,"跨度较大、侧向刚度较差的钢构件拼装应采用（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"平装法",{"key":24,"text":305,"correct":32},"立装法",{"key":27,"text":307,"correct":22},"利用模具拼装法",{"key":30,"text":309,"correct":22},"利用桁架拼装法",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},893194,"下列关于钢结构防腐涂料的施工顺序，说法正确的是( )。",[314,316,318,320],{"key":20,"text":315,"correct":32},"先左后右",{"key":24,"text":317,"correct":22},"先下后上",{"key":27,"text":319,"correct":22},"先外后里",{"key":30,"text":321,"correct":22},"先易后难",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":30,"analysis":33},893195,"在单层工业厂房结构吊装中，如安支座表面高度为15.Om（从停机面算起），绑扎点至所吊构件底面距离0.8m，索具高度为3.Om，则起重机高度至少为( )。",[326,328,330,332],{"key":20,"text":327,"correct":22},"18.2m",{"key":24,"text":329,"correct":22},"18.5m",{"key":27,"text":331,"correct":22},"18.8m",{"key":30,"text":333,"correct":32},"19.lm",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},893196,"先张法预应力施工中，预应力筋放张时，混凝土强度应符合设计要求，当设计无要求时，混凝土强度不应低于标准值的( )。",[338,340,342,344],{"key":20,"text":339,"correct":22},"70%",{"key":24,"text":341,"correct":32},"75%",{"key":27,"text":343,"correct":22},"80%",{"key":30,"text":345,"correct":22},"lOO%",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},893197,"对先张法预应力钢筋混凝土构件进行湿热养护，采取合理养护制度的主要目的是 ( )。",[350,352,354,356],{"key":20,"text":351,"correct":22},"提高混凝上强度",{"key":24,"text":353,"correct":32},"减少由于温差引起的预应力损失",{"key":27,"text":355,"correct":22},"增加混凝土的收缩和徐变",{"key":30,"text":357,"correct":22},"增大混凝土与钢筋的共同作用",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":30,"analysis":33},893198,"混凝土冬期施工时，应注意（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"不宜采用普通硅酸盐水泥",{"key":24,"text":365,"correct":22},"适当增加水灰比",{"key":27,"text":367,"correct":22},"适当添加缓凝剂",{"key":30,"text":369,"correct":32},"适当添加引气剂",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":30,"analysis":33},893201,"以下土层中不宜采用重锤夯实法夯实地基的是（）",[374,376,378,380],{"key":20,"text":375,"correct":22},"砂土",{"key":24,"text":377,"correct":22},"湿陷性黄土",{"key":27,"text":379,"correct":22},"杂填土",{"key":30,"text":381,"correct":32},"软黏土",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},893202,"屋面防水工程应满足的要求是（）。",[386,388,390,392],{"key":20,"text":387,"correct":32},"结构找坡不应小于3％",{"key":24,"text":389,"correct":22},"找平层应留设间距不小于6m的分格缝",{"key":27,"text":391,"correct":22},"分格缝不宜与排气道贯通",{"key":30,"text":393,"correct":22},"涂膜防水层的无纺布，上下胎体搭接缝不应错开",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},893203,"墙面石材铺装应符合的规定是（）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"较厚的石材应在背面粘贴玻璃纤维网布",{"key":24,"text":401,"correct":32},"较薄的石材应在背面粘贴玻璃纤维网布",{"key":27,"text":403,"correct":22},"强度较高的石材应在背面粘贴玻璃纤维网布",{"key":30,"text":405,"correct":22},"采用粘贴法施工时基层应压光",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":30,"analysis":33},893204,"悬索桥的混凝土索塔施工采用的模板形式为（）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"组合模板",{"key":24,"text":413,"correct":22},"大模板",{"key":27,"text":415,"correct":22},"台模",{"key":30,"text":417,"correct":32},"滑模",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},893205,"下列不属于水泥砂浆防水层施工特点的是（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":32},"抵抗变形能力强",{"key":24,"text":425,"correct":22},"水泥砂浆防水层是刚性防水层",{"key":27,"text":427,"correct":22},"具有较高抗渗能力",{"key":30,"text":429,"correct":22},"有较高的密实度",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":30,"analysis":33},893206,"桥面铺装即行车道铺装，不适用的铺装材料有（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"防水混凝土",{"key":24,"text":437,"correct":22},"沥青混凝土",{"key":27,"text":439,"correct":22},"混凝土",{"key":30,"text":441,"correct":32},"干硬性混凝土",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":27,"analysis":33},893207,"在松散潮湿的砂土中挖 4m深的基槽，其支护方式不宜采用（）。",[446,448,449,451],{"key":20,"text":447,"correct":22},"悬臂式板式支护",{"key":24,"text":259,"correct":22},{"key":27,"text":450,"correct":32},"间断式水平挡土板支撑",{"key":30,"text":452,"correct":22},"连续式水平挡土板支撑",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":30,"analysis":33},893208,"钢筋混凝土系杆拱桥目前大多采用（ ）施工。",[457,459,461,463],{"key":20,"text":458,"correct":22},"悬臂安装法",{"key":24,"text":460,"correct":22},"无支架吊装法",{"key":27,"text":462,"correct":22},"拱架法",{"key":30,"text":464,"correct":32},"支架法",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},893209,"基坑开挖时,采用明排法施工,其集水坑应设置在（）。",[469,471,473,475],{"key":20,"text":470,"correct":22},"基础范围以外、地下水走向的下游",{"key":24,"text":472,"correct":32},"基础范围以外、地下水走向的上游",{"key":27,"text":474,"correct":22},"基础范围以内、地下水走向的上游",{"key":30,"text":476,"correct":22},"基础范围以内、地下水走向的下游",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":30,"analysis":33},893210,"在夏季，由于混凝土凝结较快，必须在搅拌好之后1h内尽快浇完，否则应掺入适当（ ）。",[481,483,485,487],{"key":20,"text":482,"correct":22},"减水剂",{"key":24,"text":484,"correct":22},"早强剂",{"key":27,"text":486,"correct":22},"泵送剂",{"key":30,"text":488,"correct":32},"缓凝剂",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":20,"analysis":33},893211,"现场采用重叠法预制钢筋混凝土桩时，上层桩的浇筑应等到下层桩混凝土强度达到设计强度等级的（）。",[493,495,497,498],{"key":20,"text":494,"correct":32},"30%",{"key":24,"text":496,"correct":22},"60%",{"key":27,"text":339,"correct":22},{"key":30,"text":499,"correct":22},"100%",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":27,"analysis":33},893212,"履带式起重机的主要参数不包括（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":22},"起重量",{"key":24,"text":507,"correct":22},"起重高度",{"key":27,"text":509,"correct":32},"起重时间",{"key":30,"text":511,"correct":22},"起重幅度",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":24,"analysis":33},893213,"装配整体式结构中，预制构件的混凝土强度等级不宜低于（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":22},"C25",{"key":24,"text":519,"correct":32},"C30",{"key":27,"text":521,"correct":22},"C35",{"key":30,"text":523,"correct":22},"C40",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":27,"analysis":33},893214,"地下连续墙施工工艺流程（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":22},"挖导沟→筑道墙→挖槽→吊放接头管（接头箱）→吸泥、清底、刷壁→吊放钢筋笼→浇筑混凝土→插入混凝土导管→结束",{"key":24,"text":531,"correct":22},"挖导沟→吸泥、清底、刷壁→筑道墙→挖槽→吊放钢筋笼→吊放接头管（接头箱）→插入混凝土导管→浇筑混凝土→结束",{"key":27,"text":533,"correct":32},"挖导沟→筑道墙→挖槽→吸泥、清底、刷壁→吊放接头管（接头箱）→吊放钢筋笼→插入混凝土导管→浇筑混凝土一结束",{"key":30,"text":535,"correct":22},"筑道墙→挖导沟→挖槽→吸泥、清底、刷壁→浇筑混凝土→吊放接头管（接头箱）→吊放钢筋笼→插入混凝土导管一结束",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":20,"analysis":33},893215,"在钢筋混凝土预制桩打桩施工中，仅适用于软弱土层的接桩方法是（）。",[540,542,544,546],{"key":20,"text":541,"correct":32},"硫磺胶泥锚接",{"key":24,"text":543,"correct":22},"焊接连接",{"key":27,"text":545,"correct":22},"法兰连接",{"key":30,"text":547,"correct":22},"机械连接",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":20,"analysis":33},893216,"对于大跨度的焊接球节点钢管网架的吊装，一般选用（ ）。",[552,553,554,555],{"key":20,"text":209,"correct":32},{"key":24,"text":213,"correct":22},{"key":27,"text":207,"correct":22},{"key":30,"text":211,"correct":22},{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":27,"analysis":33},893217,"下列属于作用于脚手架上的可变荷载为（）。",[560,562,564,566],{"key":20,"text":561,"correct":22},"构、配件自重",{"key":24,"text":563,"correct":22},"剪刀撑自重",{"key":27,"text":565,"correct":32},"作业层上器具和材料的自重",{"key":30,"text":567,"correct":22},"架体立杆自重",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":24,"analysis":33},893218,"后张法工艺流程（ ）。",[572,574,576,578],{"key":20,"text":573,"correct":22},"安装底模→埋管制孔→安钢筋骨架、支模→浇筑混凝土→养护、拆模→抽管→清理孔道→穿筋→张拉预应力筋→孔道灌浆→起吊运输",{"key":24,"text":575,"correct":32},"安装底模→安钢筋骨架、支模→埋管制孔→浇筑混凝土→抽管→养护、拆模→清理孔道→穿筋→张拉预应力筋→孔道灌浆→起吊运输",{"key":27,"text":577,"correct":22},"安钢筋骨架、支模→安装底模→埋管制孔→浇筑混凝土→抽管→养护、拆模→清理孔道→穿筋→孔道灌浆→张拉预应力筋→起吊运输",{"key":30,"text":579,"correct":22},"安装底模→安钢筋骨架、支模→浇筑混凝土→埋管制孔→抽管→养护、拆模→穿筋→清理孔道→张拉预应力筋→孔道灌浆→起吊运输",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":27,"analysis":33},893219,"某12层住宅楼在拟定结构吊装方案时，应选择的起重机械为（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":22},"履带式起重机",{"key":24,"text":587,"correct":22},"塔式起重机",{"key":27,"text":589,"correct":32},"自升式塔式起重机",{"key":30,"text":591,"correct":22},"桅杆起重机",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":24,"analysis":33},893220,"基底标高不同时，砌体结构施工应（ ）。",[596,598,600,602],{"key":20,"text":597,"correct":22},"从短边砌起，并从低处向高处搭砌",{"key":24,"text":599,"correct":32},"从低处砌起，并从高处向低处搭砌",{"key":27,"text":601,"correct":22},"从长边砌起，并从高处向低处搭砌",{"key":30,"text":603,"correct":22},"从高处砌起，并从高处向低处搭砌",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":27,"analysis":33},893221,"在吊车梁安装中，梁与制动架之间用（ ）连接。",[608,610,612,614],{"key":20,"text":609,"correct":22},"焊接",{"key":24,"text":611,"correct":22},"普通螺栓",{"key":27,"text":613,"correct":32},"高强螺栓",{"key":30,"text":615,"correct":22},"铆接",[617,620,623,626,629,632],{"id":15,"name":618,"category":7,"favorite":619},"领导干部任职前廉政法规知识测试题",92,{"id":621,"name":622,"category":7,"favorite":15},595,"建筑结构与设备",{"id":624,"name":625,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":627,"name":628,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":630,"name":631,"category":7,"favorite":8},534,"BIM工程师",{"id":633,"name":631,"category":7,"favorite":8},535]