[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-580-35":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":468},{"id":5,"name":6,"category":7,"favorite":8},580,"[土木建筑工程]建设工程计量与计价实务","建筑工程",0,35,50,1733,[13,38,53,68,83,98,113,128,143,158,173,188,202,217,231,245,260,274,288,302,316,330,344,356,370,384,398,413,427,440,450,456,462],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},894733,2,"多选题","下列属于 BIM技术特点的是（）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","不可出图性",false,{"key":24,"text":25,"correct":26},"B","协调性",true,{"key":28,"text":29,"correct":26},"C","参数化",{"key":31,"text":32,"correct":22},"D","数字化",{"key":34,"text":35,"correct":26},"E","可视化","BCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},894734,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），回填工程量计算正确的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"场地回填，回填面积乘以平均回填厚度",{"key":24,"text":45,"correct":26},"室内回填，主墙间净面积乘以回填厚度，不扣除间隔墙",{"key":28,"text":47,"correct":22},"室内回填，主墙间净面积乘以回填厚度，扣除间隔墙",{"key":31,"text":49,"correct":22},"基础回填，挖方清单项目工程量减去自然地坪以下埋设的基础体积（不包括基础垫层）",{"key":34,"text":51,"correct":26},"基础回填，挖方清单项目工程量减去自然地坪以下埋设的基础体积（包括基础垫层及其他构筑物）","ABE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},894735,"根据《房屋建筑与装饰工程工程量计算规范》GB 50854-2013规定，关于基坑支护工程量计算正确的为（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"地下连续墙按设计图示墙中心线长度以m计算",{"key":24,"text":60,"correct":26},"预制钢筋混凝土板桩按设计图示数量以根计算",{"key":28,"text":62,"correct":22},"钢板桩按设计图示数量以根计算",{"key":31,"text":64,"correct":22},"喷射混凝土按设计图示面积乘以喷层厚度以体积计算",{"key":34,"text":66,"correct":26},"咬合灌注桩按设计图示尺寸以桩长计算","BE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},894736,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），关于管沟土方工程量计算的说法，正确的有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"按管沟宽乘以深度再乘以管道中心线长度计算",{"key":24,"text":75,"correct":26},"按设计管道中心线长度计算",{"key":28,"text":77,"correct":26},"按设计管底垫层面积乘以深度计算",{"key":31,"text":79,"correct":26},"按管道外径水平投影面积乘以深度计算",{"key":34,"text":81,"correct":22},"按管沟开挖断面乘以管道中心线长度计算","BCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},894737,"某坡地建筑基础，设计基底垫层宽为8.0m，基础中心线长为22.0m，开挖深度为1.6m，地基为中等风化软岩，根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013）规定，关于基础石方的项目列项或工程量计算正确的为（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"按挖沟槽石方列项",{"key":24,"text":90,"correct":22},"按挖基坑石方列项",{"key":28,"text":92,"correct":26},"按挖一般石方列项",{"key":31,"text":94,"correct":26},"工程量为281.6m3",{"key":34,"text":96,"correct":22},"工程量为22.0m","CD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},894738,"下列措施项目中，应按分部分项工程量清单编制方式编制的有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"超高施工增加",{"key":24,"text":105,"correct":22},"建筑物的临时保护设施",{"key":28,"text":107,"correct":26},"大型机械设备进出场及安拆",{"key":31,"text":109,"correct":22},"已完工程及设备保护",{"key":34,"text":111,"correct":26},"施工排水、降水","ACE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},894739,"下列费用中，由招标人填写金额，投标人直接计入投标总价的有（ ）。",[117,119,121,123,125],{"key":20,"text":118,"correct":26},"材料设备暂估价",{"key":24,"text":120,"correct":26},"专业工程暂估价",{"key":28,"text":122,"correct":26},"暂列金额",{"key":31,"text":124,"correct":22},"计日工合价",{"key":34,"text":126,"correct":22},"总承包服务费","ABC",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":142,"analysis":37},894740,"下列选项中，属于现代建设工程更加注重分工的专业化、精细化和协作的原因是（ ）。",[132,134,136,138,140],{"key":20,"text":133,"correct":26},"由于建筑单体的体量大、复杂度高，其三维信息量非常巨大，在自动计算工程量时会消耗巨大的计算机资源，计算效率低",{"key":24,"text":135,"correct":26},"智能建筑、节能设施等各类专业工程越来越复杂，其技术更新越来越快，可以通过协作来高速完成复杂工程的精细计量",{"key":28,"text":137,"correct":22},"政府不断的推动",{"key":31,"text":139,"correct":22},"设计师的要求",{"key":34,"text":141,"correct":22},"业主单位的要求","AB",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":157,"analysis":37},894741,"根据《建设工程工程量清单计价规范》（GB50500-2013），关于投标文件措施项目计价表的编制，下列说法正确的有（ ）。",[147,149,151,153,155],{"key":20,"text":148,"correct":26},"单价措施项目计价表应采用综合单价方式计价",{"key":24,"text":150,"correct":22},"总价措施项目计价表应包含规费和建筑业增值税",{"key":28,"text":152,"correct":26},"不能精确计量的措施项目应编制总价措施项目计价表",{"key":31,"text":154,"correct":22},"总价措施项目的内容确定与招标人拟定的措施清单无关",{"key":34,"text":156,"correct":22},"总价措施项目的内容确定与投标人投标时拟定的施工组织设计无关","AC",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":172,"analysis":37},894742,"根据《建设工程工程量清单计价规范》（GB50500-2013），关于工程变更价款的调整方法，下列说法中正确的有（ ）。",[162,164,166,168,170],{"key":20,"text":163,"correct":26},"工程变更导致已标价工程量清单项目的工程量变化小于15%，仍采用原单价",{"key":24,"text":165,"correct":22},"已标价的工程量清单中没有相同或类似的工程变更项目，由发包人提出变更工程项目的总价和单价",{"key":28,"text":167,"correct":26},"安全文明施工费按照实际发生变化的措施项目并依据国家或省级、行业建设主管部门的规定进行调整",{"key":31,"text":169,"correct":26},"采用单价方式计算的措施费，按照分部分项工程费的调整方法确定变更单价",{"key":34,"text":171,"correct":22},"按系数计算的措施项目费均应按照实际发生变化的措施项目调整，系数不得浮动","ACD",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":187,"analysis":37},894743,"《2017届预算定额》适用于（ ）。",[177,179,181,183,185],{"key":20,"text":178,"correct":26},"市政新建工程",{"key":24,"text":180,"correct":26},"园林绿化工程",{"key":28,"text":182,"correct":26},"通用安装工程",{"key":31,"text":184,"correct":22},"抢险救灾工程",{"key":34,"text":186,"correct":26},"园林养护工程","ABCE",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":97,"analysis":37},894744,"木结构工程采用（ ）时，相应定额制作人工及机械乘以系数1.35。",[192,194,196,198,200],{"key":20,"text":193,"correct":22},"一类木种",{"key":24,"text":195,"correct":22},"二类木种",{"key":28,"text":197,"correct":26},"三类木种",{"key":31,"text":199,"correct":26},"四类木种",{"key":34,"text":201,"correct":22},"五类木种",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":216,"analysis":37},894745,"规费是指按国家法律、法规规定，由省级政府和省级有关权力部门规定必须缴纳或计取的费用，内容包括有（ ）。",[206,208,210,212,214],{"key":20,"text":207,"correct":26},"社会保险费",{"key":24,"text":209,"correct":26},"住房公积金",{"key":28,"text":211,"correct":26},"水利建设基金",{"key":31,"text":213,"correct":26},"环境保护税",{"key":34,"text":215,"correct":22},"工程排污费","ABCD",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":216,"analysis":37},894746,"综合单价包括完成一个规定清单项目所需的（ ）。",[221,223,225,227,229],{"key":20,"text":222,"correct":26},"人工费",{"key":24,"text":224,"correct":26},"材料费",{"key":28,"text":226,"correct":26},"施工机具使用费",{"key":31,"text":228,"correct":26},"企业管理费",{"key":34,"text":230,"correct":22},"措施项目费",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":52,"analysis":37},894747,"工程竣工结算包括（ ）。",[235,237,239,241,243],{"key":20,"text":236,"correct":26},"单位工程竣工结算",{"key":24,"text":238,"correct":26},"单项工程竣工结算",{"key":28,"text":240,"correct":22},"分部工程竣工结算",{"key":31,"text":242,"correct":22},"分项工程竣工结算",{"key":34,"text":244,"correct":26},"建设项目竣工总结算",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":259,"analysis":37},894748,"下列属于民用 建筑的主要构造部分是（ ）",[249,251,253,255,257],{"key":20,"text":250,"correct":26},"基础",{"key":24,"text":252,"correct":26},"墙体",{"key":28,"text":254,"correct":22},"阳台",{"key":31,"text":256,"correct":26},"楼梯",{"key":34,"text":258,"correct":22},"台阶","ABD",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":187,"analysis":37},894749,"坡屋顶设计形式有（ ）",[264,266,268,270,272],{"key":20,"text":265,"correct":26},"单边坡",{"key":24,"text":267,"correct":26},"硬山两边坡",{"key":28,"text":269,"correct":26},"悬山两边坡",{"key":31,"text":271,"correct":22},"三边坡",{"key":34,"text":273,"correct":26},"四边坡",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":36,"analysis":37},894750,"建筑物的基础，按构造方式可分为（ ）",[278,280,282,284,286],{"key":20,"text":279,"correct":22},"刚性基础",{"key":24,"text":281,"correct":26},"条形基础",{"key":28,"text":283,"correct":26},"独立基础",{"key":31,"text":285,"correct":22},"柔性基础",{"key":34,"text":287,"correct":26},"箱形基础",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":259,"analysis":37},894751,"常按涂料分散介质不同涂料可以分为（ ）",[292,294,296,298,300],{"key":20,"text":293,"correct":26},"溶剂型涂料",{"key":24,"text":295,"correct":26},"水性涂料",{"key":28,"text":297,"correct":22},"有机高分子涂料",{"key":31,"text":299,"correct":26},"乳液涂料",{"key":34,"text":301,"correct":22},"油性涂料",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":157,"analysis":37},894752,"石子的强度可用（ ）表示",[306,308,310,312,314],{"key":20,"text":307,"correct":26},"岩石立方体强度",{"key":24,"text":309,"correct":22},"最大粒径",{"key":28,"text":311,"correct":26},"压碎指标",{"key":31,"text":313,"correct":22},"级配等级",{"key":34,"text":315,"correct":22},"密度",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":259,"analysis":37},894753,"配制大体积混凝土时可用（ ）水泥",[320,322,324,326,328],{"key":20,"text":321,"correct":26},"矿渣硅酸盐",{"key":24,"text":323,"correct":26},"火山质硅酸盐",{"key":28,"text":325,"correct":22},"普通硅酸盐",{"key":31,"text":327,"correct":26},"粉煤灰硅酸盐",{"key":34,"text":329,"correct":22},"白色硅酸盐",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":127,"analysis":37},894754,"建筑施工图主要包括（ ）",[334,336,338,340,342],{"key":20,"text":335,"correct":26},"建筑总平面图",{"key":24,"text":337,"correct":26},"建筑立面图",{"key":28,"text":339,"correct":26},"建筑剖面图",{"key":31,"text":341,"correct":22},"基础平面图",{"key":34,"text":343,"correct":22},"结构平面图",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":259,"analysis":37},894755,"下列属于造价按造价形成内容划分的是（ ）",[348,350,352,353,354],{"key":20,"text":349,"correct":26},"分部分项工程费",{"key":24,"text":351,"correct":26},"其他项目费",{"key":28,"text":228,"correct":22},{"key":31,"text":230,"correct":26},{"key":34,"text":355,"correct":22},"机械费",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":36,"analysis":37},894757,"根据《房屋建筑与装饰工程工程量计算规范》关于装饰工程量计算，说法正确的有（ ）。",[360,362,364,366,368],{"key":20,"text":361,"correct":22},"自流坪地面按图示尺寸以体积计算",{"key":24,"text":363,"correct":26},"整体层按设计图示尺寸以面积计算",{"key":28,"text":365,"correct":26},"块料踢脚线可按延长米计算",{"key":31,"text":367,"correct":22},"石材台阶面装饰设计图示以台阶最上踏步外沿以外水平投影面积计算",{"key":34,"text":369,"correct":26},"塑料板楼地面按按设计图示尺寸以面积计算",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":127,"analysis":37},894759,"可以实现施工过程中的可视化、可控化工程造价的动态管理的BIM 技术是（ ）",[374,376,378,380,382],{"key":20,"text":375,"correct":26},"三维空间",{"key":24,"text":377,"correct":26},"四维时间",{"key":28,"text":379,"correct":26},"五维成本",{"key":31,"text":381,"correct":22},"静态可视施工",{"key":34,"text":383,"correct":22},"静态变更管理",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":259,"analysis":37},894760,"建设工程项目是指为完成依法立项的（ ）等各类工程而进行的、有起止日期的、达到规定要求的一组相互关联的受控活动组成的特定过程，包括策划、勘察、设计、采购、施工、试运行、竣工验收和考核评价等。",[388,390,392,394,396],{"key":20,"text":389,"correct":26},"新建",{"key":24,"text":391,"correct":26},"扩建",{"key":28,"text":393,"correct":22},"迁建",{"key":31,"text":395,"correct":26},"改建",{"key":34,"text":397,"correct":22},"恢复",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":412,"analysis":37},894761,"工程造价中的（ ）反应了工程造价的计价具有动态性和阶段性的特点。",[402,404,406,408,410],{"key":20,"text":403,"correct":22},"投标控制价",{"key":24,"text":405,"correct":26},"投标价",{"key":28,"text":407,"correct":26},"合同价",{"key":31,"text":409,"correct":26},"招标控制价",{"key":34,"text":411,"correct":26},"竣工结算","BCDE",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":157,"analysis":37},894762,"在工程建设的施工阶段，工程竣工验收合格后，发、承包人应当办清竣工结算，结算时，先由承包人提交竣工结算书，由（ ）核对。",[417,419,421,423,425],{"key":20,"text":418,"correct":26},"发包人",{"key":24,"text":420,"correct":22},"工程造价管理机构",{"key":28,"text":422,"correct":26},"业主",{"key":31,"text":424,"correct":22},"行业建设主管部门",{"key":34,"text":426,"correct":22},"人民法",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":412,"analysis":37},894763,"建设工程的各个阶段需要确定的各种建筑工程造价有（ ）。",[431,433,435,437,439],{"key":20,"text":432,"correct":22},"投资概算",{"key":24,"text":434,"correct":26},"设计概算",{"key":28,"text":436,"correct":26},"施工图预算",{"key":31,"text":438,"correct":26},"工程结算",{"key":34,"text":411,"correct":26},{"id":441,"libraryId":5,"type":442,"typeLabel":443,"stem":444,"options":445,"answer":449,"analysis":37},894764,3,"判断题","竣工结算的工程量应按招标文件中的工程量确定。（ ）",[446,448],{"key":20,"text":447,"correct":22},"正确",{"key":24,"text":449,"correct":26},"错误",{"id":451,"libraryId":5,"type":442,"typeLabel":443,"stem":452,"options":453,"answer":449,"analysis":37},894765,"竣工结算中的计日工表和招标控制价、投标报价中的计日工表中所列内容是完全一致的。（ ）",[454,455],{"key":20,"text":447,"correct":22},{"key":24,"text":449,"correct":26},{"id":457,"libraryId":5,"type":442,"typeLabel":443,"stem":458,"options":459,"answer":447,"analysis":37},894766,"当事人就同一建设工程另行订立的建设工程施工合同与经过备案的中标合同实质性内容不一致时，应当以备案的中标合同作为结算工程价款的依据。（ ）",[460,461],{"key":20,"text":447,"correct":26},{"key":24,"text":449,"correct":22},{"id":463,"libraryId":5,"type":442,"typeLabel":443,"stem":464,"options":465,"answer":447,"analysis":37},894767,"如果投标报价汇总表的投标总价与投标函填报的投标总价不一致，应当以投标函中填写的大写金额为准。（ ）",[466,467],{"key":20,"text":447,"correct":26},{"key":24,"text":449,"correct":22},[469,473,476,479,482,485],{"id":470,"name":471,"category":7,"favorite":472},1,"领导干部任职前廉政法规知识测试题",92,{"id":474,"name":475,"category":7,"favorite":470},595,"建筑结构与设备",{"id":477,"name":478,"category":7,"favorite":470},715,"招标采购专业知识与法律法规",{"id":480,"name":481,"category":7,"favorite":470},848,"市政方向-通用基础",{"id":483,"name":484,"category":7,"favorite":8},534,"BIM工程师",{"id":486,"name":484,"category":7,"favorite":8},535]