[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-580-32":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":732},{"id":5,"name":6,"category":7,"favorite":8},580,"[土木建筑工程]建设工程计量与计价实务","建筑工程",0,32,50,1733,[13,38,53,68,83,98,113,128,142,157,171,185,199,214,229,244,254,268,283,297,311,325,340,354,369,383,397,410,425,437,451,465,479,493,507,521,535,550,564,578,593,607,620,634,648,662,676,691,704,718],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},894575,2,"多选题","工程量清单是（ ）的依据。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","进行工程索赔",true,{"key":24,"text":25,"correct":26},"B","编制项目投资估算",false,{"key":28,"text":29,"correct":22},"C","编制最高投标限价",{"key":31,"text":32,"correct":22},"D","支付工程款",{"key":34,"text":35,"correct":22},"E","办理竣工结算","ACDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},894576,"根据《建设工程工程量清单计价规范》（GB50500—2013），应列入规费清单的费用是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"上级单位管理费",{"key":24,"text":45,"correct":22},"住房公积金",{"key":28,"text":47,"correct":26},"大型机械进出场及安拆费",{"key":31,"text":49,"correct":26},"危险作业意外伤害保险费",{"key":34,"text":51,"correct":22},"工程排污费","BE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},894577,"下列资料中，属于编制招标工程量清单和最高投标限价共同依据的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"施工现场情况和施工企业定额",{"key":24,"text":60,"correct":26},"工程造价管理机构发布的工程造价信息",{"key":28,"text":62,"correct":22},"建设工程设计文件及相关资料",{"key":31,"text":64,"correct":22},"与建设项目相关的标准、规范、技术资料",{"key":34,"text":66,"correct":22},"建设工程工程量清单计价规范","CDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},894578,"关于编制工程量清单其他项目费报价的说法，正确的有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"暂列金额按招标人在其他项目清单中列出的金额填写",{"key":24,"text":75,"correct":26},"材料暂估价由投标人根据实际情况自主确定",{"key":28,"text":77,"correct":22},"总承包服务费由投标人根据招标文件中列出的内容和提出的要求自主确定",{"key":31,"text":79,"correct":26},"专业工程暂估价由投标人根据施工组织设计或施工方案自主确定",{"key":34,"text":81,"correct":22},"计日工按招标人在其他项目清单中列出的项目和数量，由投标人自主确定综合单价并计算计日工费用","ACE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},894579,"绘图输入的步骤包括（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"绘制主体构件",{"key":24,"text":90,"correct":22},"导入钢筋算量软件做的工程",{"key":28,"text":92,"correct":22},"门窗与过梁的定义、绘制",{"key":31,"text":94,"correct":26},"汇总计算",{"key":34,"text":96,"correct":22},"新建楼梯","ABCE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},894580,"清单项输入是招标方运用软件编制分部分项工程量清单的步骤之一，清单项输入可分为（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"直接输入",{"key":24,"text":105,"correct":26},"图元公式输入",{"key":28,"text":107,"correct":26},"工程量明细输入",{"key":31,"text":109,"correct":22},"查询输入",{"key":34,"text":111,"correct":22},"补充清单","ADE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},894581,"按照财政部、国家发展改革委和住房城乡建设部的有关文件规定，竣工决算是由（ ）组成。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"竣工财务决算说明书",{"key":24,"text":120,"correct":22},"竣工财务决算报表",{"key":28,"text":122,"correct":22},"工程竣工图",{"key":31,"text":124,"correct":22},"工程竣工造价对比分析",{"key":34,"text":126,"correct":26},"工程结算文件","ABCD",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":127,"analysis":37},894582,"按照财办建[2008]91号文的规定，竣工决算的编制依据有（ ）。",[132,134,136,138,140],{"key":20,"text":133,"correct":22},"经批准的施工图设计及其施工图预算书",{"key":24,"text":135,"correct":22},"设计交底或图纸会审会议纪要",{"key":28,"text":137,"correct":22},"设计变更记录、施工记录或施工签证单及其他施工发生的费用记录",{"key":31,"text":139,"correct":22},"招标控制价，承包合同、工程结算等有关资料",{"key":34,"text":141,"correct":26},"双方签订的建筑安装工程承包合同终结凭证",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},894583,"编制建设项目竣工决算必须满足的条件包括（）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"经批准的初步设计所决定的工程内容已完成",{"key":24,"text":149,"correct":22},"单项工程或建设项目竣工结算已完成",{"key":28,"text":151,"correct":26},"收尾工程竣工结算已完成",{"key":31,"text":153,"correct":22},"预留费用不超过规定比例",{"key":34,"text":155,"correct":22},"涉及工程质量纠纷事项已处理完毕","ABDE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":170,"analysis":37},894584,"编制工程竣工决算应具备的条件有（ ）。",[161,163,165,166,168],{"key":20,"text":162,"correct":26},"会计核算及财务管理资料已完成",{"key":24,"text":164,"correct":22},"经批准的初步设计所确定的工程内容已完成",{"key":28,"text":149,"correct":22},{"key":31,"text":167,"correct":22},"收尾工程投资和预留费用不超过规定的比例",{"key":34,"text":169,"correct":22},"涉及法律诉讼、工程质量纠纷的事项已处理完毕","BCDE",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":170,"analysis":37},894585,"下列选项属于流动资产的有（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":26},"专利",{"key":24,"text":178,"correct":22},"现金",{"key":28,"text":180,"correct":22},"存款",{"key":31,"text":182,"correct":22},"存货",{"key":34,"text":184,"correct":22},"预付款",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":156,"analysis":37},894586,"建设项目竣工财务决算表中，属于“资金来源”的有（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"专项建设基金拨款",{"key":24,"text":192,"correct":22},"项目资本公积金",{"key":28,"text":194,"correct":26},"有价证券",{"key":31,"text":196,"correct":22},"待冲基建支出",{"key":34,"text":198,"correct":22},"未交款",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},894587,"根据《建设工程工程量清单计价规范》GB 50500--2013，关于工程变更价款的调整方法，下列说法中正确的有（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"工程变更导致已标价工程量清单项目的工程量变化小于15％，仍采用原单价",{"key":24,"text":206,"correct":26},"已标价的工程量清单中没有相同或类似的工程变更项目，由发包人提出变更工程项目的总价和单价",{"key":28,"text":208,"correct":22},"安全文明施工费按照实际发生变化的措施项目并依据国家或省级、行业建设主管部门的规定进行调整",{"key":31,"text":210,"correct":22},"采用单价方式计算的措施费，按照分部分项工程费的调整方法确定变更单价",{"key":34,"text":212,"correct":26},"按系数计算的措施项目费均应按照实际发生变化的措施项目调整，系数不得浮动","ACD",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":228,"analysis":37},894588,"关于施工期间合同暂估价的调整，下列做法中正确的有（ ）。",[218,220,222,224,226],{"key":20,"text":219,"correct":26},"不属于依法必须招标的材料，应直接按承包人自主采购的价格调整暂估价",{"key":24,"text":221,"correct":22},"属于依法必须招标的工程设备，以中标价取代暂估价",{"key":28,"text":223,"correct":26},"属于依法必须招标的专业工程，承包人不参加投标的，应由承包人作为招标人，组织招标的费用一般由发包人另行支付",{"key":31,"text":225,"correct":22},"属于依法必须招标的专业工程，承包人参加投标的，应由发包人作为招标人，同等条件下优先选择承包人中标",{"key":34,"text":227,"correct":22},"不属于依法必须招标的专业工程，应按工程变更事件的合同价款调整方法确定专业工程价款","BDE",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":243,"analysis":37},894589,"根据《建设工程工程量清单计价规范》GB 50500--2013，关于单价合同措施项目费的调整，下列说法中正确的有（ ）。",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"设计变更引起措施项目发生变化的，可以调整措施项目费",{"key":24,"text":236,"correct":22},"招标工程量清单分部分项工程漏项引起措施项目发生变化的，可以调整措施项目费",{"key":28,"text":238,"correct":26},"招标工程量清单措施项目缺项的，不应调整措施项目费",{"key":31,"text":240,"correct":22},"承包人提出调整措施项目费的，应事先将实施方案报发包人批准",{"key":34,"text":242,"correct":26},"措施项目费的调整方法与分部分项工程费的调整方法相同","ABD",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":213,"analysis":37},894590,"根据《建设工程工程量清单计价规范》（GB50500-2013），关于工程变更价款的调整方法，下列说法中正确的有（ ）。",[248,250,251,252,253],{"key":20,"text":249,"correct":22},"工程变更导致已标价工程量清单项目的工程量变化小于15%，仍采用原价格",{"key":24,"text":206,"correct":26},{"key":28,"text":208,"correct":22},{"key":31,"text":210,"correct":22},{"key":34,"text":212,"correct":26},{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":36,"analysis":37},894591,"因发包人原因导致工程延期时，下列索赔事件能够成立的有（ ）。",[258,260,262,264,266],{"key":20,"text":259,"correct":22},"材料超期储存费用索赔",{"key":24,"text":261,"correct":26},"材料保管不善造成的损坏费用索赔",{"key":28,"text":263,"correct":22},"现场管理费索赔",{"key":31,"text":265,"correct":22},"保险费索赔",{"key":34,"text":267,"correct":22},"保函手续费索赔",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":282,"analysis":37},894592,"支持承包人工程索赔成立的基本条件有（ ）。",[272,274,276,278,280],{"key":20,"text":273,"correct":26},"合同履行过程中承包人没有违约行为",{"key":24,"text":275,"correct":22},"索赔事件已造成承包人直接经济损失或工期延误",{"key":28,"text":277,"correct":22},"索赔事件是因非承包人的原因引起的",{"key":31,"text":279,"correct":22},"承包人已按合同规定提交了索赔意向通知、索赔报告及相关证明材料",{"key":34,"text":281,"correct":26},"发包人已按合同规定给予了承包人答复","BCD",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":243,"analysis":37},894593,"施工合同履行过程中，导致工程量清单缺项并应调整合同价款的原因有（ ）。",[287,289,291,293,295],{"key":20,"text":288,"correct":22},"设计变更",{"key":24,"text":290,"correct":22},"施工条件改变",{"key":28,"text":292,"correct":26},"承包人投标漏项",{"key":31,"text":294,"correct":22},"工程量清单编制错误",{"key":34,"text":296,"correct":26},"施工技术进步",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":228,"analysis":37},894594,"在投标报价时，企业要根据自身的优劣势和招标项目的特点来确定报价策略，通常情况下报价可适当低一些的工程有（ ）。",[301,303,305,307,309],{"key":20,"text":302,"correct":26},"特殊的工程",{"key":24,"text":304,"correct":22},"竞争对手多，竞争激烈的工程",{"key":28,"text":306,"correct":26},"专业要求高的技术密集型工程",{"key":31,"text":308,"correct":22},"非急需工程",{"key":34,"text":310,"correct":22},"投标单位急于打入某一市场、某一地区",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":82,"analysis":37},894595,"关于投标报价编制的说法，正确的有（ ）。",[315,317,319,321,323],{"key":20,"text":316,"correct":22},"投标人可委托有相应资质的工程造价咨询人编制投标价",{"key":24,"text":318,"correct":26},"投标人可依据市场需求对所有费用自主报价",{"key":28,"text":320,"correct":22},"投标人的投标报价不得低于其工程成本",{"key":31,"text":322,"correct":26},"投标人的某一子项目报价高于招标人相应基准价的应予废标",{"key":34,"text":324,"correct":22},"应该以施工方案、技术措施等作为投标报价计算的基本条件",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":339,"analysis":37},894596,"采用《建设工程工程量清单计价规范》（GB 50500—2013）进行招标的工程，企业在投标报价时，不得作为竞争性费用的有（ ）。",[329,331,333,335,337],{"key":20,"text":330,"correct":26},"垂直运输费",{"key":24,"text":332,"correct":26},"总承包服务费",{"key":28,"text":334,"correct":26},"分部分项工程费",{"key":31,"text":336,"correct":22},"规费",{"key":34,"text":338,"correct":22},"税金","DE",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":243,"analysis":37},894597,"根据《建设工程工程量清单计价规范》GB50500--2013，招标控制价中综合单价中应考虑的风险因素包括（ ）。",[344,346,348,350,352],{"key":20,"text":345,"correct":22},"项目管理的复杂性",{"key":24,"text":347,"correct":22},"项目的技术难度",{"key":28,"text":349,"correct":26},"人工单价的市场变化",{"key":31,"text":351,"correct":22},"材料价格的市场风险",{"key":34,"text":353,"correct":26},"税金、规费的政策变化",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":368,"analysis":37},894598,"根据《建设工程工程量清单计价规范》（GB 50500—2013），关于全额政府投资项目最高投标限价的说法，正确的有（ ）。",[358,360,362,364,366],{"key":20,"text":359,"correct":22},"最高投标限价是对招标工程限定的最高限价",{"key":24,"text":361,"correct":22},"最高投标限价超过批准的概算时，招标人应将其报原概算审批部门审核",{"key":28,"text":363,"correct":22},"投标人的投标报价高于最高投标限价的，其投标应予以拒绝",{"key":31,"text":365,"correct":26},"最高投标限价可以在公布后上调或下浮",{"key":34,"text":367,"correct":26},"最高投标限价的作用与标底完全相同","ABC",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":112,"analysis":37},894599,"关于工程施工项目最高投标限价编制的注意事项，下列说法正确的有（ ）。",[373,375,377,379,381],{"key":20,"text":374,"correct":22},"未采用工程造价管理机关发布的工程造价信息时，应予以说明",{"key":24,"text":376,"correct":26},"施工机械设备的选型应本着经济实用、平均有效的原则确定",{"key":28,"text":378,"correct":26},"暂估价中的材料单价应通过市场调查确定",{"key":31,"text":380,"correct":22},"不可竞争措施项目费应按国家有关规定计算",{"key":34,"text":382,"correct":22},"竞争性措施项目费应依据经专家论证确认的施工组织设计或实施方案确定",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":112,"analysis":37},894600,"按我国现行建筑安装工程费用项目组成的规定，下列属于企业管理费内容的有（ ）。",[387,389,391,393,395],{"key":20,"text":388,"correct":22},"企业管理人员办公用的文具、纸张等费用",{"key":24,"text":390,"correct":26},"企业施工生成和管理使用的属于固定资产的交通工具的购置、维修费",{"key":28,"text":392,"correct":26},"对建筑以及材料、构件和建筑安装进行特殊鉴定检查所发生的检验试验费",{"key":31,"text":394,"correct":22},"按全部职工工资总额比例计提的工会经费",{"key":34,"text":396,"correct":22},"为施工生产筹集资金.履约担保所发生的财务费用",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":409,"analysis":37},894601,"根据《建筑安装工程费用项目组成》（建标[2013]44 号）下列费用中，属于规费的有（ ）。",[401,402,404,406,407],{"key":20,"text":51,"correct":22},{"key":24,"text":403,"correct":26},"安全施工费",{"key":28,"text":405,"correct":26},"环境保养费",{"key":31,"text":45,"correct":22},{"key":34,"text":408,"correct":26},"劳动保护费","AD",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":424,"analysis":37},894602,"按照费用构成要素划分的建筑安装工程费用项目组成规定，下列费用项目应列入材料费的有（ ）。",[414,416,418,420,422],{"key":20,"text":415,"correct":22},"周转材料的摊销，租赁费用",{"key":24,"text":417,"correct":22},"材料运输损耗费用",{"key":28,"text":419,"correct":26},"施工企业对材料进行一般鉴定，检查发生的费用",{"key":31,"text":421,"correct":26},"材料运杂费中的增值税进项税额",{"key":34,"text":423,"correct":22},"材料采购及保管费用","ABE",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":97,"analysis":37},894604,"根据《建筑安装工程费用项目组成》，以定额人工费为计费基础的规费有（ ）。",[429,431,433,435,436],{"key":20,"text":430,"correct":22},"养老保险费",{"key":24,"text":432,"correct":22},"医疗保险费",{"key":28,"text":434,"correct":22},"工伤保险费",{"key":31,"text":51,"correct":26},{"key":34,"text":45,"correct":22},{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":127,"analysis":37},894605,"施工图预算的编制依据包括（ ）。",[441,443,445,447,449],{"key":20,"text":442,"correct":22},"批准的设计概算",{"key":24,"text":444,"correct":22},"相应预算定额或地区单位估价表",{"key":28,"text":446,"correct":22},"批准的施工图纸",{"key":31,"text":448,"correct":22},"项目技术复杂程度",{"key":34,"text":450,"correct":26},"地方政府发布的区域发展规划",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":282,"analysis":37},894606,"施工图预算审查的重点包括（ ）。",[455,457,459,461,463],{"key":20,"text":456,"correct":26},"审查相关的技术规范是否有错误",{"key":24,"text":458,"correct":22},"审查工程量计算是否准确",{"key":28,"text":460,"correct":22},"审查施工图预算编制中定额套用是否恰当",{"key":31,"text":462,"correct":22},"审查各项收费标准是否符合现行规定",{"key":34,"text":464,"correct":26},"审查施工图设计方案是否合理",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":112,"analysis":37},894607,"审查施工图预算的方法有（ ）。",[469,471,473,475,477],{"key":20,"text":470,"correct":22},"标准预算审查法",{"key":24,"text":472,"correct":26},"预算指标审查法",{"key":28,"text":474,"correct":26},"预算单价审查法",{"key":31,"text":476,"correct":22},"对比审查法",{"key":34,"text":478,"correct":22},"分组计算审查法",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":243,"analysis":37},894608,"《2012 预算定额》适用于北京市行政区域内的工程范围有( )。",[483,485,487,489,491],{"key":20,"text":484,"correct":22},"工业与民用建筑工程",{"key":24,"text":486,"correct":22},"轨道交通工程的新建、扩建工程",{"key":28,"text":488,"correct":26},"道路及园林养护工程",{"key":31,"text":490,"correct":22},"复建仿古工程",{"key":34,"text":492,"correct":26},"房屋修缮工程",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":368,"analysis":37},894609,"《2012 预算定额》的分类包括( )。",[497,499,501,503,505],{"key":20,"text":498,"correct":22},"《2012土建工程预算定额》",{"key":24,"text":500,"correct":22},"《通用安装工程预算定额》",{"key":28,"text":502,"correct":22},"《构筑物工程预算定额》",{"key":31,"text":504,"correct":26},"《北京市建设工程和房屋修缮材料预算价格》",{"key":34,"text":506,"correct":26},"《北京市建设工程和房屋修缮机械台班费用定额》",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":282,"analysis":37},894610,"下列与施工机械工作相关的时间中，应包括在预算定额机械台班消耗量中，但不包括在施工定额中的有（ ）。",[511,513,515,517,519],{"key":20,"text":512,"correct":26},"低负荷下工作时间",{"key":24,"text":514,"correct":22},"机械施工不可避免的工序间歇",{"key":28,"text":516,"correct":22},"机械维修引起的停歇时间",{"key":31,"text":518,"correct":22},"开工时工作量不饱满所损失的时间",{"key":34,"text":520,"correct":26},"不可避免的中断时间",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":52,"analysis":37},894611,"关于投资估算指标反映的费用内容和计价单位，下列说法中正确的有（ ）。",[525,527,529,531,533],{"key":20,"text":526,"correct":26},"单位工程指标反映建筑安装工程费，以每m2、m3、m、座等单位投资表示",{"key":24,"text":528,"correct":22},"单项工程指标反映工程费用，以每m2、m3、m、座等单位投资表示",{"key":28,"text":530,"correct":26},"单项工程指标反映建筑安装工程费，以单项工程生产能力单位投资表示",{"key":31,"text":532,"correct":26},"建设项目综合指标反映项目固定资产投资，以项目综合生产能力单位投资表示",{"key":34,"text":534,"correct":22},"建设项目综合指标反映项目总投资，以项目综合生产能力单位投资表示",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":549,"analysis":37},894612,"与实物量法相比，采用定额单价法编制单位工程施工图预算的优点有（ ）。",[539,541,543,545,547],{"key":20,"text":540,"correct":26},"不需调整价差",{"key":24,"text":542,"correct":22},"计算简单、工作量较小和编制速度较快",{"key":28,"text":544,"correct":26},"能及时讲各种人工、材料、机械的当时当地市场单价计入预算价格",{"key":31,"text":546,"correct":22},"便于工程造价管理部门集中统一管理",{"key":34,"text":548,"correct":26},"反映当时当地的工程价格水平","BD",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":243,"analysis":37},894613,"确定预算定额人工工日消耗量过程中，应计入其他用工的有（ ）。",[554,556,558,560,562],{"key":20,"text":555,"correct":22},"材料二次搬运用工",{"key":24,"text":557,"correct":22},"电焊点火用工",{"key":28,"text":559,"correct":26},"按劳动定额规定应增（减）计算的用工",{"key":31,"text":561,"correct":22},"临时水电线路移动造成的停工",{"key":34,"text":563,"correct":26},"完成某一分项工程所需消耗的技术工种用工",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":228,"analysis":37},894614,"关于预算定额编制的说法，正确的有（ ）。",[568,570,572,574,576],{"key":20,"text":569,"correct":26},"预算定额的计量单位一般按工序或施工过程确定",{"key":24,"text":571,"correct":22},"在综合施工定额的过程中要增加两种定额间的水平差",{"key":28,"text":573,"correct":26},"人工工日消耗量等于基本用工、辅助用工和人工幅度差之和",{"key":31,"text":575,"correct":22},"材料消耗量包括净用量和以净用量为基数计算的损耗量",{"key":34,"text":577,"correct":22},"以小组产量计算机械台班产量的，不再计算机械幅度差",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":592,"analysis":37},894615,"下列用工项目中，构成预算定额人工工日消耗量，但并不包括在施工定额中的有（ ）。",[582,584,586,588,590],{"key":20,"text":583,"correct":26},"材料水平搬运用工",{"key":24,"text":585,"correct":26},"材料加工用工和电焊点火用工",{"key":28,"text":587,"correct":22},"工序交接时对前一工序修整用工",{"key":31,"text":589,"correct":22},"在施工定额基础上应增加计算的用工",{"key":34,"text":591,"correct":26},"完成施工任务必需消耗的技术工种用工","CD",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":368,"analysis":37},894617,"关于当事人对建设工程实际竣工日期有争议时竣工日期确定的说法，正确的有（）。",[597,599,601,603,605],{"key":20,"text":598,"correct":22},"建设工程经竣工验收合格的，以竣工验收合格之日为竣工日期",{"key":24,"text":600,"correct":22},"承包人已经提交竣工验收报告，发包人拖延验收的，以承包人提交验收报告之日为竣工日期",{"key":28,"text":602,"correct":22},"建设工程未经竣工验收，发包人擅自使用的，以转移占有建设工程之日为竣工日期",{"key":31,"text":604,"correct":26},"建设工程整改后竣工验收合格的，以提交竣工验收申请报告的日期为竣工日期",{"key":34,"text":606,"correct":26},"建设工程未经竣工验收，发包人擅自使用的，以工程完工日期为竣工日期",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":67,"analysis":37},894619,"为有利于措施费的确定和调整,根据现行工程量计算规范。适宜釆用单价措施项目计价的有（）。",[611,613,615,617,619],{"key":20,"text":612,"correct":26},"夜间施工增加费",{"key":24,"text":614,"correct":26},"二次搬运费",{"key":28,"text":616,"correct":22},"施工排水、降水费",{"key":31,"text":618,"correct":22},"超高施工增加费",{"key":34,"text":330,"correct":22},{"id":621,"libraryId":5,"type":15,"typeLabel":16,"stem":622,"options":623,"answer":213,"analysis":37},894620,"关于分部分项工程量清单的编制，下列说法中正确的有（）。",[624,626,628,630,632],{"key":20,"text":625,"correct":22},"以清单计算规范附录中的名称为基础，结合具体工作内容补充细化项目名称",{"key":24,"text":627,"correct":26},"清单项目的工作内容在招标工程量清单的项目特征中加以描述",{"key":28,"text":629,"correct":22},"有两个或以上计量单位时，选择最适宜表现项目特征并方便计量的单位",{"key":31,"text":631,"correct":22},"除另有说明外，清单项目的工程量应以实体工程量为准，各种施工中的损耗和需要增加的工程量应在单价中考虑",{"key":34,"text":633,"correct":26},"在工程量清单中应附补充项目名称、项目特征、计量单位和工程量",{"id":635,"libraryId":5,"type":15,"typeLabel":16,"stem":636,"options":637,"answer":156,"analysis":37},894621,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），下列脚手架中以m2为计算单位的有（）。",[638,640,642,644,646],{"key":20,"text":639,"correct":22},"整体提升架",{"key":24,"text":641,"correct":22},"外装饰吊篮",{"key":28,"text":643,"correct":26},"挑脚手架",{"key":31,"text":645,"correct":22},"悬空脚手架",{"key":34,"text":647,"correct":22},"满堂脚手架",{"id":649,"libraryId":5,"type":15,"typeLabel":16,"stem":650,"options":651,"answer":549,"analysis":37},894623,"关于措施项目工程量清单编制与计价，下列说法中正确的是（ ）。",[652,654,656,658,660],{"key":20,"text":653,"correct":26},"不能计算工程量的措施项目也可以采用分部分项工程量清单方式编制",{"key":24,"text":655,"correct":22},"安全文明施工费按总价方式编制，其计算基础可为“定额基价”、“定额人工费”",{"key":28,"text":657,"correct":26},"总价措施项目清单表应列明计量单位、费率、金额等内容",{"key":31,"text":659,"correct":22},"除安全文明施工费外的其他总价措施项目的计算基础可为“定额人工费”",{"key":34,"text":661,"correct":26},"按施工方案计算的总价措施项目可以只填“金额”数值",{"id":663,"libraryId":5,"type":15,"typeLabel":16,"stem":664,"options":665,"answer":67,"analysis":37},894624,"有抗化学侵蚀要求的混凝土多使用（）。",[666,668,670,672,674],{"key":20,"text":667,"correct":26},"硅酸盐水泥",{"key":24,"text":669,"correct":26},"普通硅酸盐水泥",{"key":28,"text":671,"correct":22},"矿渣硅酸盐水泥",{"key":31,"text":673,"correct":22},"火山灰质硅酸盐水泥",{"key":34,"text":675,"correct":22},"粉煤灰硅酸盐水泥",{"id":677,"libraryId":5,"type":15,"typeLabel":16,"stem":678,"options":679,"answer":690,"analysis":37},894625,"引气剂主要改善混凝土的（）。",[680,682,684,686,688],{"key":20,"text":681,"correct":26},"凝结时间",{"key":24,"text":683,"correct":22},"拌和物流变性能",{"key":28,"text":685,"correct":22},"耐久性",{"key":31,"text":687,"correct":26},"早期强度",{"key":34,"text":689,"correct":26},"后期强度","BC",{"id":692,"libraryId":5,"type":15,"typeLabel":16,"stem":693,"options":694,"answer":213,"analysis":37},894626,"混凝土拌合物的和易性包括（）。",[695,697,698,700,702],{"key":20,"text":696,"correct":22},"保水性",{"key":24,"text":685,"correct":26},{"key":28,"text":699,"correct":22},"黏聚性",{"key":31,"text":701,"correct":22},"流动性",{"key":34,"text":703,"correct":26},"抗冻性",{"id":705,"libraryId":5,"type":15,"typeLabel":16,"stem":706,"options":707,"answer":67,"analysis":37},894627,"混凝土的耐久性主要体现在（）。",[708,710,712,714,716],{"key":20,"text":709,"correct":26},"抗压强度",{"key":24,"text":711,"correct":26},"抗折强度",{"key":28,"text":713,"correct":22},"抗冻等级",{"key":31,"text":715,"correct":22},"抗渗等级",{"key":34,"text":717,"correct":22},"混凝土碳化",{"id":719,"libraryId":5,"type":15,"typeLabel":16,"stem":720,"options":721,"answer":82,"analysis":37},894628,"下列玻璃中，属于安全玻璃的有（）。",[722,724,726,728,730],{"key":20,"text":723,"correct":22},"钢化玻璃",{"key":24,"text":725,"correct":26},"净片玻璃",{"key":28,"text":727,"correct":22},"防火玻璃",{"key":31,"text":729,"correct":26},"刻花玻璃",{"key":34,"text":731,"correct":22},"夹层玻璃",[733,737,740,743,746,749],{"id":734,"name":735,"category":7,"favorite":736},1,"领导干部任职前廉政法规知识测试题",92,{"id":738,"name":739,"category":7,"favorite":734},595,"建筑结构与设备",{"id":741,"name":742,"category":7,"favorite":734},715,"招标采购专业知识与法律法规",{"id":744,"name":745,"category":7,"favorite":734},848,"市政方向-通用基础",{"id":747,"name":748,"category":7,"favorite":8},534,"BIM工程师",{"id":750,"name":748,"category":7,"favorite":8},535]