[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-580-30":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":726},{"id":5,"name":6,"category":7,"favorite":8},580,"[土木建筑工程]建设工程计量与计价实务","建筑工程",0,30,50,1733,[13,38,53,68,83,95,110,120,134,149,164,179,193,207,221,236,251,265,278,292,306,320,335,350,365,379,392,406,420,435,449,463,477,491,505,519,533,547,561,573,587,602,616,630,644,658,672,686,698,712],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},894474,2,"多选题","尺寸标注的尺寸四要素包括（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","尺寸界线",true,{"key":24,"text":25,"correct":22},"B","尺寸线",{"key":27,"text":28,"correct":29},"C","尺寸文字",false,{"key":31,"text":32,"correct":22},"D","尺寸起止符号",{"key":34,"text":35,"correct":22},"E","尺寸数字","ABDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},894475,"建筑施工图按内容和作用不同可分为（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"建筑施工图",{"key":24,"text":45,"correct":29},"建筑平面图",{"key":27,"text":47,"correct":22},"结构施工图",{"key":31,"text":49,"correct":29},"建筑立面图",{"key":34,"text":51,"correct":22},"设备施工图","ACE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},894476,"楼梯详图一般包括（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"楼梯平面图",{"key":24,"text":60,"correct":29},"楼梯立面图",{"key":27,"text":62,"correct":22},"楼梯剖面图",{"key":31,"text":64,"correct":22},"踏步栏杆节点详图",{"key":34,"text":66,"correct":29},"楼梯首页","ACD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},894477,"结构施工图的组成有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"结构设计说明",{"key":24,"text":75,"correct":22},"结构平面图",{"key":27,"text":77,"correct":29},"基础平面图",{"key":31,"text":79,"correct":22},"结构构件详图",{"key":34,"text":81,"correct":29},"楼层平面图","ABD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":94,"analysis":37},894478,"建筑施工图是用以指导施工的一套图纸，按内容和作用不同可分为（ ）。",[87,88,89,90,92],{"key":20,"text":43,"correct":22},{"key":24,"text":47,"correct":22},{"key":27,"text":51,"correct":22},{"key":31,"text":91,"correct":29},"现场平面图设计",{"key":34,"text":93,"correct":29},"规划设计图","ABC",{"id":96,"libraryId":5,"type":15,"typeLabel":16,"stem":97,"options":98,"answer":109,"analysis":37},894479,"梁平法施工图注写方式有（ ）注写方式。",[99,101,103,105,107],{"key":20,"text":100,"correct":22},"平面",{"key":24,"text":102,"correct":29},"立面",{"key":27,"text":104,"correct":29},"剖面",{"key":31,"text":106,"correct":22},"截面",{"key":34,"text":108,"correct":29},"列表","AD",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":119,"analysis":37},894480,"柱平法施工图注写方式有（ ）注写方式。",[114,115,116,117,118],{"key":20,"text":100,"correct":29},{"key":24,"text":102,"correct":29},{"key":27,"text":104,"correct":29},{"key":31,"text":106,"correct":22},{"key":34,"text":108,"correct":22},"DE",{"id":121,"libraryId":5,"type":15,"typeLabel":16,"stem":122,"options":123,"answer":133,"analysis":37},894481,"下列不属于建筑施工图主要图纸的有（ ）",[124,126,128,129,131],{"key":20,"text":125,"correct":29},"总平面图",{"key":24,"text":127,"correct":29},"平面图",{"key":27,"text":58,"correct":22},{"key":31,"text":130,"correct":22},"系统图",{"key":34,"text":132,"correct":29},"剖面图","CD",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":148,"analysis":37},894483,"下列关于总平面图基本内容的说法，正确的是（ ）。",[138,140,142,144,146],{"key":20,"text":139,"correct":29},"总平面图常采用大比例绘制",{"key":24,"text":141,"correct":22},"表明新建区的总体布局",{"key":27,"text":143,"correct":22},"标注指北针或风玫瑰图，用以说明建筑物的朝向和该地区常年的风向频率",{"key":31,"text":145,"correct":22},"表明新建房屋底层室内地面和室外整平地面的绝对标高",{"key":34,"text":147,"correct":22},"表明新建房屋的位置、平面轮廓形状和层数","BCDE",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":163,"analysis":37},894484,"建筑平面图的基本内容包括（ ）。",[153,155,157,159,161],{"key":20,"text":154,"correct":22},"构配件及固定设施的定位",{"key":24,"text":156,"correct":22},"尺寸标注",{"key":27,"text":158,"correct":22},"纵横定位轴线及其编号",{"key":31,"text":160,"correct":29},"立面左右两端的轴线标注",{"key":34,"text":162,"correct":22},"剖面图的剖切位置、剖视方向、编号","ABCE",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":178,"analysis":37},894485,"编排施工图纸应遵循的顺序是（ ）。",[168,170,172,174,176],{"key":20,"text":169,"correct":22},"全局性图纸在前，局部详图在后",{"key":24,"text":171,"correct":22},"先施工的在前，后施工的在后",{"key":27,"text":173,"correct":22},"布置图在前，构件图在后",{"key":31,"text":175,"correct":22},"重要图纸在前，次要图纸在后",{"key":34,"text":177,"correct":29},"布置图在后，构件图在前","ABCD",{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":133,"analysis":37},894486,"实施平法的优点主要表现在（ ）。",[183,185,187,189,191],{"key":20,"text":184,"correct":29},"建筑平面布置灵活",{"key":24,"text":186,"correct":29},"建筑立面处理方便",{"key":27,"text":188,"correct":22},"减少图纸数量",{"key":31,"text":190,"correct":22},"实现平面表示，整体标注",{"key":34,"text":192,"correct":29},"适用于大空间的公共建筑",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":148,"analysis":37},894487,"梁的平面注写包括集中标注与原位标注，集中标注的内容包括（ ）。",[197,199,201,203,205],{"key":20,"text":198,"correct":29},"梁支座上部纵筋",{"key":24,"text":200,"correct":22},"梁上下通长筋和架立筋",{"key":27,"text":202,"correct":22},"梁侧面纵筋",{"key":31,"text":204,"correct":22},"梁编号、梁截面尺寸",{"key":34,"text":206,"correct":22},"箍筋的钢筋级别、直径、加密区及非加密区肢数",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":119,"analysis":37},894488,"关于建筑面积计算，说法正确的有（ ）。",[211,213,215,217,219],{"key":20,"text":212,"correct":29},"露天游泳池按设计图示外围水平投影面积的1／2计算",{"key":24,"text":214,"correct":29},"建筑物内的储水罐平台按平台投影面积计算",{"key":27,"text":216,"correct":29},"有永久顶盖的室外楼梯，按楼梯水平投影面积计算",{"key":31,"text":218,"correct":22},"建筑物主体结构内的阳台按其结构外围水平面积计算",{"key":34,"text":220,"correct":22},"宽度超过2．10m的雨篷按结构板的水平投影面积1／2计算",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":235,"analysis":37},894489,"根据《建筑工程建筑面积计算规范》GB／T 50353—2013的规定，下列不计算建筑面积的内容有（ ）。",[225,227,229,231,233],{"key":20,"text":226,"correct":29},"附属在建筑物外墙的落地橱窗",{"key":24,"text":228,"correct":29},"与室内相通的变形缝",{"key":27,"text":230,"correct":22},"坡屋顶内空间净高小于1．2m的部分",{"key":31,"text":232,"correct":22},"建筑物内的上料平台",{"key":34,"text":234,"correct":22},"挑出外墙外边线宽度2．0m的无柱雨篷","CDE",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":250,"analysis":37},894490,"根据《建筑工程建筑面积计算规范》GB／T50353—2013，下列不应计算建筑面积的项目有（ ）。",[240,242,244,246,248],{"key":20,"text":241,"correct":22},"无围护结构的观光电梯",{"key":24,"text":243,"correct":22},"建筑物内的操作平台",{"key":27,"text":245,"correct":29},"建筑物外墙的保温隔热层",{"key":31,"text":247,"correct":29},"有围护结构的屋顶水箱间",{"key":34,"text":249,"correct":29},"建筑物内的变形缝","AB",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":235,"analysis":37},894491,"根据《房屋建筑与装饰工程工程量清单计算规范》（GB50854-2013）规定，关于建筑面积计算正确的是（）。",[255,257,259,261,263],{"key":20,"text":256,"correct":29},"过街楼底层的建筑物通道按通道底板水平面积计算",{"key":24,"text":258,"correct":29},"建筑物露台按围护结构外围水平面积计算",{"key":27,"text":260,"correct":22},"挑出宽度1.8米的无柱雨蓬不计算",{"key":31,"text":262,"correct":22},"建筑物室外台阶不计算",{"key":34,"text":264,"correct":22},"挑出宽度超过1.00米的空调室外机搁板不计算",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":94,"analysis":37},894492,"根据《建筑工程施面积计算规范》GB50500—2013，不计算建筑面积的是（ ）。",[269,271,273,275,277],{"key":20,"text":270,"correct":22},"建筑物室外台阶",{"key":24,"text":272,"correct":22},"空调室外机搁板",{"key":27,"text":274,"correct":22},"屋顶可上人露台",{"key":31,"text":276,"correct":29},"与建筑物不相连的有顶盖车棚",{"key":34,"text":249,"correct":29},{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":235,"analysis":37},894493,"下列关于建筑面积的计算，符合规范的有（ ）。",[282,284,286,288,290],{"key":20,"text":283,"correct":29},"建筑物顶部有围护结构的楼梯间，层高不足2．20m的不计算",{"key":24,"text":285,"correct":29},"建筑物间无围护结构，有围护设施的架空走廊，层高超过2．20m的计算全面积",{"key":27,"text":287,"correct":22},"建筑物大厅内层高不足2．20m的走廊按其结构底扳的水平面积的1／2计算",{"key":31,"text":289,"correct":22},"室外楼梯并入所依附建筑物自然层，并按其水平投影面积的1／2计算",{"key":34,"text":291,"correct":22},"建筑物内的变形缝按其自然层合并在建筑面积内计算",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":133,"analysis":37},894494,"根据《建筑工程建筑面积计算规则》（GB\u002FT50353），下列关于计算建筑面积计算，正确的说法有（ ）。",[296,298,300,302,304],{"key":20,"text":297,"correct":29},"建筑物内的变形缝不计算建筑面积",{"key":24,"text":299,"correct":29},"建筑物室外台阶按水平投影面积计算",{"key":27,"text":301,"correct":22},"有围护设施的室外走廊按底板结构外围水平面积的1\u002F2计算",{"key":31,"text":303,"correct":22},"结构高差0.5m，结构净高2.1m的凸（飘）窗不计算面积",{"key":34,"text":305,"correct":29},"无永久性顶盖的架空走廊不计算面积",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":109,"analysis":37},894495,"根据《建筑工程建筑面积计算规则》（GB\u002FT50353），下列说法正确的有（ ）。",[310,312,314,316,318],{"key":20,"text":311,"correct":22},"建筑物之间的地下人防通道不计算建筑面积",{"key":24,"text":313,"correct":29},"悬挑雨篷应按顶板外围水平投影面积的1\u002F2计算建筑面积",{"key":27,"text":315,"correct":29},"悬挑宽度为1.6m的檐廊按顶板水平投影面积计算建筑面积",{"key":31,"text":317,"correct":22},"主体结构外的阳台按底板外围水平投影面积的1\u002F2计算建筑面积",{"key":34,"text":319,"correct":29},"主体结构内的阳台按围护结构外围水平投影面积的1\u002F2计算建筑面积",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":334,"analysis":37},894496,"根据《建筑工程建筑面积计算规则》（GB\u002FT50353），下列项目中按一半计算建筑面积的有（ ）。",[324,326,328,330,332],{"key":20,"text":325,"correct":22},"外挑宽度在1.5m以上的有盖有围护设施走廊",{"key":24,"text":327,"correct":29},"外挑宽度在1.5m以上的有盖无围护设施走廊",{"key":27,"text":329,"correct":22},"有顶盖的单排柱车棚站台",{"key":31,"text":331,"correct":29},"不封闭的主体结构内阳台",{"key":34,"text":333,"correct":29},"有围护结构的门斗","AC",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":349,"analysis":37},894497,"根据《建筑工程建筑面积计算规则》（GB\u002FT50353），下列内容中，不应计算建筑面积的有（ ）。",[339,341,343,345,347],{"key":20,"text":340,"correct":29},"出挑宽度为1.8m的雨棚",{"key":24,"text":342,"correct":22},"与建筑物不连通的装饰性阳台",{"key":27,"text":344,"correct":22},"消防专用室外钢楼梯",{"key":31,"text":346,"correct":22},"层高不足1.2m的单层建筑坡屋顶空间",{"key":34,"text":348,"correct":29},"层高不足2.2m的地下室","BCD",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":364,"analysis":37},894498,"根据《建筑工程建筑面积计算规范》（GB\u002FT50353-2013）规定，关于建筑面积计算正确的为（）。",[354,356,358,360,362],{"key":20,"text":355,"correct":29},"建筑物顶部有围护结构的电梯机房不单独计算",{"key":24,"text":357,"correct":29},"建筑物顶部层高为2.10m的有围护结构的水箱间不计算",{"key":27,"text":359,"correct":22},"围护结构不垂直于水平面的楼层，应按其底板面外墙外围水平面积计算",{"key":31,"text":361,"correct":29},"建筑物室内提物井不计算",{"key":34,"text":363,"correct":22},"建筑物室内楼梯按自然层计算","CE",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":67,"analysis":37},894499,"根据《建筑工程建筑面积计算规范》（GB50353-2013），应计算 1\u002F2建筑面积的有（）。",[369,371,373,375,377],{"key":20,"text":370,"correct":22},"高度不足2.20m的单层建筑物",{"key":24,"text":372,"correct":29},"净高不足1.20m的坡屋顶部分",{"key":27,"text":374,"correct":22},"层高不足2.20m地下室",{"key":31,"text":376,"correct":22},"有永久顶盖无围护结构建筑物",{"key":34,"text":378,"correct":29},"外挑宽度不足2.10m的雨蓬",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":334,"analysis":37},894500,"根据《建筑工程建筑面积计算规范》（GB\u002FT50353-2013），不计算建筑面积的有（）。",[383,385,387,389,390],{"key":20,"text":384,"correct":22},"建筑物首层地面有围护设施的露台",{"key":24,"text":386,"correct":29},"兼顾消防与建筑物相通的室外钢楼梯",{"key":27,"text":388,"correct":22},"与建筑物相连的室外台阶",{"key":31,"text":228,"correct":29},{"key":34,"text":391,"correct":29},"形成建筑空间，结构净高1.50m的坡屋顶",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":405,"analysis":37},894501,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），不计算建筑面积的有（）。",[396,398,400,401,403],{"key":20,"text":397,"correct":29},"结构层高为2.10m的门斗",{"key":24,"text":399,"correct":22},"建筑物内的大型上料平台",{"key":27,"text":241,"correct":22},{"key":31,"text":402,"correct":29},"有围护结构的舞台灯光控制室",{"key":34,"text":404,"correct":22},"过街楼底层的开放公共空间","BCE",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":36,"analysis":37},894502,"关于建筑面积的概念及作用的说法，正确的是（ ）。",[410,412,414,416,418],{"key":20,"text":411,"correct":22},"建筑物各层平面布置中，可直接为生产或生活使用的净面积总和是使用面积",{"key":24,"text":413,"correct":22},"建筑物各层平面布置中为辅助生产或生活所占净面积的总和是辅助面积",{"key":27,"text":415,"correct":29},"对于国家投资的项目，施工图的建筑面积如超过初步设计的3%，必须重新报批",{"key":31,"text":417,"correct":22},"建筑面积是选择概算指标和编制概算的基础数据",{"key":34,"text":419,"correct":22},"建筑面积是确定各项技术经济指标的基础",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":434,"analysis":37},894503,"以下有关建筑面积的指标计算，正确的有（ ）。",[424,426,428,430,432],{"key":20,"text":425,"correct":29},"建筑容积率＝底层建设面积÷建筑占地面积×100%",{"key":24,"text":427,"correct":22},"建筑容积率＝建筑总面积÷建筑占地面积×100%",{"key":27,"text":429,"correct":29},"建筑密度＝建设总面积÷建筑占地面积×100%",{"key":31,"text":431,"correct":22},"建筑密度＝建筑底层面积÷建筑占地面积×100%",{"key":34,"text":433,"correct":29},"建筑容积率＝建筑占地面积÷建筑总面积×100%","BD",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":52,"analysis":37},894504,"计算墙体抹灰工程量时应扣除（ ）。",[439,441,443,445,447],{"key":20,"text":440,"correct":22},"墙裙",{"key":24,"text":442,"correct":29},"踢脚线",{"key":27,"text":444,"correct":22},"门洞口",{"key":31,"text":446,"correct":29},"块料踢脚",{"key":34,"text":448,"correct":22},"窗洞口",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":349,"analysis":37},894505,"工程量计量单位中属于物理计量单位的是（ ）。",[453,455,457,459,461],{"key":20,"text":454,"correct":29},"樘",{"key":24,"text":456,"correct":22},"面积",{"key":27,"text":458,"correct":22},"体积",{"key":31,"text":460,"correct":22},"重量",{"key":34,"text":462,"correct":29},"座",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":67,"analysis":37},894506,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013，砖基础工程量计算正确的有（ ）。",[467,469,471,473,475],{"key":20,"text":468,"correct":22},"按设计图示尺寸以体积计算",{"key":24,"text":470,"correct":29},"扣除大放脚T形接头处的重叠部分",{"key":27,"text":472,"correct":22},"内墙基础长度按净长线计算",{"key":31,"text":474,"correct":22},"材料相同时，基础与墙身划分通常以设计室内地坪为界",{"key":34,"text":476,"correct":29},"基础工程量不扣除构造柱所占体积",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":364,"analysis":37},894507,"屋面防水工程量计算中，正确的工程量清单计算规则有（ ）。",[481,483,485,487,489],{"key":20,"text":482,"correct":29},"瓦屋面、型材屋面按设计图示尺寸以水平投影面积计算",{"key":24,"text":484,"correct":29},"膜结构屋面按设计尺寸以覆盖面积计算",{"key":27,"text":486,"correct":22},"斜屋面卷材防水按设计图示尺寸以斜面积计算",{"key":31,"text":488,"correct":29},"屋面排水管按设计图示尺寸以理论重量计算",{"key":34,"text":490,"correct":22},"屋面天沟按设计尺寸以面积计算",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":334,"analysis":37},894508,"关于外墙砖砌体高度计算的说法中，不正确的有（ ）。",[495,497,499,501,503],{"key":20,"text":496,"correct":22},"位于屋架下弦，其高度算至屋架底",{"key":24,"text":498,"correct":29},"坡屋面无檐口天棚者算至屋面板底",{"key":27,"text":500,"correct":22},"有屋架无天棚者算至屋架下弦底",{"key":31,"text":502,"correct":29},"平屋面算至钢筋混凝土板底",{"key":34,"text":504,"correct":29},"出檐宽度超过600mm时，按实砌高度计算",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":235,"analysis":37},894509,"内墙面抹灰工程量按主墙间的净长乘以高度计算，不应扣除（ ）。",[509,511,513,515,517],{"key":20,"text":510,"correct":29},"门窗洞口面积",{"key":24,"text":512,"correct":29},"0．3m2以上孔洞所占面积",{"key":27,"text":514,"correct":22},"踢脚线所占面积",{"key":31,"text":516,"correct":22},"墙与构件交接处的面积",{"key":34,"text":518,"correct":22},"挂镜线所占面积",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":133,"analysis":37},894510,"某工程石方清单为暂估项目，施工过程中需要通过现场签证确认实际完成工作量，挖方全部外运。已知开挖范围为底长15m，底宽9m，使用斗容量为10m3的汽车平装外运45车，则关于石方清单列项和工程量，说法正确的有（ ）。",[523,525,527,529,531],{"key":20,"text":524,"correct":29},"按挖一般石方列项",{"key":24,"text":526,"correct":29},"按挖沟槽石方列项",{"key":27,"text":528,"correct":22},"按挖基坑石方列项",{"key":31,"text":530,"correct":22},"工程量292．21m3",{"key":34,"text":532,"correct":29},"工程量450．00m3",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":405,"analysis":37},894511,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013，关于土方工程量计算与项目列项，说法正确的有（ ）。",[537,539,541,543,545],{"key":20,"text":538,"correct":29},"建筑物场地挖、填厚度≤±300mm的挖土应按一般土方项目编码列项计算",{"key":24,"text":540,"correct":22},"平整场地工程量按设计图示尺寸以建筑物首层建筑面积计算",{"key":27,"text":542,"correct":22},"挖一般土方应按设计图示尺寸以挖掘前天然密实体积计算",{"key":31,"text":544,"correct":29},"挖沟槽土方工程量按沟槽设计图示中心线长度计算",{"key":34,"text":546,"correct":22},"挖基坑土方工程量按设计图示尺寸以体积计算",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":148,"analysis":37},894512,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013，装饰装修工程的工程量计算正确的有（ ）。",[551,553,555,557,559],{"key":20,"text":552,"correct":29},"金属踢脚线按设计图示尺寸以长度计算",{"key":24,"text":554,"correct":22},"金属扶手带栏杆按设计图示尺寸以扶手中心线长度计算",{"key":27,"text":556,"correct":22},"石材台阶面按设计图示尺寸以台阶水平投影面积计算",{"key":31,"text":558,"correct":22},"楼梯、台阶侧面装饰按设计图示尺寸以面积计算",{"key":34,"text":560,"correct":22},"柱面装饰抹灰按设计图示柱断面周长乘以高度以面积计算",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":334,"analysis":37},894513,"根据《房屋建筑与装修工程工程量计算规范》，关于内墙砖砌体高度计算的说法正确的有（ ）。",[565,567,568,570,571],{"key":20,"text":566,"correct":22},"位于屋架下弦者，其高度算至屋架下弦底",{"key":24,"text":498,"correct":29},{"key":27,"text":569,"correct":22},"无屋架者算至天棚底另加100mm",{"key":31,"text":502,"correct":29},{"key":34,"text":572,"correct":29},"有框架梁算至梁顶",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":250,"analysis":37},894514,"关于现浇混凝土墙工程量计算，说法正确的有（）。",[577,579,581,583,585],{"key":20,"text":578,"correct":22},"一般的短肢剪力墙，按设计图示尺寸以体积计算",{"key":24,"text":580,"correct":22},"直形墙、挡土墙按设计图示尺寸以体积计算",{"key":27,"text":582,"correct":29},"弧形墙按墙厚不同以展开面积计算",{"key":31,"text":584,"correct":29},"墙体工程量应扣除预埋铁件所占体积",{"key":34,"text":586,"correct":29},"墙垛及突出墙面部分的体积不计算",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":601,"analysis":37},894515,"根据《房屋建筑与装饰工程工程量清单计算规范》（GB50854-2013）规定，关于现浇砼构件工程量计算正确的是（）。",[591,593,595,597,599],{"key":20,"text":592,"correct":29},"电缆沟、地沟按设计图示尺寸以面积计算",{"key":24,"text":594,"correct":22},"台阶按设计图示尺寸以水平投影面积或体积计算",{"key":27,"text":596,"correct":29},"压顶按设计图示尺寸以水平投影面积计算",{"key":31,"text":598,"correct":22},"扶手按设计图示尺寸以体积计算",{"key":34,"text":600,"correct":22},"检查井按设计图示尺寸以体积计算","BDE",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":178,"analysis":37},894516,"根据《房屋建筑与装饰工程工程量清单计算规范》（GB50854-2013）规定，关于钢筋保护或工程量计算正确的是（）。",[606,608,610,612,614],{"key":20,"text":607,"correct":22},"直径为20㎜的钢筋，一个半圆弯钩的增加长度为125㎜",{"key":24,"text":609,"correct":22},"直径为16㎜的钢筋，一个90度弯钩的增加长度为56㎜",{"key":27,"text":611,"correct":22},"直径为20㎜的钢筋弯起45度，弯起高度为450㎜，一侧弯起增加的长度为186.3㎜",{"key":31,"text":613,"correct":22},"通常情况下砼板的保护层厚度不小于15㎜",{"key":34,"text":615,"correct":29},"箍筋根数=构件长度÷箍筋间距+1",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":364,"analysis":37},894517,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），现浇混凝土构件工程量计算正确的有（）。",[620,622,624,626,628],{"key":20,"text":621,"correct":29},"构造柱按柱断面尺寸乘以全高以体积计算，嵌入墙体部分不计",{"key":24,"text":623,"correct":29},"框架柱工程量按柱基上表面至柱顶以高度计算",{"key":27,"text":625,"correct":22},"梁按设计图示尺寸以体积计算，主梁与次梁交接处按主梁体积计算",{"key":31,"text":627,"correct":29},"混凝土弧形墙按垂直投影面积乘以墙厚以体积计算",{"key":34,"text":629,"correct":22},"挑檐板按设计图示尺寸以体积计算",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":601,"analysis":37},894518,"根据《房屋建筑与装饰工程工程量计算规范》GB 50854—2013，下列项目可以按设计图示数量或设计图示洞口尺寸以面积计算的有（ ）。",[634,636,638,640,642],{"key":20,"text":635,"correct":29},"木材面油漆",{"key":24,"text":637,"correct":22},"金属窗、金属门",{"key":27,"text":639,"correct":29},"特殊五金",{"key":31,"text":641,"correct":22},"木门、木窗",{"key":34,"text":643,"correct":22},"门油漆、窗油漆",{"id":645,"libraryId":5,"type":15,"typeLabel":16,"stem":646,"options":647,"answer":36,"analysis":37},894519,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013，下列脚手架中以m2为计算单位的有（ ）。",[648,650,652,654,656],{"key":20,"text":649,"correct":22},"整体提升架",{"key":24,"text":651,"correct":22},"外装饰吊篮",{"key":27,"text":653,"correct":29},"挑脚手架",{"key":31,"text":655,"correct":22},"悬空脚手架",{"key":34,"text":657,"correct":22},"满堂脚手架",{"id":659,"libraryId":5,"type":15,"typeLabel":16,"stem":660,"options":661,"answer":133,"analysis":37},894520,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013，下列关于装饰装修工程量计算，正确的是（ ）。",[662,664,666,668,670],{"key":20,"text":663,"correct":29},"天棚抹灰应扣除端垛、柱所占面积",{"key":24,"text":665,"correct":29},"天棚灯带按设计图示以长度计算",{"key":27,"text":667,"correct":22},"标准金属门按设计图示数量计算",{"key":31,"text":669,"correct":22},"金属平开窗按设计图示洞口尺寸以面积计算",{"key":34,"text":671,"correct":29},"铝合金窗帘盒按设计图示尺寸以面积计算",{"id":673,"libraryId":5,"type":15,"typeLabel":16,"stem":674,"options":675,"answer":133,"analysis":37},894521,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013，关于管沟土方工程量计算的说法，正确的有（ ）。",[676,678,680,682,684],{"key":20,"text":677,"correct":29},"按管径宽度乘以深度再乘以管道中心线长度计算",{"key":24,"text":679,"correct":29},"扣除各类井的长度，井的土方不计算",{"key":27,"text":681,"correct":22},"有垫层按设计管底垫层面积乘以深度计算",{"key":31,"text":683,"correct":22},"无垫层按管道外径水平投影面积乘以深度计算",{"key":34,"text":685,"correct":29},"按管沟开挖断面乘以管道中心线长度计算",{"id":687,"libraryId":5,"type":15,"typeLabel":16,"stem":688,"options":689,"answer":119,"analysis":37},894522,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013，计算措施项目工程量时，可以以面积计算的有（ ）。",[690,692,694,695,697],{"key":20,"text":691,"correct":29},"大型机械安拆",{"key":24,"text":693,"correct":29},"施工排水、降水",{"key":27,"text":653,"correct":29},{"key":31,"text":696,"correct":22},"超高施工增加",{"key":34,"text":657,"correct":22},{"id":699,"libraryId":5,"type":15,"typeLabel":16,"stem":700,"options":701,"answer":109,"analysis":37},894523,"下列关于楼梯装饰工程量计算规则中，说法正确的有（ ）。",[702,704,706,708,710],{"key":20,"text":703,"correct":22},"按设计图示尺寸以楼梯水平投影面积计算",{"key":24,"text":705,"correct":29},"踏步、休息平台应单独另行计算",{"key":27,"text":707,"correct":29},"踏步应单独另行计算，休息平台不应单独另行计算",{"key":31,"text":709,"correct":22},"踏步、休息平台不单独另行计算",{"key":34,"text":711,"correct":29},"休息平台应单独另行计算，而踏步不应单独计算",{"id":713,"libraryId":5,"type":15,"typeLabel":16,"stem":714,"options":715,"answer":178,"analysis":37},894524,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013规定，关于钢筋保护或工程量计算正确的是（ ）。",[716,718,720,722,724],{"key":20,"text":717,"correct":22},"φ20mm钢筋一个半圆弯钩的增加长度为125mm",{"key":24,"text":719,"correct":22},"φ16mm钢筋一个90°弯钩的增加长度为56mm",{"key":27,"text":721,"correct":22},"φ20mm钢筋弯起45°，弯起高度为450mm，一侧弯起增加的长度为186．3mm",{"key":31,"text":723,"correct":22},"通常情况下混凝土板的钢筋保护层厚度不小于15mm",{"key":34,"text":725,"correct":29},"箍筋根数=构件长度／箍筋间距+1",[727,731,734,737,740,743],{"id":728,"name":729,"category":7,"favorite":730},1,"领导干部任职前廉政法规知识测试题",92,{"id":732,"name":733,"category":7,"favorite":728},595,"建筑结构与设备",{"id":735,"name":736,"category":7,"favorite":728},715,"招标采购专业知识与法律法规",{"id":738,"name":739,"category":7,"favorite":728},848,"市政方向-通用基础",{"id":741,"name":742,"category":7,"favorite":8},534,"BIM工程师",{"id":744,"name":742,"category":7,"favorite":8},535]