[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-580-29":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":736},{"id":5,"name":6,"category":7,"favorite":8},580,"[土木建筑工程]建设工程计量与计价实务","建筑工程",0,29,50,1733,[13,38,53,68,82,97,112,127,142,157,172,187,202,216,231,245,260,274,288,300,314,329,343,357,371,385,399,413,428,442,456,471,485,497,511,525,540,554,568,582,596,611,625,639,653,667,681,695,707,721],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},894419,2,"多选题","下列关于屋面涂膜防水施工，表述错误的是（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","按先高后低原则进行",false,{"key":24,"text":25,"correct":22},"B","按涂料的品种分层逐遍涂布",{"key":27,"text":28,"correct":29},"C","屋面坡度小于15%的，胎体增强材料应平行于屋脊铺设",true,{"key":31,"text":32,"correct":29},"D","屋面坡度大于15%的，胎体增强材料可垂直于屋脊铺设",{"key":34,"text":35,"correct":22},"E","分隔缝处增设的胎体增强材料，宜空铺100mm的宽度","CD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},894420,"下列铺贴防水卷材的位置，应当满粘的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"立面",{"key":24,"text":45,"correct":29},"大坡面",{"key":27,"text":47,"correct":22},"基层变形较大部位",{"key":31,"text":49,"correct":29},"叠层铺贴的各层之间",{"key":34,"text":51,"correct":22},"距屋面周边1000mm内部位","ABD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},894421,"关于预应力混凝土工程施工，说法正确的是（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":29},"钢绞线作预应力钢筋，其混凝土强度等级不宜低于C40",{"key":24,"text":60,"correct":29},"预应力混凝土构件的施工中，不能掺用氯盐早强剂",{"key":27,"text":62,"correct":22},"先张法宜用于现场生产大型预应力构件",{"key":31,"text":64,"correct":22},"后张法多用于预制构件厂生产定型的中小型构件",{"key":34,"text":66,"correct":29},"后张法施工分为有黏结和无黏结两种","ABE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":67,"analysis":37},894422,"下列关于隧道模板浇筑混凝土的特点，表述正确的有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":29},"整体性好",{"key":24,"text":75,"correct":29},"抗震性好",{"key":27,"text":77,"correct":22},"施工速度慢",{"key":31,"text":79,"correct":22},"一次性模板投资小",{"key":34,"text":81,"correct":29},"需要配合大型起重设备",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},894423,"爬升模板，适用于的工程是（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":29},"剪力墙体系",{"key":24,"text":89,"correct":29},"筒体体系",{"key":27,"text":91,"correct":22},"框架体系",{"key":31,"text":93,"correct":22},"混合体系",{"key":34,"text":95,"correct":22},"钢结构体系","AB",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},894424,"立杆垫板或底座底面标高宜高于自然地坪一个高度，下列适宜的高度有（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"20mm",{"key":24,"text":104,"correct":22},"24mm",{"key":27,"text":106,"correct":29},"50mm",{"key":31,"text":108,"correct":29},"60mm",{"key":34,"text":110,"correct":29},"80mm","CDE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},894425,"某工程，拟采用井点降水，应根据（ ）等条件选择进行。",[116,118,120,122,124],{"key":20,"text":117,"correct":29},"渗透系数",{"key":24,"text":119,"correct":29},"降低水位的深度",{"key":27,"text":121,"correct":29},"工程特点",{"key":31,"text":123,"correct":29},"设备条件",{"key":34,"text":125,"correct":22},"管理水平","ABCD",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},894426,"放坡的坡度应根据（ ）等因素确定，在保证边坡稳定和方便施工的前提下，应减少放坡所增加的挖方量。",[131,133,135,137,139],{"key":20,"text":132,"correct":29},"土石性质",{"key":24,"text":134,"correct":29},"开挖深度",{"key":27,"text":136,"correct":29},"开挖方法",{"key":31,"text":138,"correct":22},"人工筹备",{"key":34,"text":140,"correct":29},"地下水位","ABCE",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},894427,"在预应力混凝土结构中，当采用钢绞线、钢丝、热处理钢筋作预应力钢筋时，混凝土强度等级可采用（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"C20",{"key":24,"text":149,"correct":22},"C30",{"key":27,"text":151,"correct":22},"C35",{"key":31,"text":153,"correct":29},"C40",{"key":34,"text":155,"correct":29},"C50","DE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},894428,"地下连续墙中导墙的作用有（）。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"提高墙体的刚度",{"key":24,"text":164,"correct":29},"加固槽口",{"key":27,"text":166,"correct":22},"确保混凝土保护层厚度",{"key":31,"text":168,"correct":29},"作为测量的基准",{"key":34,"text":170,"correct":29},"支承施工荷载","BDE",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":186,"analysis":37},894429,"关于地下连续墙施工，说法正确的有（）。",[176,178,180,182,184],{"key":20,"text":177,"correct":29},"机械化程度高",{"key":24,"text":179,"correct":29},"既可挡土防水也可以作建筑的基础",{"key":27,"text":181,"correct":22},"必须放坡开挖，施工土方量大",{"key":31,"text":183,"correct":29},"相邻段接头部位容易出现质量问题",{"key":34,"text":185,"correct":29},"作业现场容易出现污染","ABDE",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":201,"analysis":37},894430,"下列关于土石方开挖机械的表述，正确的有（ ）。",[191,193,195,197,199],{"key":20,"text":192,"correct":22},"推土机的经济运距为30～60m",{"key":24,"text":194,"correct":29},"浅孔钻属于冲击和切削并用的钻机",{"key":27,"text":196,"correct":29},"铲运机的运距以200～350m时效率最高",{"key":31,"text":198,"correct":29},"铲运机可在Ⅰ～Ⅱ类土中直接挖土、运土",{"key":34,"text":200,"correct":22},"单斗挖掘机按其工作装置不同，可分为机械传动和液压传动","BCD",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":141,"analysis":37},894431,"为了保证填土压实的效果，施工时应该采取的措施包括（ ）。",[206,208,210,212,214],{"key":20,"text":207,"correct":29},"由下至上分层铺填、分层压实",{"key":24,"text":209,"correct":29},"在填方时按设计要求预留沉降量",{"key":27,"text":211,"correct":29},"将透水性较大的土放在下层，透水性较小的土放在上层",{"key":31,"text":213,"correct":22},"将不同种类的填料混合拌匀后分层填筑",{"key":34,"text":215,"correct":29},"合理确定分层厚度及压实遍数",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":230,"analysis":37},894432,"防水混凝土施工应满足的工艺要求有（ ）。",[220,222,224,226,228],{"key":20,"text":221,"correct":22},"混凝土中不宜掺和膨胀水泥",{"key":24,"text":223,"correct":29},"入泵坍落度宜控制在120～140mm",{"key":27,"text":225,"correct":29},"浇筑时混凝土自落高度不得大于1.5m",{"key":31,"text":227,"correct":22},"采用自然养护不少于28天",{"key":34,"text":229,"correct":29},"当气温低于5℃时喷射混凝土不得喷水养护","BCE",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":171,"analysis":37},894433,"防水混凝土施工时应注意的事项有（ ）。",[235,237,239,241,243],{"key":20,"text":236,"correct":22},"应尽量采用人工振捣，不宜用机械振捣",{"key":24,"text":238,"correct":29},"浇筑时自落高度不得大于1.5m",{"key":27,"text":240,"correct":22},"应采用自然养护，养护时间不少于7d",{"key":31,"text":242,"correct":29},"墙体水平施工缝应留在高出底板表面300mm以上的墙体中",{"key":34,"text":244,"correct":29},"施工缝距墙体预留孔洞边缘不小于300mm",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":259,"analysis":37},894434,"关于地下连续墙施工说法，正确的有（ ）。",[249,251,253,255,257],{"key":20,"text":250,"correct":29},"多头钻开槽效率高，对周建筑物影响小",{"key":24,"text":252,"correct":22},"抓斗式挖槽机适用于挖软黏土",{"key":27,"text":254,"correct":29},"冲击式开槽施工效率低，成槽平整度差",{"key":31,"text":256,"correct":22},"泥浆主要起携砂作用",{"key":34,"text":258,"correct":29},"用导管法浇筑混凝土，应1.5h内浇筑完毕","ACE",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":141,"analysis":37},894435,"关于涂膜防水屋面施工，说法正确的有（ ）。",[264,266,268,270,272],{"key":20,"text":265,"correct":29},"膜防水层应按“先高后低，先远后近”的原则进行",{"key":24,"text":267,"correct":29},"涂膜应根据防水涂料的品种分层逐遍涂布",{"key":27,"text":269,"correct":29},"有高低跨的，先涂高跨屋面，后涂低跨屋面",{"key":31,"text":271,"correct":22},"设胎体增强材料时，上下层应相互垂直铺设",{"key":34,"text":273,"correct":29},"找平层分隔缝增设带有胎体增强材料的空铺附加层",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":171,"analysis":37},894436,"关于卷材防水屋面施工，说法正确的有（ ）。",[278,280,282,284,286],{"key":20,"text":279,"correct":22},"当基层变形较大时卷材防水层应优先选用满粘法",{"key":24,"text":281,"correct":29},"采用满粘法施工，找平层分格缝处卷材防水层宜空铺，空铺宽度宜为100mm",{"key":27,"text":283,"correct":22},"卷材宜垂直于屋脊铺贴，上下层卷材不得相互垂直铺贴。",{"key":31,"text":285,"correct":29},"同一层相邻两幅卷材短边搭接缝错开不应小于500mm",{"key":34,"text":287,"correct":29},"上下层卷材长边搭接缝应错开，且不应小于幅宽的1\u002F3",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":126,"analysis":37},894438,"关于导墙作用说法，正确的是（ ）。",[292,293,294,296,298],{"key":20,"text":164,"correct":29},{"key":24,"text":168,"correct":29},{"key":27,"text":295,"correct":29},"支撑施工荷载",{"key":31,"text":297,"correct":29},"储存泥浆",{"key":34,"text":299,"correct":22},"开槽护壁",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":52,"analysis":37},894443,"常见的混凝土的养护方法有（ ）。",[304,306,308,310,312],{"key":20,"text":305,"correct":29},"标准养护",{"key":24,"text":307,"correct":29},"热养护",{"key":27,"text":309,"correct":22},"冷结养护",{"key":31,"text":311,"correct":29},"自然养护",{"key":34,"text":313,"correct":22},"分件养护",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":328,"analysis":37},894444,"关于先张法预应力混凝土施工，说法正确的有（ ）。",[318,320,322,324,326],{"key":20,"text":319,"correct":29},"先支设底模再安装骨架，张拉钢筋后再支设侧模",{"key":24,"text":321,"correct":22},"先安装骨架再张拉钢筋然后支设底模和侧模",{"key":27,"text":323,"correct":22},"先支设侧模和骨架，再安装底模后张拉钢筋",{"key":31,"text":325,"correct":29},"混凝土宜采用自然养护和湿热养护",{"key":34,"text":327,"correct":29},"预应力钢筋需待混凝土达到一定的强度值方可放张","ADE",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":36,"analysis":37},894445,"土方开挖的降水深度约16m，土体渗透系数50m\u002Fd，可采用的降水方式有（ ）。",[333,335,337,339,341],{"key":20,"text":334,"correct":22},"轻型井点降水",{"key":24,"text":336,"correct":22},"喷射井点降水",{"key":27,"text":338,"correct":29},"管井井点降水",{"key":31,"text":340,"correct":29},"深井井点降水",{"key":34,"text":342,"correct":22},"电渗井点降水",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":186,"analysis":37},894446,"当卷材防水层上有重物覆盖或基层变形较大时，优先采用的施工铺贴方法有（ ）。",[347,349,351,353,355],{"key":20,"text":348,"correct":29},"空铺法",{"key":24,"text":350,"correct":29},"点粘法",{"key":27,"text":352,"correct":22},"满粘法",{"key":31,"text":354,"correct":29},"条粘法",{"key":34,"text":356,"correct":29},"机械固定法",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":171,"analysis":37},894447,"地下防水施工中，外贴法施工卷材防水层的主要特点有（ ）。",[361,363,365,367,369],{"key":20,"text":362,"correct":22},"施工占地面积较小",{"key":24,"text":364,"correct":29},"底板与墙身接头处卷材易受损",{"key":27,"text":366,"correct":22},"结构不均匀沉降对防水层影响大",{"key":31,"text":368,"correct":29},"可及时进行漏水试验，修补方便",{"key":34,"text":370,"correct":29},"施工工期较长",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":201,"analysis":37},894448,"路基石方爆破开挖时，选择清方机械主要考虑的因素有（ ）。",[375,377,379,381,383],{"key":20,"text":376,"correct":22},"场内道路条件",{"key":24,"text":378,"correct":29},"进场道路条件",{"key":27,"text":380,"correct":29},"一次爆破石方量",{"key":31,"text":382,"correct":29},"循环周转准备时间",{"key":34,"text":384,"correct":22},"当地气候条件",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":96,"analysis":37},894449,"关于装配式墩台施工方法应用的说法，正确的有（ ）。",[389,391,393,395,397],{"key":20,"text":390,"correct":29},"适用于跨越平缓无漂流物的河沟、河滩等桥梁",{"key":24,"text":392,"correct":29},"工地干扰多的地区优先采用",{"key":27,"text":394,"correct":22},"施工场地开阔的地区优先采用",{"key":31,"text":396,"correct":22},"水量供应充足的地区优先采用",{"key":34,"text":398,"correct":22},"砂石供应充足的地区优先采用",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":141,"analysis":37},894450,"桥梁承载结构施工方法中，转体施工的主要特点有（ ）。",[403,405,407,409,411],{"key":20,"text":404,"correct":29},"不影响通航或桥下交通",{"key":24,"text":406,"correct":29},"高空作业少，施工工艺简单",{"key":27,"text":408,"correct":29},"可利用地形，方便预制构件",{"key":31,"text":410,"correct":22},"施工设备种类多，装置复杂",{"key":34,"text":412,"correct":29},"节约木材，节省施工用料",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":427,"analysis":37},894451,"采用移动模架施工桥梁承载结构，其主要优点有（ ）。",[417,419,421,423,425],{"key":20,"text":418,"correct":22},"施工设备少，装置简单，易于操作",{"key":24,"text":420,"correct":29},"无需地面支架，不影响交通",{"key":27,"text":422,"correct":29},"机械化程度高，降低劳动强度",{"key":31,"text":424,"correct":29},"上下部结构可平行作业，缩短工期",{"key":34,"text":426,"correct":29},"模架可周转使用，可在预制场生产","BCDE",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":52,"analysis":37},894452,"冻结排桩法深基坑支护技术的主要特点有（ ）。",[432,434,436,438,440],{"key":20,"text":433,"correct":29},"适用于大体积深基坑施工",{"key":24,"text":435,"correct":29},"适用于含水量高的地基基础施工",{"key":27,"text":437,"correct":22},"不宜用于软土地基基础施工",{"key":31,"text":439,"correct":29},"适用于地下水丰富的地基基础施工",{"key":34,"text":441,"correct":22},"适用于工期要求较紧的基础施工",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":171,"analysis":37},894453,"地下连续墙开挖，对确定单元槽段长度因素说法正确的有（ ）。",[446,448,450,452,454],{"key":20,"text":447,"correct":22},"土层不稳定时，应增大槽段长度",{"key":24,"text":449,"correct":29},"附近有较大地面荷载时，可减少槽段长度",{"key":27,"text":451,"correct":22},"防水要求高时可减少槽段长度",{"key":31,"text":453,"correct":29},"混凝土供应充足时可选用较大槽段",{"key":34,"text":455,"correct":29},"现场起重能力强可选用较大槽段",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":470,"analysis":37},894454,"关于土桩和灰土桩的说法，正确的有（ ）。",[460,462,464,466,468],{"key":20,"text":461,"correct":29},"土桩和灰土桩挤密地基是由桩间挤密土和填夯的桩体组成",{"key":24,"text":463,"correct":22},"用于处理地下水位以下，深度5～15m的湿陷性黄土",{"key":27,"text":465,"correct":22},"土桩主要用于提高人工填土地基的承载力",{"key":31,"text":467,"correct":22},"灰土桩主要用于消除湿陷性黄土地基的湿陷性",{"key":34,"text":469,"correct":29},"不宜用于含水量超过25%的人工填土地基","AE",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":427,"analysis":37},894455,"关于预应力混凝土工程施工的说法，正确的是（ ）。",[475,477,479,481,483],{"key":20,"text":476,"correct":22},"冷拉钢筋不得直接用作预应力钢筋",{"key":24,"text":478,"correct":29},"先张法多用于预制构件厂生产定型的中小型构件",{"key":27,"text":480,"correct":29},"先张法常用于生产预应力桥跨结构",{"key":31,"text":482,"correct":29},"对后张法预应力板，现浇结构混凝土的龄期不宜小于5d",{"key":34,"text":484,"correct":29},"后张黏结预应力筋预留孔道成孔用管道应密封良好，接头应严密且不得漏浆",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":487,"answer":141,"analysis":37},894456,[488,490,492,494,495],{"key":20,"text":489,"correct":29},"保持施工环境干燥，避免带水施工",{"key":24,"text":491,"correct":29},"防水混凝土应自然养护，养护时间不少于14d",{"key":27,"text":493,"correct":29},"防水混凝土采用预拌混凝土时，入泵坍落度宜控制在120～140mm",{"key":31,"text":221,"correct":22},{"key":34,"text":496,"correct":29},"喷射混凝土终凝2h后应采取喷水养护，养护时间不得少于14d",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":186,"analysis":37},894457,"关于地下连续墙施工，说法正确的有（ ）。",[501,503,505,507,509],{"key":20,"text":502,"correct":29},"施工全盘机械化",{"key":24,"text":504,"correct":29},"具有多功能用途",{"key":27,"text":506,"correct":22},"必须放坡开挖、施工土方量大",{"key":31,"text":508,"correct":29},"每段连续墙之间的接头质量较难控制，易形成结构的薄弱点",{"key":34,"text":510,"correct":29},"作业现场易出现污染",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":96,"analysis":37},894458,"塔式起重机的工作速度参数有（ ）。",[515,517,519,521,523],{"key":20,"text":516,"correct":29},"起升速度",{"key":24,"text":518,"correct":29},"回转速度",{"key":27,"text":520,"correct":22},"牵引速度",{"key":31,"text":522,"correct":22},"俯仰变幅速度",{"key":34,"text":524,"correct":22},"大小车运行速度",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":539,"analysis":37},894459,"关于轮胎起重机特点及适用范围的说法，正确的有（ ）。",[529,531,533,535,537],{"key":20,"text":530,"correct":22},"适用于4层以下结构",{"key":24,"text":532,"correct":29},"不适合在泥泞的地面上工作",{"key":27,"text":534,"correct":22},"可单侧布置",{"key":31,"text":536,"correct":29},"不适合在松软的地面上工作",{"key":34,"text":538,"correct":22},"可提高吊装效率","BD",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":259,"analysis":37},894460,"编制单位工程施工组织设计的依据有（ ）",[544,546,548,550,552],{"key":20,"text":545,"correct":29},"工程承包合同",{"key":24,"text":547,"correct":22},"工程网络计划文件",{"key":27,"text":549,"correct":29},"预算文件提供的有关数据",{"key":31,"text":551,"correct":22},"项目部人员配置计划",{"key":34,"text":553,"correct":29},"施工现场的具体情况",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":111,"analysis":37},894461,"施工组织总设计、单位(单项)工程施工组织设计和分部(分项)工程施工组织设计的不同之处是( )。",[558,560,562,564,566],{"key":20,"text":559,"correct":22},"目标",{"key":24,"text":561,"correct":22},"编制原则",{"key":27,"text":563,"correct":29},"编制的施工范围",{"key":31,"text":565,"correct":29},"依据的具体资料",{"key":34,"text":567,"correct":29},"要求的深度",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":126,"analysis":37},894462,"进行定量分析常用的技术经济评价指标有( )。",[572,574,576,578,580],{"key":20,"text":573,"correct":29},"施工准备期",{"key":24,"text":575,"correct":29},"劳动力不均匀系数",{"key":27,"text":577,"correct":29},"工伤事故率",{"key":31,"text":579,"correct":29},"预制加工程度",{"key":34,"text":581,"correct":22},"节约砂石百分比",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":201,"analysis":37},894463,"某施工企业承接了某住宅小区中10号楼的土建施工任务，项目经理部针对该施工编制了施工组织设计，其内容有（）。",[586,588,590,592,594],{"key":20,"text":587,"correct":22},"工程概况及特点分析",{"key":24,"text":589,"correct":29},"资源需求计划",{"key":27,"text":591,"correct":29},"施工方案",{"key":31,"text":593,"correct":29},"施工进度计划",{"key":34,"text":595,"correct":22},"施工部署",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":610,"analysis":37},894464,"单位工程施工组织设计中所涉及的技术组织措施应包括（ ）。",[600,602,604,606,608],{"key":20,"text":601,"correct":29},"降低成本措施",{"key":24,"text":603,"correct":22},"节约工期的措施",{"key":27,"text":605,"correct":29},"季节性施工措施",{"key":31,"text":607,"correct":29},"防止环境污染的措施",{"key":34,"text":609,"correct":22},"保证资源供应的措施","ACD",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":96,"analysis":37},894465,"单位工程施工组织设计的编制，满足下列要求（ ）。",[615,617,619,621,623],{"key":20,"text":616,"correct":29},"合理划分施工段和施工顺序",{"key":24,"text":618,"correct":29},"专业工种合理搭接和密切配合",{"key":27,"text":620,"correct":22},"原料进场计划安排合理",{"key":31,"text":622,"correct":22},"加工厂布局合理高效",{"key":34,"text":624,"correct":22},"供水管网布置合理",{"id":626,"libraryId":5,"type":15,"typeLabel":16,"stem":627,"options":628,"answer":427,"analysis":37},894466,"编制施工组织总设计时，通常要对整个建设过程进行施工部署，其主要工作应包括（ ）。",[629,631,633,635,637],{"key":20,"text":630,"correct":22},"组织各种物资",{"key":24,"text":632,"correct":29},"确定工程开展程序",{"key":27,"text":634,"correct":29},"拟定总体施工方案",{"key":31,"text":636,"correct":29},"明确施工任务划分与组织安排",{"key":34,"text":638,"correct":29},"编制施工准备工作计划",{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":470,"analysis":37},894467,"施工组织总设计的主要内容有（ ）。",[643,645,647,649,651],{"key":20,"text":644,"correct":29},"工程技术经济指标",{"key":24,"text":646,"correct":22},"施工部署和施工方案",{"key":27,"text":648,"correct":22},"合同谈判方案",{"key":31,"text":650,"correct":22},"主要措施项目清单",{"key":34,"text":652,"correct":29},"总进度计划",{"id":654,"libraryId":5,"type":15,"typeLabel":16,"stem":655,"options":656,"answer":36,"analysis":37},894468,"下列关于工程项目施工组织设计，正确的说法是（ ）。",[657,659,661,663,665],{"key":20,"text":658,"correct":22},"施工组织设计是纯技术性文件",{"key":24,"text":660,"correct":22},"施工组织设计必须在投标前编制完成",{"key":27,"text":662,"correct":29},"施工组织设计可作为项目管理规划文件",{"key":31,"text":664,"correct":29},"施工组织设计可用做施工前的准备工作文件",{"key":34,"text":666,"correct":22},"施工组织总设计应由设计单位编制",{"id":668,"libraryId":5,"type":15,"typeLabel":16,"stem":669,"options":670,"answer":96,"analysis":37},894469,"下列施工组织设计的内容中，属于施工部署与施工方案内容的有（ ）。",[671,673,675,677,679],{"key":20,"text":672,"correct":29},"安排施工顺序",{"key":24,"text":674,"correct":29},"比选施工方案",{"key":27,"text":676,"correct":22},"计算主要技术经济指标",{"key":31,"text":678,"correct":22},"编制施工准备计划",{"key":34,"text":680,"correct":22},"编制资源需求计划",{"id":682,"libraryId":5,"type":15,"typeLabel":16,"stem":683,"options":684,"answer":610,"analysis":37},894470,"下列有关施工组织设计的表述，正确的有（ ）。",[685,687,689,691,693],{"key":20,"text":686,"correct":29},"施工平面图是施工方案及施工进度计划在空间上的全面安排",{"key":24,"text":688,"correct":22},"单位工程施工组织设计是指导分部分项工程施工的依据",{"key":27,"text":690,"correct":29},"只有在编制施工总进度计划后才可编制资源需求量计划",{"key":31,"text":692,"correct":29},"对于简单工程，可以只编制施工方案及施工进度计划和施工平面图",{"key":34,"text":694,"correct":22},"只有在编制施工总进度计划后才可制订施工方案",{"id":696,"libraryId":5,"type":15,"typeLabel":16,"stem":697,"options":698,"answer":52,"analysis":37},894471,"施工组织总设计、单位工程施工组织设计及分部（分项）工程施工组织设计都具备的内容有（ ）。",[699,700,702,703,705],{"key":20,"text":593,"correct":29},{"key":24,"text":701,"correct":29},"各项资源需求量计划",{"key":27,"text":595,"correct":22},{"key":31,"text":704,"correct":29},"工程概况",{"key":34,"text":706,"correct":22},"主要技术经济指标",{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":141,"analysis":37},894472,"梁平法施工图采用集中标注时，以下各项为必注值的有（ ）。",[711,713,715,717,719],{"key":20,"text":712,"correct":29},"梁箍筋",{"key":24,"text":714,"correct":29},"梁上部通长筋",{"key":27,"text":716,"correct":29},"梁侧面纵向构造钢筋或受扭钢筋",{"key":31,"text":718,"correct":22},"梁顶面标高高差",{"key":34,"text":720,"correct":29},"架立筋",{"id":722,"libraryId":5,"type":15,"typeLabel":16,"stem":723,"options":724,"answer":735,"analysis":37},894473,"根据《国家建筑标准设计图集》（16G101）平法施工图注写方式，含义正确的有（）。 A.LZ表示梁上柱",[725,727,729,731,733],{"key":20,"text":726,"correct":29},"梁300×700Y400×300表示梁规格为300×700，水平加腋长、宽分别为400、300",{"key":24,"text":728,"correct":22},"XL300×600／400表示根部和端部不同高的悬挑梁",{"key":27,"text":730,"correct":29},"φ10@120（4）／150（2）表示φ10的钢筋加密区间距120，4肢箍，非加密区间距150，2肢箍",{"key":31,"text":732,"correct":29},"KL3（2",{"key":34,"text":734,"correct":29},"400×600表示3号楼层框架梁，2跨，一端悬挑","ACDE",[737,741,744,747,750,753],{"id":738,"name":739,"category":7,"favorite":740},1,"领导干部任职前廉政法规知识测试题",92,{"id":742,"name":743,"category":7,"favorite":738},595,"建筑结构与设备",{"id":745,"name":746,"category":7,"favorite":738},715,"招标采购专业知识与法律法规",{"id":748,"name":749,"category":7,"favorite":738},848,"市政方向-通用基础",{"id":751,"name":752,"category":7,"favorite":8},534,"BIM工程师",{"id":754,"name":752,"category":7,"favorite":8},535]