[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-580-25":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":579},{"id":5,"name":6,"category":7,"favorite":8},580,"[土木建筑工程]建设工程计量与计价实务","建筑工程",0,25,50,1733,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,189,201,213,224,236,248,260,272,284,293,304,316,328,339,347,356,364,373,382,394,406,416,424,432,440,448,460,472,484,496,508,519,531,543,555,567],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},894205,1,"单选题","冷粘法以满铺为依据编制，点、条铺粘者按其相应项目的人工乘以系数（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","1.43",false,{"key":24,"text":25,"correct":22},"B","1.30",{"key":27,"text":28,"correct":22},"C","1.05",{"key":30,"text":31,"correct":32},"D","0.91",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},894207,"下列费用项目不属于企业管理费的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":32},"社会保险费",{"key":24,"text":41,"correct":22},"劳动保护费",{"key":27,"text":43,"correct":22},"检验试验费",{"key":30,"text":45,"correct":22},"教育费附加",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},894208,"下列属于建安工程费中企业管理费的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":32},"劳动力招募费",{"key":24,"text":53,"correct":22},"工程保险费",{"key":27,"text":55,"correct":22},"市政公用设施费",{"key":30,"text":57,"correct":22},"管理人员的住房公积金",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},894209,"为合理划分发承包双方的合同风险，对于招标工程，在施工合同中约定的基准日期一般为（）。",[62,64,66,68],{"key":20,"text":63,"correct":32},"招标文件中规定的提交投标文件截止时间前的第28天",{"key":24,"text":65,"correct":22},"招标文件中规定的提交投标文件截止时间前的第42天",{"key":27,"text":67,"correct":22},"施工合同签订前的第28天",{"key":30,"text":69,"correct":22},"施工合同签订前的第42天",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},894210,"编制招标控制价时，下列关于综合单价的确定方法，错误的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":32},"工程量清单综合单价=∑定额项目合价\u002F工程量清单项目工程量，不考虑未计价材料费用",{"key":24,"text":77,"correct":22},"工程设备、材料价格的市场风险，考虑一定率值的风险费用，纳入到综合单价中",{"key":27,"text":79,"correct":22},"税金、规费等法律、法规、规章和政策变化风险和人工单价等风险费用，不应纳入综合单价",{"key":30,"text":81,"correct":22},"综合单价中应包括暂估价中的材料和工程设备暂估单价",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},894211,"措施项目组价的方法是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"消耗量定额和价目表表现形式的组价",{"key":24,"text":89,"correct":32},"综合单价和费率形式的组价",{"key":27,"text":91,"correct":22},"消耗量定额和综合单价形式的组价",{"key":30,"text":93,"correct":22},"综合单价和价目表表现形式的组价",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},894212,"编制招标控制价时，不可竞争的费用不包括（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"安全文明施工费",{"key":24,"text":101,"correct":22},"规费",{"key":27,"text":103,"correct":22},"税金",{"key":30,"text":105,"correct":32},"夜间施工增加",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},894213,"关于投标报价，下列说法中正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"总价措施项目由投标人自主报价",{"key":24,"text":113,"correct":22},"暂列金额依据招标工程量清单总说明，结合项目管理规划自主填报",{"key":27,"text":115,"correct":22},"暂估价依据询价情况填报",{"key":30,"text":117,"correct":32},"投标人对投标报价的任何优惠均应反映在相应清单项目的综合单价中",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},894214,"根据《建设工程工程量清单计价规范》（GB50500-2013），关于施工发承包投标报价的编制，下列做法正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"设计图纸与招投标工程量清单项目特征描述不同的，以设计图纸特征为准",{"key":24,"text":125,"correct":32},"暂列金额应按照招投标工程量清单中列出的金额填写，不得变动",{"key":27,"text":127,"correct":22},"材料、工程设备暂估价应按暂估单价，乘以所需数量后计入其他项目费",{"key":30,"text":129,"correct":22},"总承包服务费应按照投标人提出的协调、配合和服务项目自主报价",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},894215,"关于施工合同履行过程中暂估价的确定，下列说法中正确的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"不属于依法必须招标的材料，以承包人自行采购的价格取代暂估价",{"key":24,"text":137,"correct":32},"属于依法必须招标的暂估价设备，由发承包双方以招标方式选择供应商，以中标价取代暂估价",{"key":27,"text":139,"correct":22},"不属于依法必须招标的暂估价专业工程，不应按工程变更确定工程价款而应另行签订补充协议确定工程价款",{"key":30,"text":141,"correct":22},"属于依法必须招标的暂估价专业工程，承包人不得参加投标",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},894216,"当施工机械停工导致用索赔成立时，台班停滞费用正确的计算方法是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"按照机械设备台班费计算",{"key":24,"text":149,"correct":22},"按照台班费中的设备使用费计算",{"key":27,"text":151,"correct":32},"自有设备按照台班折旧费计算",{"key":30,"text":153,"correct":22},"租赁设备按照台班租金计算",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},894217,"在工程施工中，由于不可抗力事件的发生，导致下列费用发生，需要由承包人承担的部分是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"工程所需清理、修复费用",{"key":24,"text":161,"correct":22},"应工程师要求留在施工场地的管理人员的费用",{"key":27,"text":163,"correct":32},"承包人施工人员的伤亡损失",{"key":30,"text":165,"correct":22},"在现场执行工作的发包方管理人员",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},894218,"招标人自行供应材料的，总承包服务费按招标人供应材料价值的（ ）计算。",[170,172,174,176],{"key":20,"text":171,"correct":32},"1%",{"key":24,"text":173,"correct":22},"1.5%",{"key":27,"text":175,"correct":22},"3%",{"key":30,"text":177,"correct":22},"5%",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},894219,"幕墙饰面中的结构胶与耐候胶设计与定额取定的用量不同时，定额中的相关材料用量可以调整，施工损耗按（ ）计算。",[182,183,185,187],{"key":20,"text":177,"correct":22},{"key":24,"text":184,"correct":22},"10%",{"key":27,"text":186,"correct":32},"15%",{"key":30,"text":188,"correct":22},"20%",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},894220,"同一施工现场各建筑物之间的运输，定额按100m以内综合考虑，如转移距离超过100m，在300m以内的，按相应场外运输费用乘以系数（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"0.2",{"key":24,"text":196,"correct":32},"0.3",{"key":27,"text":198,"correct":22},"0.4",{"key":30,"text":200,"correct":22},"0.5",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":30,"analysis":33},894221,"下列不属于企业管理费中差旅交通费构成的是（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"职工因公出差",{"key":24,"text":208,"correct":22},"调动工作的差旅费",{"key":27,"text":210,"correct":22},"住勤补助费",{"key":30,"text":212,"correct":32},"特殊情况下支付的工资",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":30,"analysis":33},894222,"企业为施工生产筹集资金或提供预付款担保、履约担保、职工工资支付担保等所发生的各种费用是（ ）。",[217,218,220,222],{"key":20,"text":43,"correct":22},{"key":24,"text":219,"correct":22},"办公费",{"key":27,"text":221,"correct":22},"财产保险费",{"key":30,"text":223,"correct":32},"财务费",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":30,"analysis":33},894223,"下列选项不属于《内蒙古自治区绿色建筑工程预算定额》内容的是（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"节地与室外环境",{"key":24,"text":231,"correct":22},"节能与能源利用",{"key":27,"text":233,"correct":22},"节水与水资源利用",{"key":30,"text":235,"correct":32},"文明施工",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":20,"analysis":33},894224,"《内蒙古自治区建筑安装工程工期定额》是指自开工之日起，完成各章、节所包含的全部工程内容并达到国家验收标准之日止的（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":32},"包括法定节假日的日历天数",{"key":24,"text":243,"correct":22},"不包括法定节假日的日历天数",{"key":27,"text":245,"correct":22},"工作日天数",{"key":30,"text":247,"correct":22},"合同工期天数",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},894225,"下列关于其他项目费的编制说法错误的是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":32},"暂列金额应由投标人自主填写",{"key":24,"text":255,"correct":22},"暂估价中的材料、工程设备单价应按招标工程量清单中列出的单价计入综合单价",{"key":27,"text":257,"correct":22},"计日工应按招标工程量清单中列出的项目根据工程特点和有关计价依据确定综合单价计算",{"key":30,"text":259,"correct":22},"总承包服务费应根据工程量清单列出的内容和要求按国家或内蒙古自治区建设主管部门的相关规定计算",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":24,"analysis":33},894226,"为了合理划分发承包双方的合同风险，施工合同中应当约定一个基准日，对于基准日之后发生的、承包人在招标投标阶段不可能合理预见的风险，应当由（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":22},"承包人",{"key":24,"text":267,"correct":32},"发包人",{"key":27,"text":269,"correct":22},"监理人",{"key":30,"text":271,"correct":22},"政府",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":20,"analysis":33},894227,"根据《2017届房屋建筑与装饰工程预算定额》，某土方项目底宽6米，长20米，应执行（ ）相应定额子目。",[276,278,280,282],{"key":20,"text":277,"correct":32},"沟槽",{"key":24,"text":279,"correct":22},"基坑",{"key":27,"text":281,"correct":22},"基础",{"key":30,"text":283,"correct":22},"一般土方",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":30,"analysis":33},894228,"地表水排出后，土壤含水率大于（ ）(质量分数）时为湿土。",[288,289,290,291],{"key":20,"text":184,"correct":22},{"key":24,"text":186,"correct":22},{"key":27,"text":188,"correct":22},{"key":30,"text":292,"correct":32},"25%",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":20,"analysis":33},894229,"满堂基础垫层底以下局部加深的槽坑，按槽坑相应规侧计算工程量，相应项目人工、机械乘以系数（ ）。",[297,299,301,302],{"key":20,"text":298,"correct":32},"1.25",{"key":24,"text":300,"correct":22},"0.90",{"key":27,"text":21,"correct":22},{"key":30,"text":303,"correct":22},"1.15",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":30,"analysis":33},894230,"土石方运输是按施工现场至弃土场考虑的，运输距离以（ ）以内考虑。",[308,310,312,314],{"key":20,"text":309,"correct":22},"10km",{"key":24,"text":311,"correct":22},"15km",{"key":27,"text":313,"correct":22},"20km",{"key":30,"text":315,"correct":32},"25km",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":20,"analysis":33},894231,"工程废料均为密实体积，如为堆积体积，应按照堆积体积乘以（ ）系数进行换算。",[320,322,324,326],{"key":20,"text":321,"correct":32},"0.8",{"key":24,"text":323,"correct":22},"0.9",{"key":27,"text":325,"correct":22},"1.0",{"key":30,"text":327,"correct":22},"1.1",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":30,"analysis":33},894232,"单独打试桩、锚桩，按相应定额的打桩人工及机械乘以系数（ ）。",[332,334,335,337],{"key":20,"text":333,"correct":22},"1.20",{"key":24,"text":25,"correct":22},{"key":27,"text":336,"correct":22},"1.40",{"key":30,"text":338,"correct":32},"1.50",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":30,"analysis":33},894233,"人工挖孔桩，桩内垂直运输方式按人工考虑，深度超过20m时,相应定额乘以系数（ ）计算。",[343,344,345,346],{"key":20,"text":333,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":336,"correct":22},{"key":30,"text":338,"correct":32},{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":27,"analysis":33},894234,"双面清水围墙按相应单面清水墙项目，人工用量乘以系数（ ）。",[351,352,354,355],{"key":20,"text":28,"correct":22},{"key":24,"text":353,"correct":22},"1.10",{"key":27,"text":303,"correct":32},{"key":30,"text":298,"correct":22},{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":30,"analysis":33},894235,"斜梁（板）按坡度＞10°且≤30°综合考虑,坡度在60°以上时人工乘以系数（ ）。",[360,361,362,363],{"key":20,"text":28,"correct":22},{"key":24,"text":353,"correct":22},{"key":27,"text":303,"correct":22},{"key":30,"text":333,"correct":32},{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":20,"analysis":33},894236,"楼梯是按建筑物一个自然层双跑楼梯考虑，三跑楼梯（即一个自然层、两个休息平台）按相应项目定额乘以系数（ ）。",[368,369,371,372],{"key":20,"text":323,"correct":32},{"key":24,"text":370,"correct":22},"0.95",{"key":27,"text":28,"correct":22},{"key":30,"text":327,"correct":22},{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":20,"analysis":33},894237,"钢筋混凝土蒙古包穹顶厚度低于10cm时人工乘以系数1.2,超过20cm时人工乘以系数（ ）。",[377,379,380,381],{"key":20,"text":378,"correct":32},"0.85",{"key":24,"text":370,"correct":22},{"key":27,"text":28,"correct":22},{"key":30,"text":327,"correct":22},{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":27,"analysis":33},894238,"根据定额规定，直径（ ）以上的钢筋连接按机械连接考虑。",[386,388,390,392],{"key":20,"text":387,"correct":22},"16mm",{"key":24,"text":389,"correct":22},"20mm",{"key":27,"text":391,"correct":32},"25mm",{"key":30,"text":393,"correct":22},"30mm",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},894239,"预应力钢丝束、钢绞线长度大于（ ）时，应采用分段张拉。",[398,400,402,404],{"key":20,"text":399,"correct":22},"30m",{"key":24,"text":401,"correct":32},"50m",{"key":27,"text":403,"correct":22},"80m",{"key":30,"text":405,"correct":22},"100m",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},894240,"钢格栅如果采用成品格栅，制作人工、辅材、机械乘以系数（ ）。",[410,412,413,414],{"key":20,"text":411,"correct":32},"0.6",{"key":24,"text":321,"correct":22},{"key":27,"text":327,"correct":22},{"key":30,"text":415,"correct":22},"1.2",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":24,"analysis":33},894241,"铝合金成品门窗安装项目按隔热断桥铝合金型材考虑，当设计为普通铝合金型材时，按相应项目执行，其中人工乘以系数（ ）。",[420,421,422,423],{"key":20,"text":411,"correct":22},{"key":24,"text":321,"correct":32},{"key":27,"text":327,"correct":22},{"key":30,"text":415,"correct":22},{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":27,"analysis":33},894242,"采用不镑钢水落管排水时，执行镀锌钢管项目，材料按实际换算，人工乘以系数（ ）。",[428,429,430,431],{"key":20,"text":411,"correct":22},{"key":24,"text":321,"correct":22},{"key":27,"text":327,"correct":32},{"key":30,"text":415,"correct":22},{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":27,"analysis":33},894243,"弧形墙墙面保温隔热层，按相应项目的人工乘以系数（ ）。",[436,437,438,439],{"key":20,"text":411,"correct":22},{"key":24,"text":321,"correct":22},{"key":27,"text":327,"correct":32},{"key":30,"text":415,"correct":22},{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":30,"analysis":33},894244,"石材螺旋形楼梯按弧形楼梯项目执行，其中人工乘以系数（ ）。",[444,445,446,447],{"key":20,"text":411,"correct":22},{"key":24,"text":321,"correct":22},{"key":27,"text":327,"correct":22},{"key":30,"text":415,"correct":32},{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":24,"analysis":33},894245,"不可抗力造成损失时，下列应由发包人承担的是（ ）。",[452,454,456,458],{"key":20,"text":453,"correct":22},"施工机械设备损坏",{"key":24,"text":455,"correct":32},"待安装的设备损坏",{"key":27,"text":457,"correct":22},"承包人人员伤亡",{"key":30,"text":459,"correct":22},"承包人停工损失",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":24,"analysis":33},894246,"工期索赔的计算方法不包括（ ）。",[464,466,468,470],{"key":20,"text":465,"correct":22},"直接法",{"key":24,"text":467,"correct":32},"间接费",{"key":27,"text":469,"correct":22},"比例计算法",{"key":30,"text":471,"correct":22},"网络图分析法",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":20,"analysis":33},894247,"下列不属于编制工程竣工决算应具备的条件有（ ）。",[476,478,480,482],{"key":20,"text":477,"correct":32},"有完整的技术档案和施工管理资料",{"key":24,"text":479,"correct":22},"单项工程或建设项目竣工结算已完成",{"key":27,"text":481,"correct":22},"收尾工程投资和预留费用不超过规定的比例",{"key":30,"text":483,"correct":22},"经批准的初步设计所确定的工程内容已完成",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":30,"analysis":33},894249,"保护近地外墙墙身免受雨水侵蚀或人为碰撞的构造是（ ）",[488,490,492,494],{"key":20,"text":489,"correct":22},"散水",{"key":24,"text":491,"correct":22},"过梁",{"key":27,"text":493,"correct":22},"防撞墙",{"key":30,"text":495,"correct":32},"勒脚",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":20,"analysis":33},894250,"下列材料不用于幕墙装饰的是（ ）",[500,502,504,506],{"key":20,"text":501,"correct":32},"木板",{"key":24,"text":503,"correct":22},"玻璃",{"key":27,"text":505,"correct":22},"石材",{"key":30,"text":507,"correct":22},"金属板",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":30,"analysis":33},894251,"常用的龙骨的材料一般不包含（ ）",[512,514,516,518],{"key":20,"text":513,"correct":22},"木",{"key":24,"text":515,"correct":22},"轻钢",{"key":27,"text":517,"correct":22},"铝合金",{"key":30,"text":505,"correct":32},{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":30,"analysis":33},894252,"设有地下室且基础埋深较大的特大荷载的建筑，最常用的基础构造形式为（ ）",[523,525,527,529],{"key":20,"text":524,"correct":22},"独立基础",{"key":24,"text":526,"correct":22},"条形基础",{"key":27,"text":528,"correct":22},"片筏基础",{"key":30,"text":530,"correct":32},"箱形基础",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":20,"analysis":33},894253,"我国单层工业厂房多采用装配式钢筋混凝土（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":32},"排架结构",{"key":24,"text":538,"correct":22},"空间结构",{"key":27,"text":540,"correct":22},"屋架结构",{"key":30,"text":542,"correct":22},"刚架结构",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":30,"analysis":33},894254,"下列不属于土方边坡考虑的因素的是（ ）",[547,549,551,553],{"key":20,"text":548,"correct":22},"土方类别",{"key":24,"text":550,"correct":22},"开挖深度",{"key":27,"text":552,"correct":22},"开挖方法",{"key":30,"text":554,"correct":32},"压实机械",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":30,"analysis":33},894255,"下列哪一工序是地下连续墙特有的工序（ ）",[559,561,563,565],{"key":20,"text":560,"correct":22},"土方开挖",{"key":24,"text":562,"correct":22},"打入钢板桩",{"key":27,"text":564,"correct":22},"放样定位",{"key":30,"text":566,"correct":32},"修筑导墙",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":24,"analysis":33},894256,"下列不属于混凝土预制桩沉桩工序的是（ ）",[571,573,575,577],{"key":20,"text":572,"correct":22},"桩机安装",{"key":24,"text":574,"correct":32},"配制泥浆",{"key":27,"text":576,"correct":22},"送桩",{"key":30,"text":578,"correct":22},"接桩",[580,583,586,589,592,595],{"id":15,"name":581,"category":7,"favorite":582},"领导干部任职前廉政法规知识测试题",92,{"id":584,"name":585,"category":7,"favorite":15},595,"建筑结构与设备",{"id":587,"name":588,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":590,"name":591,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":593,"name":594,"category":7,"favorite":8},534,"BIM工程师",{"id":596,"name":594,"category":7,"favorite":8},535]