[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-580-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":607},{"id":5,"name":6,"category":7,"favorite":8},580,"[土木建筑工程]建设工程计量与计价实务","建筑工程",0,23,50,1733,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,344,356,367,377,389,401,413,425,437,445,457,469,478,487,499,511,523,535,547,559,571,583,595],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},894104,1,"单选题","根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），天棚抹灰工程量计算正确的是（）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","间壁墙、附墙柱所占面积应予扣除",false,{"key":24,"text":25,"correct":22},"B","带梁天棚、梁两侧抹灰面积不计算",{"key":27,"text":28,"correct":22},"C","板式楼梯底面抹灰按水平投影面积计算",{"key":30,"text":31,"correct":32},"D","锯齿形楼梯底板抹灰按展开面积计算",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},894105,"根据《建设工程工程量清单计价规范》（GB 50500－2013），土石方工程中，建筑物场地厚度在±30cm以内的，平整场地工程量应（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"按建筑物自然层面积计算",{"key":24,"text":41,"correct":32},"按建筑物首层建筑面积计算",{"key":27,"text":43,"correct":22},"按建筑有效面积计算",{"key":30,"text":45,"correct":22},"按设计图示厚度计算",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},894106,"根据《建设工程工程量清单计价规范》（GB 50500－2013），当土方开挖底长≤3倍底宽，且底面积＞150m2，开挖深度为0.8m时，清单项目应列为（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"平整场地",{"key":24,"text":53,"correct":32},"挖一般土方",{"key":27,"text":55,"correct":22},"挖沟槽土方",{"key":30,"text":57,"correct":22},"挖基坑土方",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},894107,"某建筑工程挖土方工程量需要通过现场签证核定，已知用斗容量为1.5m3的轮胎式装载机运土500车，则挖土工程量应为（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"501.92m3",{"key":24,"text":65,"correct":32},"576.92m3",{"key":27,"text":67,"correct":22},"623.15m3",{"key":30,"text":69,"correct":22},"750.00m3",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},894108,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于土方的项目列项或工程量计算正确的为（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"建筑物场地厚度为350mm的挖土应按平整场地项目列项",{"key":24,"text":77,"correct":22},"挖一般土方的工程量通常按开挖虚方体积计算",{"key":27,"text":79,"correct":32},"基础土方开挖需区分沟槽、基坑和一般土方项目分别列项",{"key":30,"text":81,"correct":22},"冻土开挖工程量需按虚方体积计算",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},894109,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于地基处理工程量计算的说法，正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"换填垫层按照图示尺寸以面积计算",{"key":24,"text":89,"correct":22},"铺设土工合成材料按图示尺寸以铺设长度计算",{"key":27,"text":91,"correct":22},"强夯地基按图示处理范围和深度以体积计算",{"key":30,"text":93,"correct":32},"振冲密实不填料的按图示处理范围以面积计算",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},894110,"根据《建设工程工程量清单计价规范》（GB 50500－2013），地下连续墙的工程量应（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"按设计图示槽横断面面积乘以槽深以体积计算",{"key":24,"text":101,"correct":22},"按设计图示尺寸以支护面积计算",{"key":27,"text":103,"correct":22},"按设计图示以墙中心线长度计算",{"key":30,"text":105,"correct":32},"按设计图示墙中心线长乘以厚度乘以槽深以体积计算",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},894111,"根据《建设工程工程量清单计价规范》（GB 50500－2013），下列工程量计算的说法，正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"砂石土桩只能按根数计算",{"key":24,"text":113,"correct":32},"粉喷桩按设计图示尺寸以桩长（包括桩尖）计算",{"key":27,"text":115,"correct":22},"地下连续墙按长度计算",{"key":30,"text":117,"correct":22},"锚杆支护按支护土体体积计算",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},894112,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于基坑与边坡支护工程量计算的说法，正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":32},"地下连续墙按设计图示尺寸以体积计算",{"key":24,"text":125,"correct":22},"咬合灌注桩按设计图示尺寸以体积计算",{"key":27,"text":127,"correct":22},"喷射混凝土按设计图示以体积计算",{"key":30,"text":129,"correct":22},"预制钢筋混凝土板桩按照设计图示尺寸以体积计算",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},894113,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于桩基础的项目列项或工程量计算正确的为（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":32},"预制钢筋混凝土管桩试验桩应在工程量清单中单独列项",{"key":24,"text":137,"correct":22},"预制钢筋混凝土方桩试验桩工程量应并入预制钢筋混凝土方桩项目",{"key":27,"text":139,"correct":22},"现场截凿桩头工程量不单独列项，并入桩工程量计算",{"key":30,"text":141,"correct":22},"挖孔桩土方按设计桩长（包括桩尖）以米计算",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":30,"analysis":33},894114,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于实心砖墙高度计算的说法，正确的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"有屋架且室内外均有天棚者，外墙高度算至屋架下弦底另加100mm",{"key":24,"text":149,"correct":22},"有屋架且无天棚者，外墙高度算至屋架下弦底另加200mm",{"key":27,"text":151,"correct":22},"无屋架者，内墙高度算至天棚底另加300mm",{"key":30,"text":153,"correct":32},"女儿墙高度从屋面板上表面算至混凝土压顶下表面",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},894115,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于砌块墙高度计算正确的为（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":32},"外墙从基础顶面算至平屋面板底面",{"key":24,"text":161,"correct":22},"女儿墙从屋面板顶面算至压顶顶面",{"key":27,"text":163,"correct":22},"围墙从基础顶面算至混凝土压顶上表面",{"key":30,"text":165,"correct":22},"外山墙从基础顶面算至山墙最高点",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},894116,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于现浇混凝土梁工程量计算的说法，正确的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"圈梁区分不同断面按设计中心线长度计算",{"key":24,"text":173,"correct":22},"过梁工程不单独计算，并入墙体工程量计算",{"key":27,"text":175,"correct":32},"异形梁按设计图示尺寸以体积计算",{"key":30,"text":177,"correct":22},"拱形梁按设计拱形轴线长度计算",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},894117,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于现浇混凝土板工程量计算的说法，正确的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":32},"空心板按图示尺寸以体积计算，扣除空心所占体积",{"key":24,"text":185,"correct":22},"雨蓬板从外墙内侧算至雨蓬板结构外边线按面积计算",{"key":27,"text":187,"correct":22},"阳台板按墙体中心线以外部图示面积计算",{"key":30,"text":189,"correct":22},"天沟板按设计图示尺寸中心线长度计算",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":30,"analysis":33},894118,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于现浇混凝土板的工程量计算正确的为（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"栏板按设计图示尺寸以面积计算",{"key":24,"text":197,"correct":22},"雨篷按设计外墙中心线外图示体积计算",{"key":27,"text":199,"correct":22},"阳台板按设计外墙中心线外图示面积计算",{"key":30,"text":201,"correct":32},"散水按设计图示尺寸以面积计算",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":30,"analysis":33},894119,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于现浇混凝土柱工程量计算，说法正确的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"有梁板矩形独立柱工程量按柱设计截面积乘以自柱基底面至板面高度以体积计算",{"key":24,"text":209,"correct":22},"无梁板矩形柱工程量按柱设计截面积乘以自楼板上表面至柱帽上表面高度以体积计算",{"key":27,"text":211,"correct":22},"框架柱工程量按柱设计截面积乘以自柱基底面至柱顶面高度以体积计算",{"key":30,"text":213,"correct":32},"构造柱按设计尺寸自柱底面至顶面全高以体积计算",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},894120,"根据《建设工程工程量清单计价规范》（GB 50500－2013），现浇混凝土楼梯的工程量应（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":32},"按设计图示尺寸以体积计算",{"key":24,"text":221,"correct":22},"按设计图示尺寸以实际面积计算",{"key":27,"text":223,"correct":22},"扣除宽度不小于300mm的楼梯井",{"key":30,"text":225,"correct":22},"包含伸入墙内部分",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},894121,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于预制混凝土构件工程量计算，说法正确的是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":32},"预制组合屋架，按设计图示尺寸以体积计算，不扣除预埋铁件所占体积",{"key":24,"text":233,"correct":22},"预制网架板，按设计图示尺寸以体积计算，不扣除孔洞占体积",{"key":27,"text":235,"correct":22},"预制空心板，按设计图示尺寸以体积计算，不扣除空心板空洞所占体积",{"key":30,"text":237,"correct":22},"预制混凝土楼梯按设计图示尺寸以体积计算，不扣除空心踏步板空洞体积",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},894122,"已知某现浇钢筋混凝土梁长6400mm，截面为800×1200mm，设计用ф12mm箍筋，单位理论重量为0.888kg\u002Fm，单根箍筋两个弯钩增加长度共160mm，钢筋保护层厚为25mm，箍筋间距为200mm，则10根梁的箍筋工程量为（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"1.112t",{"key":24,"text":245,"correct":22},"1.117t",{"key":27,"text":247,"correct":32},"1.146t",{"key":30,"text":249,"correct":22},"1.193t",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},894123,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于金属结构工程工程量计算的说法，错误的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"不扣除孔眼、切边、切肢的质量，焊条、铆钉、螺栓等质量不另增加",{"key":24,"text":257,"correct":32},"钢管柱上牛腿的质量不增加",{"key":27,"text":259,"correct":22},"压型钢板墙板，按设计图示尺寸以铺挂面积计算",{"key":30,"text":261,"correct":22},"金属网栏按设计图示尺寸以面积计算",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},894124,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于金属结构工程量计算的说法，正确的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":32},"钢吊车梁工程量包括制动梁、制动桁架工程量",{"key":24,"text":269,"correct":22},"钢管柱按设计图示尺寸以质量计算，扣除加强环、内衬管工程量",{"key":27,"text":271,"correct":22},"空腹钢柱按设计图示尺寸以长度计算",{"key":30,"text":273,"correct":22},"实腹钢柱按图示尺寸的长度计算，牛腿和悬臂梁质量另计",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},894125,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于金属结构工程量计算，说法正确的是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"钢管柱牛腿工程量列入其他项目中",{"key":24,"text":281,"correct":32},"钢网架按设计图示尺寸以质量计算",{"key":27,"text":283,"correct":22},"金属结构工程量应扣除孔眼、切边质量",{"key":30,"text":285,"correct":22},"金属结构工程量应增加铆钉、螺栓质量",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},894126,"根据《建设工程工程量清单计价规范》（GB 50500－2013），门窗工程的工程量计算正确的是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"金属推拉窗按设计图示尺寸以窗净面积计算",{"key":24,"text":293,"correct":32},"金属窗套按设计图示尺寸以展开面积计算",{"key":27,"text":295,"correct":22},"铝合金窗帘盒按设计图示尺寸以展开面积计算",{"key":30,"text":297,"correct":22},"金属窗帘轨按设计图示数量计算",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":30,"analysis":33},894127,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于厂库房大门工程量计算，说法正确的是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"防护铁丝门按设计数量以质量计算",{"key":24,"text":305,"correct":22},"金属格栅门按设计图示门框以面积计算",{"key":27,"text":307,"correct":22},"钢制花饰大门按设计图示数量以质量计算",{"key":30,"text":309,"correct":32},"全钢板大门按设计图示洞口尺寸以面积计算",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},894128,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于金属窗工程量计算，说法正确的是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"彩板钢窗按设计图示尺寸以框外围展开面积计算",{"key":24,"text":317,"correct":32},"金属纱窗按框的外围尺寸以面积计算",{"key":27,"text":319,"correct":22},"金属百叶窗按框外围尺寸以面积计算",{"key":30,"text":321,"correct":22},"金属橱窗按设计图示洞口尺寸以面积计算",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":27,"analysis":33},894129,"根据《建设工程工程量清单计价规范》（GB 50500－2013），膜结构屋面的工程量应（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"按设计图示尺寸以斜面面积计算",{"key":24,"text":329,"correct":22},"按设计图示尺寸以长度计算",{"key":27,"text":331,"correct":32},"按设计图示尺寸以需要覆盖的水平面积计算",{"key":30,"text":333,"correct":22},"按设计图示尺寸以面积计算",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":27,"analysis":33},894130,"根据《建设工程工程量清单计价规范》（GB 50500－2013），屋面及防水工程中变形缝的工程量应（ ）。",[338,339,340,342],{"key":20,"text":333,"correct":22},{"key":24,"text":219,"correct":22},{"key":27,"text":341,"correct":32},"按设计图示以长度计算",{"key":30,"text":343,"correct":22},"不计算",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":27,"analysis":33},894131,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于屋面及防水工程工程量计算的说法，正确的是（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":22},"瓦屋面、型材屋面按设计图示尺寸以水平投影面积计算",{"key":24,"text":351,"correct":22},"屋面涂膜防水中，女儿墙的弯起部分不增加面积",{"key":27,"text":353,"correct":32},"屋面排水管按设计图示尺寸以长度计算",{"key":30,"text":355,"correct":22},"变形缝防水、防潮按面积计算",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":20,"analysis":33},894132,"根据《建设工程工程量清单计价规范》（GB 50500－2013），有关楼地面防水防潮工程量计算，说法正确的是（ ）。",[360,361,363,365],{"key":20,"text":333,"correct":32},{"key":24,"text":362,"correct":22},"按主墙间净面积计算，搭接和反边部分不计",{"key":27,"text":364,"correct":22},"反边高度≤300mm部分不计算",{"key":30,"text":366,"correct":22},"反边高度＞300mm部分计入楼地面防水",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":30,"analysis":33},894133,"根据《建设工程工程量清单计价规范》（GB 50500－2013），防腐、隔热、保温工程中保温隔热墙面的工程量应（ ）。",[371,372,374,376],{"key":20,"text":219,"correct":22},{"key":24,"text":373,"correct":22},"按设计图示以墙体中心线长度计算",{"key":27,"text":375,"correct":22},"按设计图示以墙体高度计算",{"key":30,"text":333,"correct":32},{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":30,"analysis":33},894134,"根据《建设工程工程量清单计价规范》（GB 50500－2013），有关防腐工程量计算，说法正确的是（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"隔离层平面防腐，门洞开口部分按图示面积计入",{"key":24,"text":384,"correct":22},"隔离层立面防腐，门洞口侧壁部分不计算",{"key":27,"text":386,"correct":22},"砌筑沥青浸渍砖，按图示水平投影面积计算",{"key":30,"text":388,"correct":32},"立面防腐涂料，门洞侧壁按展开面积并入墙面积内",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},894135,"根据《建设工程工程量清单计价规范》（GB 50500－2013），有关保温、隔热工程量计算，说法正确的是（ ）。",[393,395,397,399],{"key":20,"text":394,"correct":32},"与天棚相连的梁的保温工程量并入天棚工程量",{"key":24,"text":396,"correct":22},"与墙相连的柱的保温工程量按柱工程量计算",{"key":27,"text":398,"correct":22},"门窗洞口侧壁的保温工程量不计",{"key":30,"text":400,"correct":22},"梁保温工程量按设计图示尺寸以梁的中心线长度计算",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":30,"analysis":33},894136,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于楼梯梯面装饰工程量计算的说法，正确的是（ ）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"按设计图示尺寸以楼梯（不含楼梯井）水平投影面积计算",{"key":24,"text":408,"correct":22},"按设计图示尺寸以楼梯梯段斜面积计算",{"key":27,"text":410,"correct":22},"楼梯与楼地面连接时，算至梯口梁外侧边沿",{"key":30,"text":412,"correct":32},"无梯口梁者，算至最上一层踏步边沿加300mm",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":30,"analysis":33},894137,"根据《建设工程工程量清单计价规范》（GB 50500－2013），楼地面装饰装修工程的工程量计算，正确的是（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":22},"水泥砂浆楼地面整体面层按设计图示尺寸以面积计算，不扣除设备基础和室内地沟所占面积",{"key":24,"text":420,"correct":22},"石材楼地面按设计图示尺寸以面积计算，不考虑门洞开口部分所占面积",{"key":27,"text":422,"correct":22},"金属复合地板按设计图示尺寸以面积计算，门洞、空圈部分所占面积不另增加",{"key":30,"text":424,"correct":32},"水泥砂浆楼梯面按设计图示尺寸以楼梯（包括踏步、休息平台及500mm以内的楼梯井）水平投影面积计算",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":27,"analysis":33},894138,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于装饰装修工程量计算的说法，正确的是（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":22},"石材墙面按图示尺寸以面积计算",{"key":24,"text":432,"correct":22},"墙面装饰抹灰工程量应扣除踢脚线所占面积",{"key":27,"text":434,"correct":32},"干挂石材钢骨架按设计图示尺寸以质量计算",{"key":30,"text":436,"correct":22},"装饰板墙面按设计图示面积计算，不扣除门窗洞口所占面积",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":27,"analysis":33},894139,"根据《建设工程工程量清单计价规范》（GB 50500－2013），天棚抹灰工程量计算正确的是（ ）。",[441,442,443,444],{"key":20,"text":25,"correct":22},{"key":24,"text":28,"correct":22},{"key":27,"text":31,"correct":32},{"key":30,"text":21,"correct":22},{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":20,"analysis":33},894140,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于天棚装饰工程量计算，说法正确的是（ ）。",[449,451,453,455],{"key":20,"text":450,"correct":32},"灯带（槽）按设计图示尺寸以框外围面积计算",{"key":24,"text":452,"correct":22},"灯带（槽）按设计图示尺寸以延长米计算",{"key":27,"text":454,"correct":22},"送风口按设计图示尺寸以结构内边线面积计算",{"key":30,"text":456,"correct":22},"回风口按设计图示尺寸以面积计算",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":30,"analysis":33},894141,"根据《建设工程工程量清单计价规范》（GB 50500－2013），按面积计算油漆、涂料工程量的是（ ）。",[461,463,465,467],{"key":20,"text":462,"correct":22},"封檐板油漆",{"key":24,"text":464,"correct":22},"窗帘盒油漆",{"key":27,"text":466,"correct":22},"木扶手油漆",{"key":30,"text":468,"correct":32},"金属面油漆",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":27,"analysis":33},894142,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）规定，关于土方的项目列项或工程量计算正确的为（）。",[473,474,475,476],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":22},{"key":27,"text":79,"correct":32},{"key":30,"text":477,"correct":22},"冻土开挖工程量需按夯实后体积计算",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":20,"analysis":33},894143,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013）规定，关于砌块墙高度计算正确的为（）。",[482,484,485,486],{"key":20,"text":483,"correct":32},"有屋架且室内外均有天棚者算至屋架下弦底另加200mm",{"key":24,"text":161,"correct":22},{"key":27,"text":163,"correct":22},{"key":30,"text":165,"correct":22},{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":27,"analysis":33},894144,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），现浇混凝土墙工程量应（）。",[491,493,495,497],{"key":20,"text":492,"correct":22},"扣除突出墙面部分体积",{"key":24,"text":494,"correct":22},"不扣除面积为0.33m2孔洞体积",{"key":27,"text":496,"correct":32},"将伸入墙内的梁头计入",{"key":30,"text":498,"correct":22},"扣除预埋铁件体积",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":24,"analysis":33},894145,"根据《房屋建筑与装饰工程工程量计算规范》GB 50854-2013，现浇混凝土墙按设计尺寸以体积计算，下列工程量计算规则错误的是（）。",[503,505,507,509],{"key":20,"text":504,"correct":22},"不扣除构件内预埋铁件所占体积",{"key":24,"text":506,"correct":32},"扣除门窗洞口及单个面积0.3m2以内的孔洞所占体积",{"key":27,"text":508,"correct":22},"墙垛及突出墙面部分并入墙体体积内",{"key":30,"text":510,"correct":22},"当梁与混凝土墙连接时，梁的长度应计算到混凝土墙的侧面",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":24,"analysis":33},894146,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），现浇钢筋混凝土楼梯的工程量应按设计图示尺寸（）。",[515,517,519,521],{"key":20,"text":516,"correct":22},"以体积计算，扣除宽度小于500mm的楼梯井",{"key":24,"text":518,"correct":32},"以水平投影面积计算，不扣除宽度小于500mm的楼梯井",{"key":27,"text":520,"correct":22},"以水平投影面积计算，伸入墙内部分并入楼梯内计算",{"key":30,"text":522,"correct":22},"当整体楼梯与现浇楼板无连接梁时，以分界线为界",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":30,"analysis":33},894147,"根据《房屋建筑与装饰工程工程量计算规范》GB 50854-2013，有关防腐、隔热和保温工程的工程量计算规则，正确的计算方法是（）。",[527,529,531,533],{"key":20,"text":528,"correct":22},"保温隔热屋面按设计图示尺寸以面积计算，不扣除大于0.3m2孔洞所占面积",{"key":24,"text":530,"correct":22},"柱帽保温隔热应并入保温柱工程量内",{"key":27,"text":532,"correct":22},"防腐混凝土面层按设计图示尺寸以体积计算",{"key":30,"text":534,"correct":32},"隔离层立面防腐中，砖垛突出部分按展开面积并入墙面积内",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":24,"analysis":33},894148,"对某建筑地基设计要求强夯处理，处理范围为 40.0×56.0m，需要铺设 400mm厚土工合成材料，并进行机械压实，根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013）规定，正确的项目列项或工程量计算是（）。",[539,541,543,545],{"key":20,"text":540,"correct":22},"铺设土工合成材料的工程量为896m3",{"key":24,"text":542,"correct":32},"铺设土工合成材料的工程量为2240m2",{"key":27,"text":544,"correct":22},"强夯地基工程量按一般土方项目列项",{"key":30,"text":546,"correct":22},"强夯地基工程量为896m2",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},894149,"根据《房屋建筑与装修工程工程量清单计算规范》，混凝土及钢筋混凝土工程量计算，正确的是（）。",[551,553,555,557],{"key":20,"text":552,"correct":32},"现浇有梁板主梁、次梁按体积并入楼板工程量中计算",{"key":24,"text":554,"correct":22},"无梁板柱帽按体积并入零星项目工程量中计算",{"key":27,"text":556,"correct":22},"弧形楼梯不扣除宽度小于600mm的楼梯井",{"key":30,"text":558,"correct":22},"整体楼梯按水平投影面积计算，不包括与楼板连接的梯梁所占面积",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":30,"analysis":33},894150,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013）规定，关于钢筋保护层或工程量计算错误的为（）。",[563,565,567,569],{"key":20,"text":564,"correct":22},"Φ20mm钢筋一个半圆弯钩的增加长度为125mm",{"key":24,"text":566,"correct":22},"Φ20mm钢筋弯起45°，弯起高度为450mm，一侧弯起增加的长度为186.3mm",{"key":27,"text":568,"correct":22},"通常情况下混凝土梁的钢筋保护层厚度不小于20mm",{"key":30,"text":570,"correct":32},"箍筋根数=箍筋分布长度\u002F箍筋间距",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":27,"analysis":33},894151,"编制房屋建筑工程施工招标的工程量清单，对第一项现浇混凝土无梁板的清单项目应编码为（）。",[575,577,579,581],{"key":20,"text":576,"correct":22},"010503002001",{"key":24,"text":578,"correct":22},"010405001001",{"key":27,"text":580,"correct":32},"010505002001",{"key":30,"text":582,"correct":22},"010506002001",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":27,"analysis":33},894152,"采用工程量清单计价方式招标时，对工程量清单的完整性和准确性负责的是（）",[587,589,591,593],{"key":20,"text":588,"correct":22},"编制招标文件的招标代理人",{"key":24,"text":590,"correct":22},"编制清单的工程造价咨询人",{"key":27,"text":592,"correct":32},"发布招标文件的招标人",{"key":30,"text":594,"correct":22},"确定中标的投标人",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":27,"analysis":33},894153,"编制房屋建筑工程施工招投标的工程量清单，第 3个单位工程的实心砖墙的项目编码为（）。",[599,601,603,605],{"key":20,"text":600,"correct":22},"010503002003",{"key":24,"text":602,"correct":22},"010403003003",{"key":27,"text":604,"correct":32},"010401003003",{"key":30,"text":606,"correct":22},"010503003003",[608,611,614,617,620,623],{"id":15,"name":609,"category":7,"favorite":610},"领导干部任职前廉政法规知识测试题",92,{"id":612,"name":613,"category":7,"favorite":15},595,"建筑结构与设备",{"id":615,"name":616,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":618,"name":619,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":621,"name":622,"category":7,"favorite":8},534,"BIM工程师",{"id":624,"name":622,"category":7,"favorite":8},535]