[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-580-19":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},580,"[土木建筑工程]建设工程计量与计价实务","建筑工程",0,19,50,1733,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,319,331,342,354,366,378,390,401,411,420,432,444,456,468,480,492,504,516,528,540,552,564,576,588,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},893902,1,"单选题","设置钢筋混凝土构造柱的砖墙砌体，施工时应（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","先砌墙后浇构造柱",true,{"key":24,"text":25,"correct":26},"B","从每层柱脚开始马牙槎先进后退",false,{"key":28,"text":29,"correct":26},"C","先浇构造柱后砌墙",{"key":31,"text":32,"correct":26},"D","构造柱浇筑和砌墙砌筑同时进行","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},893903,"填充墙与承重主体结构间的空隙部位施工，应在填充墙砌筑（）天后进行。",[38,40,42,44],{"key":20,"text":39,"correct":26},"7",{"key":24,"text":41,"correct":22},"14",{"key":28,"text":43,"correct":26},"21",{"key":31,"text":45,"correct":26},"28",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},893904,"在直接承受动力荷载的钢筋混凝土构件中，纵向受力钢筋的连接方式不宜采用（）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"钢筋套筒挤压连接连接",{"key":24,"text":53,"correct":26},"钢筋螺纹套管连接",{"key":28,"text":55,"correct":26},"机械连接",{"key":31,"text":57,"correct":22},"闪光对焊连接",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},893905,"工程施工中用得最多的一种模板是（）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"木模板",{"key":24,"text":65,"correct":26},"大模板",{"key":28,"text":67,"correct":22},"组合模板",{"key":31,"text":69,"correct":26},"永久式模板",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},893906,"对长度不小于（）的钢筋混凝土梁、板，其模板应要求起拱。",[74,76,78,80],{"key":20,"text":75,"correct":26},"3m",{"key":24,"text":77,"correct":22},"4m",{"key":28,"text":79,"correct":26},"5m",{"key":31,"text":81,"correct":26},"6m",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},893907,"现浇结构楼板的底模和支架拆除时，当设计无要求时，对跨度为 6m的梁，混凝土强度达到（）时方可拆除。",[86,88,90,92],{"key":20,"text":87,"correct":26},"50%",{"key":24,"text":89,"correct":26},"70%",{"key":28,"text":91,"correct":22},"75%",{"key":31,"text":93,"correct":26},"100%",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},893908,"对混凝土采用自然养护时，应在浇筑完毕后的（）以内对混凝土加以覆盖并保湿养护。",[98,100,102,104],{"key":20,"text":99,"correct":26},"6小时",{"key":24,"text":101,"correct":22},"12小时",{"key":28,"text":103,"correct":26},"18小时",{"key":31,"text":105,"correct":26},"24小时",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},893909,"混凝土冬季施工时，应注意（）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"不宜采用普通硅酸盐水泥",{"key":24,"text":113,"correct":26},"适当增加水灰比",{"key":28,"text":115,"correct":26},"适当添加缓凝剂",{"key":31,"text":117,"correct":22},"适当添加引气剂",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},893910,"用于预制构件厂生产定型的中小型构件宜采用（）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"后张法",{"key":24,"text":125,"correct":22},"先张法",{"key":28,"text":127,"correct":26},"张拉机具法",{"key":31,"text":129,"correct":26},"卷扬机法",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},893911,"先张法预应力混凝土构件施工，其工艺流程为（）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"支底模-支侧模-张拉钢筋-浇筑混凝土-养护、拆模-放张钢筋",{"key":24,"text":137,"correct":26},"支底模-张拉钢筋-支侧模-浇筑混凝土-放张钢筋-养护、拆模",{"key":28,"text":139,"correct":22},"支底模-预应力钢筋安放-张拉钢筋-支侧模-浇混凝土-拆模-放张钢筋",{"key":31,"text":141,"correct":26},"支底模-钢筋安放-支侧模-张拉钢筋-浇筑混凝土-放张钢筋-拆模",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},893912,"先张法预应力钢筋混凝土的施工，在放松预应力钢筋时，要求混凝土的强度不低于设计强度等级的（），且不低于（）MPa。",[146,148,150,152],{"key":20,"text":147,"correct":22},"75%，30",{"key":24,"text":149,"correct":26},"80%，25",{"key":28,"text":151,"correct":26},"85%，20",{"key":31,"text":153,"correct":26},"100%，40",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},893913,"有关卷材防水屋面施工，下列说法错误的是（）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"平行于屋脊的搭接缝应顺流水方向搭接",{"key":24,"text":161,"correct":26},"应从屋面最低处向上铺",{"key":28,"text":163,"correct":22},"搭接缝宜留在沟底，不宜留在天沟侧面",{"key":31,"text":165,"correct":26},"上下两层卷材不能互相垂直铺贴",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},893914,"一般路基土方施工时，可优先选作填料的是（）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"亚砂土",{"key":24,"text":173,"correct":26},"粉性土",{"key":28,"text":175,"correct":26},"黏性土",{"key":31,"text":177,"correct":22},"粗砂",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},893915,"城市建筑的基础工程，采用地下连续墙施工的主要优点在于（）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"开挖基坑的土方外运方便",{"key":24,"text":185,"correct":26},"墙段之间接头质量易控制，施工方便",{"key":28,"text":187,"correct":26},"施工技术简单，便于管理",{"key":31,"text":189,"correct":22},"施工振动小，周边干扰小",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},893916,"泥浆最主要的作用是（）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"携沙",{"key":24,"text":197,"correct":22},"护壁",{"key":28,"text":199,"correct":26},"冷却",{"key":31,"text":201,"correct":26},"润滑",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},893917,"挖槽结束后，需要清除槽底沉淀物，我国多采用（）进行清底。",[206,208,210,212],{"key":20,"text":207,"correct":26},"正循化法",{"key":24,"text":209,"correct":26},"反循环法",{"key":28,"text":211,"correct":26},"沉淀法",{"key":31,"text":213,"correct":22},"置换法",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},893918,"浅基坑的开挖深度一般（）。",[218,220,222,224],{"key":20,"text":219,"correct":26},"小于3m",{"key":24,"text":221,"correct":26},"小于4m",{"key":28,"text":223,"correct":22},"小于5m",{"key":31,"text":225,"correct":26},"不大于6m",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},893919,"关于土石方填筑正确的意见是（）。",[230,232,234,236],{"key":20,"text":231,"correct":26},"不宜采用同类土填筑",{"key":24,"text":233,"correct":22},"从上至下填筑土层的透水性应从小到大",{"key":28,"text":235,"correct":26},"含水量大的黏土宜填筑在下层",{"key":31,"text":237,"correct":26},"硫酸盐含量小于5%的土不能使用",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},893920,"在松散土体中开挖6m深的沟槽，支护方式应优先采用（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":26},"间断式水平挡土板横撑式支撑",{"key":24,"text":245,"correct":26},"连续式水平挡土板横撑式支撑",{"key":28,"text":247,"correct":22},"垂直挡土板式支撑",{"key":31,"text":249,"correct":26},"重力式支护结构支撑",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},893921,"在基坑开挖过程中，明排水法的集水坑应设置在（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":26},"基础范围以内",{"key":24,"text":257,"correct":22},"地下水走向的上游",{"key":28,"text":259,"correct":26},"基础附近",{"key":31,"text":261,"correct":26},"地下水走向的下游",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":28,"analysis":33},893922,"采用明排水法开挖基坑，在基坑开挖过程中设置的集水坑应（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":26},"布置在基础范围以内",{"key":24,"text":269,"correct":26},"布置在基坑底部中央",{"key":28,"text":271,"correct":22},"布置在地下水走向的上游",{"key":31,"text":273,"correct":26},"经常低于挖土面1.0m以上",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},893923,"推土机的经济运距为（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":26},"30～60m",{"key":24,"text":281,"correct":22},"100m以内",{"key":28,"text":283,"correct":26},"200～350m",{"key":31,"text":285,"correct":26},"1500m以内",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},893924,"对大面积二类土场地进行平整的主要施工机械应优先考虑（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":26},"拉铲挖掘机",{"key":24,"text":293,"correct":22},"铲运机",{"key":28,"text":295,"correct":26},"正铲挖掘机",{"key":31,"text":297,"correct":26},"反铲挖掘机",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},893925,"关于地基夯实加固处理成功的经验是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":26},"沙土、杂填土和软黏土层适宜采用重锤夯实",{"key":24,"text":305,"correct":26},"地下水距地面0.8m以上的湿陷性黄土不宜采用重锤夯实",{"key":28,"text":307,"correct":26},"碎石土、砂土、粉土不宜采用强夯法",{"key":31,"text":309,"correct":22},"工业废渣、垃圾地基适宜采用强夯法",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},893926,"钢筋混凝土预制桩起吊时，混凝土强度应至少达到设计强度的（ ）。",[314,316,317,318],{"key":20,"text":315,"correct":26},"30%",{"key":24,"text":87,"correct":26},{"key":28,"text":89,"correct":22},{"key":31,"text":93,"correct":26},{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":31,"analysis":33},893927,"关于钢筋混凝土预制桩加工制作，说法正确的是（ ）。",[323,325,327,329],{"key":20,"text":324,"correct":26},"长度在10m以上的桩必须工厂预制",{"key":24,"text":326,"correct":26},"现场预制桩不采用重叠法制作",{"key":28,"text":328,"correct":26},"桩的强度达到设计强度的70%方可运输",{"key":31,"text":330,"correct":22},"桩的强度达到设计强度的70%方可起吊",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":20,"analysis":33},893928,"在钢筋混凝土预制桩打桩施工中，仅适用于软弱土层的接桩方法是（ ）。",[335,337,339,341],{"key":20,"text":336,"correct":22},"硫磺胶泥锚接",{"key":24,"text":338,"correct":26},"焊接连接",{"key":28,"text":340,"correct":26},"法兰连接",{"key":31,"text":55,"correct":26},{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},893929,"混凝土泥浆护壁成孔灌注桩施工时，应将（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":26},"桩孔内废浆、废渣清理干净，且待桩孔干燥后下放钢筋笼",{"key":24,"text":349,"correct":22},"混凝土导管缓慢拔起，确保混凝土正常灌注",{"key":28,"text":351,"correct":26},"泥浆与混凝土充分拌合确保桩体质量",{"key":31,"text":353,"correct":26},"泥浆护壁成孔灌注桩施工对环境无污染",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":24,"analysis":33},893930,"爆扩成孔灌注桩的主要优点在于（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":26},"适于在软土中形成桩基础",{"key":24,"text":361,"correct":22},"扩大桩底支撑面",{"key":28,"text":363,"correct":26},"增大桩身周边土体的密实度",{"key":31,"text":365,"correct":26},"有效扩大桩柱直径",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":31,"analysis":33},893931,"关于钢筋混凝土构造柱的说法，正确的是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":26},"应按先浇柱后砌墙的施工顺序进行",{"key":24,"text":373,"correct":26},"构造柱与墙体连接处应砌马牙搓，从每层柱脚开始，先进后退",{"key":28,"text":375,"correct":26},"沿墙高每500mm设2φ6拉结钢筋，每边伸入墙内不宜小于500mm",{"key":31,"text":377,"correct":22},"构造柱拉结钢筋不得任意弯折",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},893932,"墙体为构造柱砌成的马牙槎，其凹凸尺寸和高度可约为（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":26},"60mm和345mm",{"key":24,"text":385,"correct":22},"60mm和260mm",{"key":28,"text":387,"correct":26},"70mm和385mm",{"key":31,"text":389,"correct":26},"90mm和385mm",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":31,"analysis":33},893933,"在直接承受动力荷载的钢筋混凝土构件中，纵向受力钢筋的连接方式不宜采用（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":26},"套筒挤压连接",{"key":24,"text":397,"correct":26},"钢筋直螺纹套管连接",{"key":28,"text":399,"correct":26},"钢筋锥螺纹套管连接",{"key":31,"text":57,"correct":22},{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":28,"analysis":33},893934,"在剪力墙体系和筒体体系高层建筑的钢筋混凝土结构施工时，高效、安全、一次性投资少的模板形式应为（ ）。",[405,406,407,409],{"key":20,"text":67,"correct":26},{"key":24,"text":65,"correct":26},{"key":28,"text":408,"correct":22},"爬升模板",{"key":31,"text":410,"correct":26},"台模",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":24,"analysis":33},893935,"主要用于浇筑平板式楼板或带边梁楼板的工具式模板为（ ）。",[415,416,417,419],{"key":20,"text":65,"correct":26},{"key":24,"text":410,"correct":22},{"key":28,"text":418,"correct":26},"隧道模板",{"key":31,"text":69,"correct":26},{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":28,"analysis":33},893936,"下图所示的大体积混凝土浇筑方式为（ ）。",[424,426,428,430],{"key":20,"text":425,"correct":26},"全面分层方案",{"key":24,"text":427,"correct":26},"分段分层方案",{"key":28,"text":429,"correct":22},"斜面分层方案",{"key":31,"text":431,"correct":26},"断面分层方案",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":24,"analysis":33},893937,"入模后的混凝土拌合物应用振动器振动捣实，下图所示的振捣器中，属于外部振捣器的为（ ）。",[436,438,440,442],{"key":20,"text":437,"correct":26},"a",{"key":24,"text":439,"correct":22},"b",{"key":28,"text":441,"correct":26},"c",{"key":31,"text":443,"correct":26},"d",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":20,"analysis":33},893938,"混凝土高温期施工时，应注意（ ）。",[448,450,452,454],{"key":20,"text":449,"correct":22},"采用粉煤灰取代部分水泥",{"key":24,"text":451,"correct":26},"适当增加水泥用量",{"key":28,"text":453,"correct":26},"坍落度不宜小于50mm",{"key":31,"text":455,"correct":26},"入模温度不应低于35°",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":24,"analysis":33},893939,"对先张法预应力钢筋混凝土构件进行了湿热养护，采取合理养护制度的主要目的是（ ）。",[460,462,464,466],{"key":20,"text":461,"correct":26},"提高混凝土强度",{"key":24,"text":463,"correct":22},"减少由于温差引起的预应力损失",{"key":28,"text":465,"correct":26},"增加混凝土的收缩和徐变",{"key":31,"text":467,"correct":26},"增大混凝土与钢筋的共同作用",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":24,"analysis":33},893940,"预应力混凝土构件先张法施工工艺流程正确的为（ ）。",[472,474,476,478],{"key":20,"text":473,"correct":26},"安骨架、钢筋－张拉－安底、侧模－浇灌－养护－拆模－放张",{"key":24,"text":475,"correct":22},"安底模、骨架、钢筋－张拉－支侧模－浇灌－养护－拆模－放张",{"key":28,"text":477,"correct":26},"安骨架－安钢筋－安底、侧模－浇灌－张拉－养护－放张－拆模",{"key":31,"text":479,"correct":26},"安底模、侧模－安钢筋－张拉－浇灌－养护－放张－拆模",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":31,"analysis":33},893941,"在单层工业厂房结构吊装中，如安装支座表面高度为15.0m（从停机面算起），绑扎点至所吊构件底面距离0.8m，索具高度为3.0m，则起重机起重高度至少为（ ）。",[484,486,488,490],{"key":20,"text":485,"correct":26},"18.2m",{"key":24,"text":487,"correct":26},"18.5m",{"key":28,"text":489,"correct":26},"18.8m",{"key":31,"text":491,"correct":22},"19.1m",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":24,"analysis":33},893942,"单层钢结构厂房在安装前需要进行吊装稳定性验算的钢结构件是（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":26},"钢柱",{"key":24,"text":499,"correct":22},"钢屋架",{"key":28,"text":501,"correct":26},"吊车梁",{"key":31,"text":503,"correct":26},"钢桁架",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":28,"analysis":33},893943,"钢结构单层厂房的吊车梁安装选用较多的起重机械是（ ）。",[508,510,512,514],{"key":20,"text":509,"correct":26},"拔杆",{"key":24,"text":511,"correct":26},"桅杆式起重机",{"key":28,"text":513,"correct":22},"履带式起重机",{"key":31,"text":515,"correct":26},"塔式起重机",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":24,"analysis":33},893944,"对于大跨度的焊接球节点钢管网架的吊装，出于防火等考虑，一般选用（ ）。",[520,522,524,526],{"key":20,"text":521,"correct":26},"大跨度结构高空拼装法施工",{"key":24,"text":523,"correct":22},"大跨度结构整体吊装法施工",{"key":28,"text":525,"correct":26},"大跨度结构整体顶升法施工",{"key":31,"text":527,"correct":26},"大跨度结构滑移法施工",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":20,"analysis":33},893945,"屋面防水工程应满足的要求是（ ）。",[532,534,536,538],{"key":20,"text":533,"correct":22},"结构找坡不应小于3%",{"key":24,"text":535,"correct":26},"找平层初凝前压实抹平，不应留设分格缝",{"key":28,"text":537,"correct":26},"分格缝不宜与排气道贯通",{"key":31,"text":539,"correct":26},"涂膜防水层的无纺布，上下胎体搭接缝不应错开",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":20,"analysis":33},893946,"关于桥梁墩台施工的说法，正确的是（ ）。",[544,546,548,550],{"key":20,"text":545,"correct":22},"简易活动脚手架适宜于25m以下的砌石墩台施工",{"key":24,"text":547,"correct":26},"当墩台高度超过30m时宜采用固定模板施工",{"key":28,"text":549,"correct":26},"墩台混凝土适宜采用强度等级较高的普通硅酸盐水泥",{"key":31,"text":551,"correct":26},"6m以下的墩台可采用悬吊脚手架施工",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":31,"analysis":33},893947,"大跨径桁式桥上部结构，通常采用的安装方法是（ ）。",[556,558,560,562],{"key":20,"text":557,"correct":26},"支架安装",{"key":24,"text":559,"correct":26},"无支架安装",{"key":28,"text":561,"correct":26},"转体安装",{"key":31,"text":563,"correct":22},"悬臂安装",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":24,"analysis":33},893948,"下列关于后张法预应力混凝土工程施工，说法正确的是（）。",[568,570,572,574],{"key":20,"text":569,"correct":26},"预应力的传递主要靠预应力筋两端的锚具，锚具可以重复使用",{"key":24,"text":571,"correct":22},"无黏结预应力混凝土施工不需要预留孔道和灌浆",{"key":28,"text":573,"correct":26},"多用于预制构件厂生产定型的中小型构件",{"key":31,"text":575,"correct":26},"张拉预应力筋时，设计无规定的，构件混凝土的强度不低于设计强度等级的70%",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":33},893949,"钢筋混凝土预制桩的运输和堆放应满足以下要求（）。",[580,582,584,586],{"key":20,"text":581,"correct":26},"混凝土强度达到设计强度的70%方可运输",{"key":24,"text":583,"correct":22},"混凝土强度达到设计强度的100%方可运输",{"key":28,"text":585,"correct":26},"堆放层数不宜超过10层",{"key":31,"text":587,"correct":26},"不同规格的桩按上小下大的原则堆放",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":24,"analysis":33},893950,"以下建筑中，属于居住建筑的是（ ）。",[592,594,596,598],{"key":20,"text":593,"correct":26},"水塔",{"key":24,"text":595,"correct":22},"公寓",{"key":28,"text":597,"correct":26},"图书馆",{"key":31,"text":599,"correct":26},"地下管沟",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":20,"analysis":33},893951,"供人们从事非生产性活动使用的建筑物称为（ ）。",[604,606,608,610],{"key":20,"text":605,"correct":22},"民用建筑",{"key":24,"text":607,"correct":26},"居住建筑",{"key":28,"text":609,"correct":26},"公共建筑",{"key":31,"text":611,"correct":26},"工业建筑",[613,616,619,622,625,628],{"id":15,"name":614,"category":7,"favorite":615},"领导干部任职前廉政法规知识测试题",92,{"id":617,"name":618,"category":7,"favorite":15},595,"建筑结构与设备",{"id":620,"name":621,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":623,"name":624,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":626,"name":627,"category":7,"favorite":8},534,"BIM工程师",{"id":629,"name":627,"category":7,"favorite":8},535]