[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-580-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},580,"[土木建筑工程]建设工程计量与计价实务","建筑工程",0,17,50,1733,[13,34,46,58,70,82,94,105,117,129,139,151,162,174,186,198,208,220,232,244,256,268,280,292,304,316,328,340,352,364,376,388,400,412,419,431,443,455,467,479,491,503,515,527,539,551,563,575,587,599],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},893791,1,"单选题","根据《建设工程工程最清单计价规范》（GB 50500—2013），关于投标报价的说法，错误的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","暂列金额应按照招标工程量清单中列出的金额填写，不得变动",false,{"key":24,"text":25,"correct":22},"B","专业工程暂估价必须按照招标工程量清单中列出的金额填写",{"key":27,"text":28,"correct":29},"C","计日工应按照招标文件中的数量和单价计算总费用",true,{"key":31,"text":32,"correct":22},"D","总承包服务费应按照招标人的要求和现场管理需要自主确定","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},893792,"投标过程中，若投标人发现招标工程量清单项目特征描述与施工图纸不符时，应以（ ）为准进行报价。",[38,40,42,44],{"key":20,"text":39,"correct":29},"招标工程量清单的项目特征",{"key":24,"text":41,"correct":22},"招标文件中的施工图纸说明",{"key":27,"text":43,"correct":22},"实际施工的项目特征",{"key":31,"text":45,"correct":22},"投标人按规范修正后的项目特征",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},893793,"关于投标报价时综合单价的确定，下列做法中正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":29},"以项目特征描述为依据确定综合单价",{"key":24,"text":53,"correct":22},"招标工程量清单特征描述与设计图纸不符时，应以设计图纸为准",{"key":27,"text":55,"correct":22},"应考虑招标文件规定范围（幅度）外的风险费用",{"key":31,"text":57,"correct":22},"消耗量指标的计算应以地区或行业定额为依据",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},893794,"招标工程量清单中某分部分项清单项目与某一计价定额子目的工作内容与计量规则一致，则确定该清单项目综合单价不可或缺的工作是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"计算工程内容的工程数量",{"key":24,"text":65,"correct":22},"计算工程内容的清单单位含量",{"key":27,"text":67,"correct":22},"计算措施项目的费用",{"key":31,"text":69,"correct":29},"计算管理费、利润和风险费用",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},893795,"关于投标报价，下列说法中正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"总价措施项目均由投标人自主报价",{"key":24,"text":77,"correct":22},"暂列金额依据招标工程量清单总说明，结合项目管理规划自主填报",{"key":27,"text":79,"correct":22},"暂估价依据询价情况填报",{"key":31,"text":81,"correct":29},"投标人对投标报价的任何优惠均应反映在相应清单项目的综合单价中",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},893796,"根据《建设工程工程量清单计价规范》（GB 50500—2013），下列费用项目中需纳入分部分项工程项目综合单价中的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":29},"工程设备估价",{"key":24,"text":89,"correct":22},"专业工程暂估价",{"key":27,"text":91,"correct":22},"暂列金额",{"key":31,"text":93,"correct":22},"计日工费",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},893797,"工程总承包人按照合同的约定对招标人依法单独发包的专业工程承包人提供了现场垂直运输设备，由此发生的费用属于（ ）。",[98,100,102,103],{"key":20,"text":99,"correct":22},"现场管理费",{"key":24,"text":101,"correct":22},"企业管理费",{"key":27,"text":91,"correct":22},{"key":31,"text":104,"correct":29},"总承包服务费",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":24,"analysis":33},893798,"根据《建设工程工程量清单计价规范》（GB 50500—2013），投标人认为最高投标限价编制不符合规范规定的，应在最高投标限价公布后（ ）d内提交书面申请。",[109,111,113,115],{"key":20,"text":110,"correct":22},"3",{"key":24,"text":112,"correct":29},"5",{"key":27,"text":114,"correct":22},"7",{"key":31,"text":116,"correct":22},"10",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},893799,"根据现行建筑安装工程费用项目组成的规定，下列费用项目中，属于施工机具使用费的是（ ）。",[121,123,125,127],{"key":20,"text":122,"correct":29},"仪器仪表使用费",{"key":24,"text":124,"correct":22},"施工机械财产保险费",{"key":27,"text":126,"correct":22},"大型机械进出场费",{"key":31,"text":128,"correct":22},"大型机械安拆费",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":24,"analysis":33},893800,"建筑材料的采购费、仓储费、工地保管费和仓储损耗费属于建筑安装工程费用中的（ ）。",[133,135,137,138],{"key":20,"text":134,"correct":22},"措施费",{"key":24,"text":136,"correct":29},"直接工程费",{"key":27,"text":101,"correct":22},{"key":31,"text":99,"correct":22},{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":24,"analysis":33},893801,"关于建筑安装工程费用中的规费，下列说法中正确的是（ ）。",[143,145,147,149],{"key":20,"text":144,"correct":22},"规费是指有县级及以上有关权力部门规定必须缴纳或计取的费用",{"key":24,"text":146,"correct":29},"规费包括工程排污费和住房公积金",{"key":27,"text":148,"correct":22},"投标人在投标报价时填写的规费可高于规定的标准",{"key":31,"text":150,"correct":22},"社会保险费中包括建筑安装工程费一切险的投保费用",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":27,"analysis":33},893802,"下列费用中，属于安装工程费中措施项目费的是（ ）。",[155,157,158,160],{"key":20,"text":156,"correct":22},"施工机具使用费",{"key":24,"text":91,"correct":22},{"key":27,"text":159,"correct":29},"工程定位复测费",{"key":31,"text":161,"correct":22},"工程排污费",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":27,"analysis":33},893803,"根据现行的建筑安装工程费用项目组成规定，下列关于施工企业管理费中工具用具使用费的说法正确的是（ ）",[166,168,170,172],{"key":20,"text":167,"correct":22},"指企业管理使用，而非施工生产使用的工具用具使用费",{"key":24,"text":169,"correct":22},"指企业施工生产使用，而非企业管理使用的工具用具使用费",{"key":27,"text":171,"correct":29},"采用一般计税方法时，工具用具使用费中的增值税进项税额可以抵扣",{"key":31,"text":173,"correct":22},"包括各类资产标准的工具用具的购置、维修和摊销费用",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},893804,"某施工企业投标报价时确定企业管理费率以人工费为基础计算，据统计资料，该施工企业生产工人年平均管理费为1.5万元，年有效施工天数为260d，人工单价为350元\u002Fd，人工费占分部分项工程费的比例为75%，则该企业的企业管理费费率应为（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":22},"12.15%",{"key":24,"text":181,"correct":29},"13.19%",{"key":27,"text":183,"correct":22},"16.67%",{"key":31,"text":185,"correct":22},"22.22%",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},893805,"以人工费和机械费合计为计算基础的企业管理费费率的计算公式是（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":22},"企业管理费费率（%）＝生产工人年平均管理费\u002F年有效施工天数×人工单价×人工费占直接费的比例（%）",{"key":24,"text":193,"correct":29},"企业管理费费率（%）＝生产工人年平均管理费\u002F年有效施工天数×（人工单价＋每一日机械使用费）×100%",{"key":27,"text":195,"correct":22},"企业管理费费率（%）＝生产工人年平均管理费\u002F年有效施工天数×人工单价×100%",{"key":31,"text":197,"correct":22},"企业管理费费率（%）＝生产工人年平均管理费\u002F年有效施工天数×（人工单价－每一日机械使用费）×100%",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":24,"analysis":33},893806,"下列关于规费的说法中正确的是（ ）。",[202,204,205,206],{"key":20,"text":203,"correct":22},"规费是指由县级及以上有关权力部门规定必须缴纳或计取的费用",{"key":24,"text":146,"correct":29},{"key":27,"text":148,"correct":22},{"key":31,"text":207,"correct":22},"社会保险费中包括建筑安装工程一切险的投保费用",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":20,"analysis":33},893807,"实物量法和定额单价法在编制施工图预算方面的主要区别在于（ ）。",[212,214,216,218],{"key":20,"text":213,"correct":29},"直接工程费计算过程",{"key":24,"text":215,"correct":22},"依据的定额",{"key":27,"text":217,"correct":22},"工程量的计算规则",{"key":31,"text":219,"correct":22},"确定利润的方法",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":20,"analysis":33},893808,"采用定额单价法编制施工图预算时，下列做法正确的是（ ）。",[224,226,228,230],{"key":20,"text":225,"correct":29},"若分项工程主要材料品种与预算单价规定材料不一致，需要按实际使用材料价格换算预算单价",{"key":24,"text":227,"correct":22},"因施工工艺条件与预算单价的不一致而致人工、机械的数量增加，只调价不调量",{"key":27,"text":229,"correct":22},"因施工工艺条件与预算单价的不一致而使人工、机械的数量减少，既调价也调量",{"key":31,"text":231,"correct":22},"对于定额项目基价中未包括的主材费用，应按造价管理机构发布的造价信息价补充进定额基价",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":31,"analysis":33},893809,"采用定额单价法计算工程费用时，若分项工程施工工艺条件与定额单价不一致而造成人工、机械的数量增减时，对定额的处理方法一般是（ ）。",[236,238,240,242],{"key":20,"text":237,"correct":22},"编制补充单价表",{"key":24,"text":239,"correct":22},"直接套用定额单价",{"key":27,"text":241,"correct":22},"按实际价格换算定额单价",{"key":31,"text":243,"correct":29},"调量不换价",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":27,"analysis":33},893810,"《2012 预算定额》共分为( )。",[248,250,252,254],{"key":20,"text":249,"correct":22},"五部分二十册",{"key":24,"text":251,"correct":22},"六部分二十册",{"key":27,"text":253,"correct":29},"七部分二十四册",{"key":31,"text":255,"correct":22},"八部分二十四册",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":27,"analysis":33},893811,"根据单项工程的一般划分原则，下列单项工程中属于辅助生产设施的是（ ）。",[260,262,264,266],{"key":20,"text":261,"correct":22},"废水处理站",{"key":24,"text":263,"correct":22},"水塔",{"key":27,"text":265,"correct":29},"机修车间",{"key":31,"text":267,"correct":22},"职工医院",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":27,"analysis":33},893812,"下列用工项目中，属于预算定额与劳动定额人工幅度差的是（ ）。",[272,274,276,278],{"key":20,"text":273,"correct":22},"机械土方工程配合用工",{"key":24,"text":275,"correct":22},"超过预算定额取定运距增加的运输用工C",{"key":27,"text":277,"correct":29},"班组操作地点转移用工",{"key":31,"text":279,"correct":22},"机械维修引起的停歇时间",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},893813,"下列工程中，属于概算指标编制对象的是（ ）。",[284,286,288,290],{"key":20,"text":285,"correct":22},"分项工程",{"key":24,"text":287,"correct":29},"单位工程",{"key":27,"text":289,"correct":22},"分部工程",{"key":31,"text":291,"correct":22},"整个建筑物",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":20,"analysis":33},893814,"实物量法编制施工图换算时，计算并符合工程量后紧接着进行的工作是（ ）。",[296,298,300,302],{"key":20,"text":297,"correct":29},"套用定额单价，计算人材机费用",{"key":24,"text":299,"correct":22},"套用定额，计算人材机消耗量",{"key":27,"text":301,"correct":22},"汇总人材机费用",{"key":31,"text":303,"correct":22},"计算管理费等其他各项费用",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":31,"analysis":33},893815,"关于概算指标的编制，下列说法中正确的是（ ）。",[308,310,312,314],{"key":20,"text":309,"correct":22},"概算指标分为建筑安装工程概算指标和设备工器具概算指标",{"key":24,"text":311,"correct":22},"综合概算指标的准确性高于单项概算指标",{"key":27,"text":313,"correct":22},"单项形式的概算指标对工程结构形式可不作说明",{"key":31,"text":315,"correct":29},"构筑物的概算指标以预算书确定的价值为准，不必进行建筑面积换算",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":31,"analysis":33},893816,"下列施工机械的停歇时间，不在预算定额机械幅度差中考虑的是（ ）。",[320,322,324,326],{"key":20,"text":321,"correct":22},"机械维修引起的停歇",{"key":24,"text":323,"correct":22},"工程质量检查引起的停歇",{"key":27,"text":325,"correct":22},"机械转移工作面引起的停歇",{"key":31,"text":327,"correct":29},"进行准备与结束工作时引起的停歇",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":31,"analysis":33},893817,"经现场观测，完成 10m3某分项工程需消耗某种材料 1.76m3，其中损耗量0.055m3，则该种材料的损耗率为（ ）。",[332,334,336,338],{"key":20,"text":333,"correct":22},"3.03%",{"key":24,"text":335,"correct":22},"3.13%",{"key":27,"text":337,"correct":22},"3.20%",{"key":31,"text":339,"correct":29},"3.23%",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":31,"analysis":33},893818,"下列材料损耗，应计入预算定额材料损耗量的是（ ）。",[344,346,348,350],{"key":20,"text":345,"correct":22},"场外运输损耗",{"key":24,"text":347,"correct":22},"工地仓储损耗",{"key":27,"text":349,"correct":22},"一般性检验鉴定损耗",{"key":31,"text":351,"correct":29},"施工加工损耗",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":27,"analysis":33},893819,"下列用时中，同时包含在劳动定额和预算定额人工消耗量中的是（ ）。",[356,358,360,362],{"key":20,"text":357,"correct":22},"隐蔽工程验收的影响时间",{"key":24,"text":359,"correct":22},"工序搭接发生的停歇时间",{"key":27,"text":361,"correct":29},"不可避免的中断时间",{"key":31,"text":363,"correct":22},"加工材料所需的时间",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":31,"analysis":33},893820,"完成某分部分项工程 1m3需基本用工 0.5 工日，超运距用工 0.05 工日，辅助用工 0.1 工日。如人工幅度差系数为 10%，则该工程预算定额人工工日消耗量为（ ）工日\u002F10m3。",[368,370,372,374],{"key":20,"text":369,"correct":22},"6.05",{"key":24,"text":371,"correct":22},"5.85",{"key":27,"text":373,"correct":22},"7.00",{"key":31,"text":375,"correct":29},"7.15",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":24,"analysis":33},893821,"采用实物量法编制施工图预算时，在按人工、材料、机械台班的市场价计算人、材、机费用之后，下一个步骤是（ ）。",[380,382,384,386],{"key":20,"text":381,"correct":22},"进行工料分析",{"key":24,"text":383,"correct":29},"计算管理费、利润等费用",{"key":27,"text":385,"correct":22},"计算工程量",{"key":31,"text":387,"correct":22},"编写编制说明",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":20,"analysis":33},893822,"概算定额与预算定额的差异主要表现在（ ）的不同。",[392,394,396,398],{"key":20,"text":393,"correct":29},"项目划分和综合扩大程度",{"key":24,"text":395,"correct":22},"主要工程内容",{"key":27,"text":397,"correct":22},"主要表达方式",{"key":31,"text":399,"correct":22},"基本使用方法",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":27,"analysis":33},893823,"施工过程中对隐蔽工程质量检查验收影响工人操作的时间，属于预算定额人工消耗量指标组成中的（ ）。",[404,406,408,410],{"key":20,"text":405,"correct":22},"基本用工",{"key":24,"text":407,"correct":22},"辅助用工",{"key":27,"text":409,"correct":29},"人工幅度差用工",{"key":31,"text":411,"correct":22},"超运距用工",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":414,"answer":31,"analysis":33},893824,[415,416,417,418],{"key":20,"text":345,"correct":22},{"key":24,"text":347,"correct":22},{"key":27,"text":349,"correct":22},{"key":31,"text":351,"correct":29},{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":20,"analysis":33},893825,"完成某预算定额项目单位工程量的基本用工为2.8工日，辅助用工为0.7工日，超运距用工为0.9工日，人工幅度差系数为10%，该定额的人工工日消耗量为（ ）。",[423,425,427,429],{"key":20,"text":424,"correct":29},"4.84",{"key":24,"text":426,"correct":22},"4.75",{"key":27,"text":428,"correct":22},"4.56",{"key":31,"text":430,"correct":22},"4.68",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":20,"analysis":33},893826,"预算定额是按照（ ）编制的。",[435,437,439,441],{"key":20,"text":436,"correct":29},"社会平均水平",{"key":24,"text":438,"correct":22},"社会先进水平",{"key":27,"text":440,"correct":22},"行业平均水平",{"key":31,"text":442,"correct":22},"社会平均先进水平",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":24,"analysis":33},893830,"某市属建筑公司收到某县城工程一笔 1000万元的进度款,已知营业税率为 3%,教育费附加为 3%，地方教育附加为 2%，市区、县城城市维护建设税率分别为 7%、5%，则该建筑公司为这笔进度款缴纳的建筑安装工程税金为（）万元",[447,449,451,453],{"key":20,"text":448,"correct":22},"33.60",{"key":24,"text":450,"correct":29},"33.00",{"key":27,"text":452,"correct":22},"34.77",{"key":31,"text":454,"correct":22},"34.13",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":20,"analysis":33},893831,"关于总承包服务费的支付，下列说法中正确的是（）。",[459,461,463,465],{"key":20,"text":460,"correct":29},"建设单位向总承包单位支付",{"key":24,"text":462,"correct":22},"分包单位向总承包单位支付",{"key":27,"text":464,"correct":22},"专业承包单位向总承包单位支付",{"key":31,"text":466,"correct":22},"专业承包单位向建设单位支付",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":31,"analysis":33},893832,"关于建筑安装工程费用中建筑业增值税的计算，下列说法中正确的是( )。",[471,473,475,477],{"key":20,"text":472,"correct":22},"当事人可以自主选择一般计税法或简易计税法计税",{"key":24,"text":474,"correct":22},"一般计税法、简易计税法中的建筑业增值税税率均为11％",{"key":27,"text":476,"correct":22},"采用简易计税法时，税前造价不包含增值税的进项税额",{"key":31,"text":478,"correct":29},"采用一般计税法时，税前造价不包含增值税的进项税额",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":27,"analysis":33},893833,"对于不能计算工程量的措施项目，当按施工方案计算措施费时，若无“计算基础”和“费率”数值，则（）。",[483,485,487,489],{"key":20,"text":484,"correct":22},"以定额计价为计算基础，以国家、行业、地区定额中相应的费率计算金额",{"key":24,"text":486,"correct":22},"以“定额人工费+定额机械费”为计算基础，以国家、行业、地区定额中相应费率计算金额",{"key":27,"text":488,"correct":29},"只填写“金额”数值，在备注中说明施工方案出处或计算方法",{"key":31,"text":490,"correct":22},"备注中说明中计算方法，补充填写“计算基础”和“费率”",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":24,"analysis":33},893834,"根据《建设工程工程量清单计价规范》（GB50500-2013），一般不作为安全文明施工费计算基础的是（）。",[495,497,499,501],{"key":20,"text":496,"correct":22},"定额人工费",{"key":24,"text":498,"correct":29},"定额人工费+定额材料费",{"key":27,"text":500,"correct":22},"定额人工费+定额施工机具使用费",{"key":31,"text":502,"correct":22},"定额人工费+定额材料费+定额施工机具使用费",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":27,"analysis":33},893835,"招标工程量清单的项目特征中通常不需描述的内容是（）。",[507,509,511,513],{"key":20,"text":508,"correct":22},"材料材质",{"key":24,"text":510,"correct":22},"结构部位",{"key":27,"text":512,"correct":29},"工程内容",{"key":31,"text":514,"correct":22},"规格尺寸",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":24,"analysis":33},893836,"BIM技术对工程造价管理的主要作用在于（）。",[519,521,523,525],{"key":20,"text":520,"correct":22},"工程量清单项目划分更合理",{"key":24,"text":522,"correct":29},"工程量计算更准确、高效",{"key":27,"text":524,"correct":22},"综合单价构成更合理",{"key":31,"text":526,"correct":22},"措施项目计算更可行",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":24,"analysis":33},893838,"根据《建设工程工程量清单计价规范》（GB 50500-2013），下列关于工程量清单项目编码的说法中，正确的是（）。",[531,533,535,537],{"key":20,"text":532,"correct":22},"第三级编码为分部工程顺序码，由三位数字表示",{"key":24,"text":534,"correct":29},"第五级编码应根据拟建工程的工程量清单项目名称设置，不得重码",{"key":27,"text":536,"correct":22},"同一标段含有多个单位工程，不同单位工程中项目特征相同的工程应采用相同编码",{"key":31,"text":538,"correct":22},"补充项目编码以加上计量规范代码后跟三位数字表示",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":24,"analysis":33},893839,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），关于抹灰工程量说法正确的是（）。",[543,545,547,549],{"key":20,"text":544,"correct":22},"墙面抹灰工程量应扣除墙与构件交接处面积",{"key":24,"text":546,"correct":29},"有墙裙的内墙抹灰按主墙间净长乘以墙裙顶至天棚底高度以面积计算",{"key":27,"text":548,"correct":22},"内墙裙抹灰不单独计算",{"key":31,"text":550,"correct":22},"外墙抹灰按外墙展开面积计算",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":24,"analysis":33},893840,"招标工程清单是招标文件的组成部分，其准确性由（）负责。",[555,557,559,561],{"key":20,"text":556,"correct":22},"招标代理机构",{"key":24,"text":558,"correct":29},"招标人",{"key":27,"text":560,"correct":22},"编制工程量清单的造价咨询机构",{"key":31,"text":562,"correct":22},"招标工程量清单的编制人",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":20,"analysis":33},893841,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），关于涂料工程量的计算，说法正确的是（）。",[567,569,571,573],{"key":20,"text":568,"correct":29},"木材构件喷刷防火涂料按设计图示以面积计算",{"key":24,"text":570,"correct":22},"金属构件刷防火涂料按构件单面外围面积计算",{"key":27,"text":572,"correct":22},"金属构件刷防火涂料按设计图示尺寸以体积计算",{"key":31,"text":574,"correct":22},"线条刷涂料按设计展开面积计算",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":31,"analysis":33},893842,"根据《房屋建筑与装饰工程工程量计算规范》（GB58054-2013），天棚抹灰工程量计算正确的是（）。",[579,581,583,585],{"key":20,"text":580,"correct":22},"扣除检查口和管道所占面积",{"key":24,"text":582,"correct":22},"板式楼梯底面抹灰按水平投影面积计算",{"key":27,"text":584,"correct":22},"扣除间壁墙、垛和柱所占面积",{"key":31,"text":586,"correct":29},"锯齿形楼梯底板抹灰按展开面积计算",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":27,"analysis":33},893843,"编制房屋建筑工程施工招标的工程量清单，对第一项现浇混凝土无梁板的清单项目应编码为（ ）。",[591,593,595,597],{"key":20,"text":592,"correct":22},"010503002001",{"key":24,"text":594,"correct":22},"010405001001",{"key":27,"text":596,"correct":29},"010505002001",{"key":31,"text":598,"correct":22},"010506002001",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":31,"analysis":33},893846,"用工料单价法计算建筑安装工程费时需套用定额预算单价，下列做法正确的是（）。",[603,605,607,609],{"key":20,"text":604,"correct":22},"分项工程名称与定额名称完全一致时，直接套用定额预算单价",{"key":24,"text":606,"correct":22},"分项工程计量单位与定额计量单位完全一致时，直接套用定额预算单价",{"key":27,"text":608,"correct":22},"分项工程主要材料品种与预算定额不一致时，直接套用定额预算单价",{"key":31,"text":610,"correct":29},"分项工程施工工艺条件与预算定额不一致时，一般调量不调价",[612,615,618,621,624,627],{"id":15,"name":613,"category":7,"favorite":614},"领导干部任职前廉政法规知识测试题",92,{"id":616,"name":617,"category":7,"favorite":15},595,"建筑结构与设备",{"id":619,"name":620,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":622,"name":623,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":625,"name":626,"category":7,"favorite":8},534,"BIM工程师",{"id":628,"name":626,"category":7,"favorite":8},535]