[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-580-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":608},{"id":5,"name":6,"category":7,"favorite":8},580,"[土木建筑工程]建设工程计量与计价实务","建筑工程",0,16,50,1733,[13,34,46,58,70,82,94,102,114,126,138,150,162,174,186,198,210,222,232,244,256,268,280,290,302,314,326,338,350,362,374,386,398,410,422,434,446,458,466,478,490,502,514,526,538,550,562,574,586,598],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},893736,1,"单选题","编制某分项工程预算定额人工工日消耗量时，已知基本用工，辅助用工、超运距用工分别为 20工日、2工日、3工日，人工幅度差系数为10%。则该分项工程单位人工工日消耗量为（）工日。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","27.0",false,{"key":24,"text":25,"correct":22},"B","27.2",{"key":27,"text":28,"correct":22},"C","27.3",{"key":30,"text":31,"correct":32},"D","27.5",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},893737,"在计算预算定额人工工日消耗量时，包含在人工幅度差内的用工是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"超运距用工",{"key":24,"text":41,"correct":22},"材料加工用工",{"key":27,"text":43,"correct":22},"机械土方工程的配合用工",{"key":30,"text":45,"correct":32},"工种交叉作业相互影响的停歇用工",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},893738,"下列施工机械的停歇时间，不在预算定额机械幅度差中考虑的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"机械维修引起的停歇",{"key":24,"text":53,"correct":22},"工程质量检查引起的停歇",{"key":27,"text":55,"correct":22},"机械转移工作面引起的停歇",{"key":30,"text":57,"correct":32},"进行准备与结束工作时引起的停歇",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},893742,"建设项目竣工决算包括的范围是（）",[62,64,66,68],{"key":20,"text":63,"correct":32},"竣工建设项目全部建设费用",{"key":24,"text":65,"correct":22},"建安工程费用和设备工器具购置费用",{"key":27,"text":67,"correct":22},"建安工程费、其它费用",{"key":30,"text":69,"correct":22},"建设投资",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},893743,"完整的竣工决算所包含的内容是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":32},"竣工财务决算说明书、竣工财务决算报表、工程竣工图、工程竣工造价对比分析",{"key":24,"text":77,"correct":22},"竣工财务决算报表、竣工决算、工程竣工图、工程竣工造价对比分析",{"key":27,"text":79,"correct":22},"竣工财务决算说明书、竣工决算、竣工验收报告、工程竣工造价对比分析",{"key":30,"text":81,"correct":22},"竣工财务决算报表、工程竣工图、竣工验收报告、工程竣工造价对比分析",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},893744,"（ ）是以实物数量和货币标准为计量单位，综合反映竣工建设项目全部建设费用、建设成果和财务情况的总结性文件，是正确核定新增固定资产价值的依据。",[86,88,90,92],{"key":20,"text":87,"correct":22},"竣工图",{"key":24,"text":89,"correct":22},"竣工结算",{"key":27,"text":91,"correct":32},"竣工决算",{"key":30,"text":93,"correct":22},"竣工验收签证书",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},893745,"（ ）是以实物数量和货币标准为计量单位，综合反映竣工项目从筹建开始到项目竣工交付使用为止的全部建设费用、建设成果和财务情况的总结性文件。",[98,99,100,101],{"key":20,"text":87,"correct":22},{"key":24,"text":89,"correct":22},{"key":27,"text":91,"correct":32},{"key":30,"text":93,"correct":22},{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":27,"analysis":33},893746,"2013年3月完成的某工程，按基准日期的价格计算工程进度款为200万元，合同支付中不能调值的部分占合同总价的20％；相关成本要素除水泥价格上涨15％外，其余均未发生变化，水泥费用在合同总价中所占的比重系数为0.3。按调值公式计算2013年3月实际工程结算款应为（）万元。",[106,108,110,112],{"key":20,"text":107,"correct":22},"200.00",{"key":24,"text":109,"correct":22},"207.20",{"key":27,"text":111,"correct":32},"209.00",{"key":30,"text":113,"correct":22},"230.00",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":27,"analysis":33},893747,"基本建设项目完工可投入使用或者试运行合格后，应当在（ ）个月内编报竣工财务决算。",[118,120,122,124],{"key":20,"text":119,"correct":22},"1",{"key":24,"text":121,"correct":22},"2",{"key":27,"text":123,"correct":32},"3",{"key":30,"text":125,"correct":22},"5",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":30,"analysis":33},893748,"下列选项中，不属于竣工决算的编制程序中前期准备工作阶段的主要工作内容的是（ ）。",[130,132,134,136],{"key":20,"text":131,"correct":22},"收集和整理基本的编制资料",{"key":24,"text":133,"correct":22},"制定切实可行、符合建设项目情况的编制计划",{"key":27,"text":135,"correct":22},"由项目负责人对成员进行培训",{"key":30,"text":137,"correct":32},"编制完成规范的工作底稿",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":20,"analysis":33},893749,"下列选项不属于无形资产的评估方法的是（ ）。",[142,144,146,148],{"key":20,"text":143,"correct":32},"市场法",{"key":24,"text":145,"correct":22},"清算价格法",{"key":27,"text":147,"correct":22},"收益法",{"key":30,"text":149,"correct":22},"成本法",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":27,"analysis":33},893750,"关于建设工程竣工图的说法中，正确的是（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"工程竣工图是构成竣工结算的重要组成内容之一",{"key":24,"text":157,"correct":22},"改、扩建项目涉及原有工程项目变更的，应在原项目施工图上注明修改部分，并加盖“竣工图”标志后作为竣工图",{"key":27,"text":159,"correct":32},"凡按图竣工没有变动的，由承包人在原施工图上加盖“竣工图”标志后，即作为竣工图",{"key":30,"text":161,"correct":22},"项目有重大改变需重新绘制时，不论何方原因造成，一律由承包人负责重绘新图",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":27,"analysis":33},893751,"关于招标工程量清单中缺项、漏项的处理，下列说法中错误的是（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":22},"工程量清单缺项、漏项及计算错误带来的风险由发包方承担",{"key":24,"text":169,"correct":22},"分部分项工程量清单漏项造成新增工程量的，应按变更事件的有关方法调整合同价款",{"key":27,"text":171,"correct":32},"分部分项工程量清单缺项引起措施项目发生变化的，应按与分部分项工程相同的方法进行调整",{"key":30,"text":173,"correct":22},"招标工程量清单中措施工程项目缺项，投标人在投标时未予以填报的，合同实施期间应予增加",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":20,"analysis":33},893752,"每个支付期末，承包人应与进度款同期向发包人提交本期间所有（ ）记录的签证汇总表，以说明本期间自己认为有权得到的相应金额。",[178,180,182,184],{"key":20,"text":179,"correct":32},"计日工",{"key":24,"text":181,"correct":22},"暂估价",{"key":27,"text":183,"correct":22},"暂列金额",{"key":30,"text":185,"correct":22},"总承包服务费",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":30,"analysis":33},893753,"因不可抗力原因造成的损失，应由承包人承担的情形是（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":22},"因工程损害导致第三方人员伤亡",{"key":24,"text":193,"correct":22},"运至施工场地用于施工的工程设备的损害",{"key":27,"text":195,"correct":22},"工程所需修复费用",{"key":30,"text":197,"correct":32},"承包人的施工机械设备损坏",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":24,"analysis":33},893754,"工程变更引起措施项目发生变化的，承包人提出调整措施项目费的，下列调整措施项目费的方法正确的是（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"安全文明施工费，按照实际发生变化的措施项目调整，但应考虑承包人报价浮动因素",{"key":24,"text":205,"correct":32},"采用单价计算的措施项目费，按照实际发生的措施项目按分部分项工程费的调整方法确定单价",{"key":27,"text":207,"correct":22},"按总价(或系数)计算的措施项目费，除安全文明施工费外，按照实际发生变化的措施项目调整，不考虑承包人报价浮动因素",{"key":30,"text":209,"correct":22},"按总价(或系数)计算的措施项目费，包括安全文明施工费，按照实际发生变化的措施项目调整，但应考虑承包人报价浮动因素",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":27,"analysis":33},893755,"当施工机械停工导致用索赔成立时，台班停滞费用正确的计算方法是（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":22},"按照机械设备台班费计算",{"key":24,"text":217,"correct":22},"按照台班费中的设备使用费计算",{"key":27,"text":219,"correct":32},"自有设备按照台班折旧费、人工费及其他费之和计算",{"key":30,"text":221,"correct":22},"租赁设备按照台班租金计算",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":24,"analysis":33},893756,"关于招标工程量清单缺项、漏项的处理，下列说法中正确的是（ ）。",[226,228,229,230],{"key":20,"text":227,"correct":22},"工程量清单缺项、漏项及计算错误带来的风险由发承包双方共同承担",{"key":24,"text":169,"correct":32},{"key":27,"text":171,"correct":22},{"key":30,"text":231,"correct":22},"招标工程量清单中措施项目缺项，投标人在投标时未予以填报的，合同实施期间不予增加",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":30,"analysis":33},893757,"某施工现场有装载机2台，由施工企业租得，台班单价5000元／台班，租赁费为2000元／台班，人工工资为80元／工日，窝工补贴25元／工日，以人工费和机械费合计为计算基础的综合费率为30％。在施工过程中发生了如下事件：监理人对已经覆盖的隐蔽工程要求重新检查且检查结果合格，配合用工20工日，装载机4台班。为此，施工企业可向业主索赔的费用为（ ）元。",[236,238,240,242],{"key":20,"text":237,"correct":22},"8080",{"key":24,"text":239,"correct":22},"9080",{"key":27,"text":241,"correct":22},"18080",{"key":30,"text":243,"correct":32},"28080",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":27,"analysis":33},893758,"某工程合同实施过程中发生了变更事件，在已标价清单中没有适用也没有类似单价，且工程造价管理机构发布的信息价格也缺价，承包人根据变更工程资料、计量规则、计价办法和有合法依据的市场价格计算出变更工程项目的价格为10万元，已知该项目发承包阶段招标控制价为1000万元，中标价为900万元(招标控制价和中标价中均包含20万元的安全文明施工费)，则该变更工程项目确认的变更价格应为（ ）万元。",[248,250,252,254],{"key":20,"text":249,"correct":22},"9．00",{"key":24,"text":251,"correct":22},"8．98",{"key":27,"text":253,"correct":32},"10．00",{"key":30,"text":255,"correct":22},"9．80",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":30,"analysis":33},893759,"以下各项中不属于索赔费用中人工费的是（ ）。",[260,262,264,266],{"key":20,"text":261,"correct":22},"完成合同之外的额外工作所花费的人工费",{"key":24,"text":263,"correct":22},"非承包商原因导致工效降低所增加的人工费",{"key":27,"text":265,"correct":22},"法定人工费增长",{"key":30,"text":267,"correct":32},"发包人原因导致工程延期期间管理人员工资",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":27,"analysis":33},893760,"分部分项工程中，已标价工程量清单中有适用于变更工程项目的，且工程变更导致的该清单项目的工程数量变化不足（ ）时，采用该项目的单价。",[272,274,276,278],{"key":20,"text":273,"correct":22},"10%",{"key":24,"text":275,"correct":22},"12%",{"key":27,"text":277,"correct":32},"15%",{"key":30,"text":279,"correct":22},"20%",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":27,"analysis":33},893762,"发包人应当依据相关工程的工期定额合理计算工期，压缩的工期天数不得超过定额工期的（ ），超过的，应在招标文件中明示增加赶工费用。",[284,286,287,288],{"key":20,"text":285,"correct":22},"5%",{"key":24,"text":273,"correct":22},{"key":27,"text":279,"correct":32},{"key":30,"text":289,"correct":22},"30%",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":20,"analysis":33},893763,"以下各类工程中适合采用价格指数调整价格差额的是（ ）。",[294,296,298,300],{"key":20,"text":295,"correct":32},"水坝",{"key":24,"text":297,"correct":22},"房屋建筑",{"key":27,"text":299,"correct":22},"装饰",{"key":30,"text":301,"correct":22},"通用设备安装",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":27,"analysis":33},893764,"根据《建设工程工程量清单计价规范》（GB 50500—2013），当实际增加的工程量超过清单工程量 15％以上，且造成按总价方式计价的措施项目发生变化的，应将（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":22},"综合单价调高，措施项目费调增",{"key":24,"text":309,"correct":22},"综合单价调高，措施项目费调减",{"key":27,"text":311,"correct":32},"综合单价调低，措施项目费调增",{"key":30,"text":313,"correct":22},"综合单价调低，措施项目费调减",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":20,"analysis":33},893765,"某工程进度计划网络图上的工作 X（在关键线路上）与工作 Y（在非关键线路上）同时受到异常恶劣气候条件的彩响，导致 X 工作延误 10 天，Y 工作延误 15 天，该气候条件未对其他工作造成影晌，若 Y 工作的自由时差为 20 天，则承包人可以向发包人索赔的工期是（ ）天。",[318,320,322,324],{"key":20,"text":319,"correct":32},"10",{"key":24,"text":321,"correct":22},"15",{"key":27,"text":323,"correct":22},"25",{"key":30,"text":325,"correct":22},"35",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":24,"analysis":33},893766,"发包人在招标工程量清单中给定某工程设备暂估价，下列关于该工程设备价款调整的说法正确的是（ ）。",[330,332,334,336],{"key":20,"text":331,"correct":22},"依法可不招标的项目，应由发包人组织采购，以采购价格取代暂估价",{"key":24,"text":333,"correct":32},"依法可不招标的项目，应由承包人按合同约定采购，以发包人确认后的价格取代暂估价",{"key":27,"text":335,"correct":22},"依法必须招标的项目，应由发包人招标选择供应商，以中标价格取代暂估价",{"key":30,"text":337,"correct":22},"依法必须招标的项目，应由承包人招标选择供应商，以中标价格取代暂估价",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":24,"analysis":33},893767,"为了合理划分发承包双方的合同风险，施工合同中应当约定一个基准日，对于基准日之后发生的风险，应当由（ ）承担。",[342,344,346,348],{"key":20,"text":343,"correct":22},"承包人",{"key":24,"text":345,"correct":32},"发包人",{"key":27,"text":347,"correct":22},"监理人",{"key":30,"text":349,"correct":22},"咨询人",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":27,"analysis":33},893768,"关于法规变化类合同价款的调整，下列说法正确的是（ ）",[354,356,358,360],{"key":20,"text":355,"correct":22},"不实行招标的工程，一般以施工合同签订前的第42天为基准日",{"key":24,"text":357,"correct":22},"基准日之前国家颁布的法规对合同价款有影晌的，应予调整",{"key":27,"text":359,"correct":32},"基准日之后国家政策对材料价格的影响，如已包含在物价波动调价公式中，不再予以考虑",{"key":30,"text":361,"correct":22},"承包人原因导致的工期延误期间，国家政策变化引起工程造价变化的.合同价款不予调整",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":30,"analysis":33},893769,"根据《标准施工招标文件》（2007 年版）通用合同条款，下列引起承包人索赔的事件中，只能获得工期补偿的是（ ）。",[366,368,370,372],{"key":20,"text":367,"correct":22},"发包人提前向承包人提供材料和工程设备",{"key":24,"text":369,"correct":22},"工程暂停后因发包人原因导致无法按时复工",{"key":27,"text":371,"correct":22},"因发包人原因导致工程试运行失败",{"key":30,"text":373,"correct":32},"异常恶劣的气候条件导致工期延误",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":20,"analysis":33},893770,"关于计日工费用的确认和支付，下列说法正确的是（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":32},"承包人应按照确认的计日工现场签证报告提出计日工项目的数量",{"key":24,"text":381,"correct":22},"发包人应根据已标价工程量清单中的工程数量和计日工单价确定",{"key":27,"text":383,"correct":22},"已标价工程量清单中没有计日工单价的，由发包人确定价格",{"key":30,"text":385,"correct":22},"已标价工程量清单中没有计日工单价的，由承包人确定价格",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":27,"analysis":33},893771,"根据《建设工程工程量清单计划规范》（GB 50500—2013），下列关于计日工的说法中正确的是（ ）。",[390,392,394,396],{"key":20,"text":391,"correct":22},"招标工程量清单计日工数量为暂定，计日工费不计入投标总价",{"key":24,"text":393,"correct":22},"发包人通知承包人以计日工方式实施的零星工作，承包人可以视情况决定是否执行",{"key":27,"text":395,"correct":32},"计日工表的费用项目包括人工费、材料费、施工机械使用费、企业管理费和利润",{"key":30,"text":397,"correct":22},"计日工金额不列入期中支付，在竣工结算时一并支付",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":27,"analysis":33},893772,"工程延误期间，因国家法律、行政法发生变化引起工程造价变化的，则（ ）。",[402,404,406,408],{"key":20,"text":403,"correct":22},"承包人导致的工程延误，合同价款均应予调整",{"key":24,"text":405,"correct":22},"发包人导致的工程延误，合同价款均应予调整",{"key":27,"text":407,"correct":32},"不可抗力导致的工程延误，合同价款均应予调整",{"key":30,"text":409,"correct":22},"无论何种情况，合同价款均应予调整",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":24,"analysis":33},893773,"有关法律法规政策变化引起的价款调整，下列表述中正确的是（ ）。",[414,416,418,420],{"key":20,"text":415,"correct":22},"发包人应当承担基准日之前发生的、作为一个有经验的承包人在招标投标阶段不可能合理预见的风险",{"key":24,"text":417,"correct":32},"如果有关价格(如人工、材料和工程设备等价格)的变化已经包含在物价波动事件的调价公式中，则不再考虑法律法规政策变化引起的价款调整",{"key":27,"text":419,"correct":22},"因国家法律、法规、规章和政策发生变化影响合同价款的风险，发承包双方应在合同中约定由承包人承担。",{"key":30,"text":421,"correct":22},"承包人的原因导致的工期延误，在工程延误期间国家的法律、行政法规和相关政策发生变化引起工程造价变化的，造成合同价款增加的，合同价款可以调整",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":24,"analysis":33},893774,"某施工合同约定采用价格指数及价格调整公式调整价格差额，调价因素及有关数据见下表。某月完成进度款为 1500万元，则该月应当支付给承包人的价格调整金额为（）万元。",[426,428,430,432],{"key":20,"text":427,"correct":22},"-30.3",{"key":24,"text":429,"correct":32},"36.45",{"key":27,"text":431,"correct":22},"112.5",{"key":30,"text":433,"correct":22},"130.5",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":27,"analysis":33},893775,"因不可抗力造成的下列损失，应由承包人承担的是（）。",[438,440,442,444],{"key":20,"text":439,"correct":22},"工程所需清理、修复费用",{"key":24,"text":441,"correct":22},"运至施工场地待安装设备的损失",{"key":27,"text":443,"correct":32},"承包人的施工机械设备损坏及停工损失",{"key":30,"text":445,"correct":22},"停工期间，发包人要求承包人留在工地的保卫人员费用",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":30,"analysis":33},893777,"关于建设项目最终结清阶段承包人索赔的权力和期限，下列说法中正确的是（ ）。",[450,452,454,456],{"key":20,"text":451,"correct":22},"承包人接受竣工结算支付证书后再无权提出任何索赔",{"key":24,"text":453,"correct":22},"承包人只能提出工程接收证书颁发前的索赔",{"key":27,"text":455,"correct":22},"承包人提出索赔的期限自缺陷责任期满时终止",{"key":30,"text":457,"correct":32},"承包人提出索赔的期限自接收最终支付证书时终止",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},893778,"根据《建设工程工程量清单计价规范》（GB 50500—2013），当合同中没有约定时，对于任一招标工程量清单项目，如果因工程变更等原因导致工程量偏差超过（ ）时，合同单价应进行调整。",[462,463,464,465],{"key":20,"text":279,"correct":22},{"key":24,"text":277,"correct":32},{"key":27,"text":273,"correct":22},{"key":30,"text":285,"correct":22},{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":27,"analysis":33},893779,"工程量清单中的暂估价是指（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"工程合同签订时尚未确定或不可预见的材料、工程设备采购费用",{"key":24,"text":473,"correct":22},"可能发生但暂时不能确定价格的材料、工程设备单价及分包工程费用",{"key":27,"text":475,"correct":32},"必然发生但暂时不能确定价格的材料、工程设备单价及专业工程费用",{"key":30,"text":477,"correct":22},"工程施工中可能发生的工程变更，合同调整及索赔等引起的工程费用",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":20,"analysis":33},893780,"关于工程质量保证金的说法，正确的是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":32},"合同约定缺陷责任期终止后，发包人应按照合同中最终结清的相关规定，将剩余的质量保证金返还给承包人",{"key":24,"text":485,"correct":22},"在合同约定的缺陷责任期终止后，发包人退还剩余质量保证金，承包人不再承担质量保修责任",{"key":27,"text":487,"correct":22},"承包人未按照合同约定履行工程缺陷修复义务的，发包人有权从质量保证金中扣除用于各种缺陷修复的支出",{"key":30,"text":489,"correct":22},"最终结清时，如果承包人被预留的质量保证金不足以抵减发包人工程缺陷修复费用的，发包入应承担不足部分",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":30,"analysis":33},893781,"关于工程量清单计价方式下竣工结算的编制原则，下列说法中正确的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"措施项目费按双方确认的工程量乘以已标价工程量清单的综合单价计算",{"key":24,"text":497,"correct":22},"总承包服务费按已标价工程量清单的金额计算，不应调整",{"key":27,"text":499,"correct":22},"暂列金额应减去工程价款调整的金额，余额归承包人",{"key":30,"text":501,"correct":32},"工程实施过程中发承包双方已经确认的工程计量结果和合同价款，应直接进入结算",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":30,"analysis":33},893782,"关于最终结清，下列说法中正确的是（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":22},"最终结清是在工程保修期满后对剩余质量保证金的最终结清",{"key":24,"text":509,"correct":22},"最终结清支付证书一经签发，承包人对合同内享有的索赔权利即自行终止",{"key":27,"text":511,"correct":22},"质量保证金不足以抵减发包人工程缺陷修复费用的，应按合同约定的争议解决方式处理",{"key":30,"text":513,"correct":32},"最终结清付款涉及政府投资的，应按国家集中支付相关规定和专用合同条款约定办理",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},893783,"根据《建设工程工程量清单计价规范》（GB 50500—2013），由于承包人原因未在约定的工期内竣工的，则对原约定竣工日期后继续施工的工程，在使用价格调整公式进行价格调整时，应使用的现行价格指数是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"原约定竣工日期的价格指数",{"key":24,"text":521,"correct":32},"原约定竣工日期与实际竣工日期的两个价格指数中较低者",{"key":27,"text":523,"correct":22},"实际竣工日期的价格指数",{"key":30,"text":525,"correct":22},"原约定竣工日期与实际竣工日期的两个价格指数中较高者",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":30,"analysis":33},893784,"根据《建设工程工程量清单计价规范》（GB 50500—2013），签约合同中的暂估材料在确定单价以后，其相应项目综合单价的处理方式是（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"在综合单价中用确定单价代替原暂估价，并调整企业管理费，不调整利润",{"key":24,"text":533,"correct":22},"在综合单价中用确定单价代替原暂估价，并调整企业管理费和利润",{"key":27,"text":535,"correct":22},"综合单价不做调整",{"key":30,"text":537,"correct":32},"在综合单价中用确定单价代替原暂估价，不再调整企业管理费和利润",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":27,"analysis":33},893785,"根据《建设工程工程量清单计价规范》（GB 50500—2013），采用清单计价的某分部分项工程，最高投标限价的综合单价为350元，承包人投标报价的综合单价为300元，该工程投标报价总的下浮率为5%，结算时，该分部分项工程工程量比清单工程量增加了16%，且合同未确定综合单价调整方法，则对该综合单价的正确处理方式是（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":22},"调整为257元",{"key":24,"text":545,"correct":22},"调整为282.63元",{"key":27,"text":547,"correct":32},"不做任何调整",{"key":30,"text":549,"correct":22},"调整为345元",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":20,"analysis":33},893786,"根据《建设工程工程量清单计价规范》（GB 50500—2013），关于合同工期的说法正确的是（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":32},"发包人要求合同工程提前竣工的，应承担承包人由此增加的提前竣工费用",{"key":24,"text":557,"correct":22},"招标人压缩的工期天数不得超过定额工期的30%",{"key":27,"text":559,"correct":22},"招标人压缩的工期天数超过定额工期的20%但不超过30%时，不额外支付赶工费用",{"key":30,"text":561,"correct":22},"工程实施过程中，发包入要求合同工程提前竣工的，承包入必须采取加快工程进度的措施",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":27,"analysis":33},893787,"根据《建设工程工程量清单计价规范》（GB 50500—2013），关于提前竣工的说法，正确的是（ ）。",[566,568,570,572],{"key":20,"text":567,"correct":22},"招标人压缩的工期天数不得超过定额工期的50%",{"key":24,"text":569,"correct":22},"工程实施过程中，发包人要求合同工程提前竣工，可以不征求承包人意见",{"key":27,"text":571,"correct":32},"发承包双方约定提前竣工每日历天应补偿额度，与结算款一并支付",{"key":30,"text":573,"correct":22},"赶工费用包括人工费、材料费、机械费以及履约保函手续费的增加",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":24,"analysis":33},893788,"关于施工合同履行过程中暂估价的确定，下列说法中正确的是（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":22},"不属于依法必须招标的材料，以承包人自行采购的价格取代暂估价",{"key":24,"text":581,"correct":32},"属于依法必须招标的暂估价设备，由发承包双方以招标方式选择供应商，以中标价取代暂估价",{"key":27,"text":583,"correct":22},"不属于依法必须招标的暂估价专业工程，不应按工程变更确定工程价款而应另行签订补充协议确定工程价款",{"key":30,"text":585,"correct":22},"属于依法必须招标的暂估价专业工程，承包人不得参加投标",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":20,"analysis":33},893789,"关于投标报价时综合单价的确定，下列做法中正确的是（）。",[590,592,594,596],{"key":20,"text":591,"correct":32},"以项目特征描述为依据确定综合单价",{"key":24,"text":593,"correct":22},"招标工程量清单特征描述与设计图纸不符时，应以设计图纸为准",{"key":27,"text":595,"correct":22},"应考虑招标文件规定范围（幅度）外的风险费用",{"key":30,"text":597,"correct":22},"消耗量指标的计算应以地区或行业定额为依据",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":24,"analysis":33},893790,"实行工程量清单计价的招标工程，投标人可完全自主报价的是（ ）。",[602,603,604,606],{"key":20,"text":183,"correct":22},{"key":24,"text":185,"correct":32},{"key":27,"text":605,"correct":22},"专业工程暂估价",{"key":30,"text":607,"correct":22},"措施项目费",[609,612,615,618,621,624],{"id":15,"name":610,"category":7,"favorite":611},"领导干部任职前廉政法规知识测试题",92,{"id":613,"name":614,"category":7,"favorite":15},595,"建筑结构与设备",{"id":616,"name":617,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":619,"name":620,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":622,"name":623,"category":7,"favorite":8},534,"BIM工程师",{"id":625,"name":623,"category":7,"favorite":8},535]