[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-580-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":604},{"id":5,"name":6,"category":7,"favorite":8},580,"[土木建筑工程]建设工程计量与计价实务","建筑工程",0,15,50,1733,[13,34,46,58,70,79,91,103,115,127,139,151,163,175,187,199,211,223,235,247,259,271,283,295,304,316,328,339,349,361,373,385,397,409,421,430,442,454,464,476,488,500,512,524,535,547,559,571,580,592],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},893684,1,"单选题","根据《建设工程工程量清单计价规范》（GB 50500—2008）附录 B，关于装饰装修工程量计算的说法，正确的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","石材墙面按图示尺寸面积计算",false,{"key":24,"text":25,"correct":22},"B","墙面装饰抹灰工程量应扣除踢脚线所占面积",{"key":27,"text":28,"correct":29},"C","干挂石材钢骨架按设计图示尺寸以质量计算",true,{"key":31,"text":32,"correct":22},"D","装饰板墙面按设计图示面积计算，不扣除门窗洞口所占面积","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},893685,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），关于抹灰工程量说法正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"墙面抹灰工程量应扣除墙与构件交接处面积",{"key":24,"text":41,"correct":29},"有墙裙的内墙抹灰按主墙间净长乘以墙裙顶至天棚底高度以面积计算",{"key":27,"text":43,"correct":22},"内墙裙抹灰不单独计算",{"key":31,"text":45,"correct":22},"外墙抹灰按外墙展开面积计算",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},893686,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），天棚抹灰工程量计算正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"扣除检查口和管道所占面积",{"key":24,"text":53,"correct":22},"板式楼梯底面抹灰按水平投影面积计算",{"key":27,"text":55,"correct":22},"扣除间壁墙、垛和柱所占面积",{"key":31,"text":57,"correct":29},"锯齿形楼梯底板抹灰按展开面积计算",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},893687,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，关于天棚装饰工程量计算，说法正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":29},"灯带（槽）按设计图示尺寸以框外围面积计算",{"key":24,"text":65,"correct":22},"灯带（槽）按设计图示尺寸以延长米计算",{"key":27,"text":67,"correct":22},"送风口按设计图示尺寸以结构内边线面积计算",{"key":31,"text":69,"correct":22},"回风口按设计图示尺寸以面积计算",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},893688,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），关于装饰装修工程量计算的说法，正确的是（ ）。",[74,76,77,78],{"key":20,"text":75,"correct":22},"石材墙面按图示尺寸以长度计算",{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":29},{"key":31,"text":32,"correct":22},{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":27,"analysis":33},893689,"编制工程量清单出现计算规范附录中未包括的清单项目时，编制人应作补充，下列有关编制补充项目的说法中正确的是（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":22},"补充项目编码应由B与三位阿拉伯数字组成",{"key":24,"text":86,"correct":22},"补充项目应报县级工程造价管理机构备案",{"key":27,"text":88,"correct":29},"补充项目的工作内容应予以明确",{"key":31,"text":90,"correct":22},"补充项目编码应顺序编制，起始序号由编制人根据需要自主确定",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":24,"analysis":33},893690,"所有清单项目的工程量应以实体工程量为准，投标人在施工中可能的各种损耗和需要增加的工程量应（ ）。",[95,97,99,101],{"key":20,"text":96,"correct":22},"另列清单项目予以报价",{"key":24,"text":98,"correct":29},"考虑在投标报价的单价中",{"key":27,"text":100,"correct":22},"考虑在措施项目报价中",{"key":31,"text":102,"correct":22},"纳入风险费进行报价",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":27,"analysis":33},893691,"根据《房屋建筑与装饰工程量计算规范》GB 50584—2013的规定，垫层应该属于（ ）。",[107,109,111,113],{"key":20,"text":108,"correct":22},"专业工程",{"key":24,"text":110,"correct":22},"分类工程",{"key":27,"text":112,"correct":29},"分部工程",{"key":31,"text":114,"correct":22},"分项工程",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":24,"analysis":33},893692,"招标工程量清单中，在编制总承包服务费计价表时，应由招标人填写的内容是（ ）。",[119,121,123,125],{"key":20,"text":120,"correct":22},"服务金额",{"key":24,"text":122,"correct":29},"项目名称",{"key":27,"text":124,"correct":22},"费率",{"key":31,"text":126,"correct":22},"金额",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":31,"analysis":33},893693,"分部分项工程量清单是指表示拟建工程分项实体工程项目名称和相应数量的明细清单，应包括的要件是（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":22},"项目编码、项目名称、计量单位和工程量",{"key":24,"text":134,"correct":22},"项目编码、项目名称、项目特征和工程量",{"key":27,"text":136,"correct":22},"项目编码、项目名称、项目特征、计量单位和工程单价",{"key":31,"text":138,"correct":29},"项目编码、项目名称、项目特征、计量单位和工程量",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":27,"analysis":33},893694,"对于其他项目中的计日工，投标人正确的报价方式是（ ）。",[143,145,147,149],{"key":20,"text":144,"correct":22},"按政策规定标准估算报价",{"key":24,"text":146,"correct":22},"按招标文件提供的金额报价",{"key":27,"text":148,"correct":29},"自主报价",{"key":31,"text":150,"correct":22},"待签证时报价",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":27,"analysis":33},893695,"根据《房屋建筑与装饰工程量计算规范》GB50854—2013，编制工程量清单补充项目时，编制人应报备案的单位是（ ）。",[155,157,159,161],{"key":20,"text":156,"correct":22},"企业技术管理部门",{"key":24,"text":158,"correct":22},"工程所在地造价管理部门",{"key":27,"text":160,"correct":29},"省级或行业工程造价管理机构",{"key":31,"text":162,"correct":22},"住房和城乡建设部标准定额研究所",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":31,"analysis":33},893696,"当同一标段的一份工程量清单中含有多个单位工程且工程量清单是以单位工程为编制对象时，在编制工程量清单时应特别注意对项目编码（ ）位的设置不得有重码。",[167,169,171,173],{"key":20,"text":168,"correct":22},"一至三",{"key":24,"text":170,"correct":22},"四至六",{"key":27,"text":172,"correct":22},"七至九",{"key":31,"text":174,"correct":29},"十至十二",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":31,"analysis":33},893697,"关于工程量清单中的计日工，下列说法中正确的是（ ）。",[179,181,183,185],{"key":20,"text":180,"correct":22},"即指零星工作所消耗的人工工时",{"key":24,"text":182,"correct":22},"在投标时计入总价，其数量和单价由投标人填报",{"key":27,"text":184,"correct":22},"应按投标文件载明的数量和单价进行结算",{"key":31,"text":186,"correct":29},"在编制招标工程量清单时，暂定数量由招标人填写",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":27,"analysis":33},893698,"对于不能计算工程量的措施项目，当按施工方案计算措施费时，若无“计算基础”和“费率”数值，则（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":22},"以定额基价为计算基础，以国家、行业、地区定额中相应的费率计算金额",{"key":24,"text":194,"correct":22},"以“定额人工费+定额机械费”为计算基础，以国家、行业、地区定额中相应费率计算金额",{"key":27,"text":196,"correct":29},"只填写“金额”数值，在备注中说明施工方案出处或计算方法",{"key":31,"text":198,"correct":22},"以备注中说明的计算方法，补充填写“计算基础”和“费率”",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":31,"analysis":33},893699,"下列费用项目中，应由投标人确定额度，并计入其他项目清单与计价汇总表中的是（ ）。",[203,205,207,209],{"key":20,"text":204,"correct":22},"暂列金额",{"key":24,"text":206,"correct":22},"材料暂估价",{"key":27,"text":208,"correct":22},"专业工程暂估价",{"key":31,"text":210,"correct":29},"总承包服务费",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":31,"analysis":33},893700,"采用工程量清单计价的总承包服务费计价表中，应由投标人填写的内容是（ ）。",[215,217,219,221],{"key":20,"text":216,"correct":22},"项目价值",{"key":24,"text":218,"correct":22},"服务内容",{"key":27,"text":220,"correct":22},"计算基础",{"key":31,"text":222,"correct":29},"费率和金额",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},893701,"下列内容中，属于招标工程量清单编制依据的是（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":22},"分部分项工程清单",{"key":24,"text":230,"correct":29},"拟定的招标文件",{"key":27,"text":232,"correct":22},"招标控制价",{"key":31,"text":234,"correct":22},"潜在投标人的资质及能力",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":27,"analysis":33},893702,"关于规费的计算，下列说法正确的是（ ）。",[239,241,243,245],{"key":20,"text":240,"correct":22},"规费虽具有强制性，但根据其组成又可以细分为可竞争性的费用和不可竞争性的费用",{"key":24,"text":242,"correct":22},"规费由社会保险费和工程排污费组成",{"key":27,"text":244,"correct":29},"社会保险费由养老保险费、失业保险费、医疗保险费、生育保险费、工伤保险费组成",{"key":31,"text":246,"correct":22},"规费由意外伤害保险费、住房公积金、工程排污费组成",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":27,"analysis":33},893703,"关于工程量清单编制总说明的内容，下列说法中正确的是（ ）。",[251,253,255,257],{"key":20,"text":252,"correct":22},"建设规模是指工程投资总额",{"key":24,"text":254,"correct":22},"工程特征是指结构类型及主要施工方案",{"key":27,"text":256,"correct":29},"环境保护要求包括避免材料运输影响周边环境的防护要求",{"key":31,"text":258,"correct":22},"施工现场实际情况是指自然地理条件",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":27,"analysis":33},893704,"关于招标控制价及其编制的说法，正确的是（ ）。",[263,265,267,269],{"key":20,"text":264,"correct":22},"综合单价中包括应由招标人承担的风险费用",{"key":24,"text":266,"correct":22},"计日工的单价由招标人根据实际情况填写",{"key":27,"text":268,"correct":29},"总承包服务费项目名称、服务内容由招标人填写，编制招标控制价时，费率及金额由招标人按有关计价规定确定",{"key":31,"text":270,"correct":22},"招标文件提供暂估价的主要材料，其主材费用应计入其他项目清单费用",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":27,"analysis":33},893705,"根据《工程工程量清单计价规范》GB50500--2013，下列关于计日工的说法中正确的是（ ）。",[275,277,279,281],{"key":20,"text":276,"correct":22},"招标工程量清单计日工数量为暂定，计日工费不计入投标总价",{"key":24,"text":278,"correct":22},"招标时计日工单价由招标人根据实际情况暂定",{"key":27,"text":280,"correct":29},"计日工表应列出项目名称、计量单位和暂估数量",{"key":31,"text":282,"correct":22},"计日工金额不列入期中支付，在竣工结算时一并支付",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":24,"analysis":33},893706,"根据《建设工程工程量清单计价规范》（GB 50500－2013），关于计日工，下列说法中正确的是（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":22},"计日工表包括各种人工，不应包括材料、施工机械",{"key":24,"text":290,"correct":29},"计日工按综合单价计价，投标时应计入投标总价",{"key":27,"text":292,"correct":22},"计日工表中的项目名称由招标人填写，工程数量由投标人填写",{"key":31,"text":294,"correct":22},"计日工单价由投标人自主确定，并按计日工表中所列数量结算",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":27,"analysis":33},893707,"在总价措施项目清单与计价表中，不需要列出的项目是（ ）。",[299,300,301,303],{"key":20,"text":220,"correct":22},{"key":24,"text":124,"correct":22},{"key":27,"text":302,"correct":29},"计量单位",{"key":31,"text":126,"correct":22},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":20,"analysis":33},893709,"下列措施项目中，应按分部分项工程量清单编制方式编制的是（ ）。",[308,310,312,314],{"key":20,"text":309,"correct":29},"垂直运输",{"key":24,"text":311,"correct":22},"安全文明施工",{"key":27,"text":313,"correct":22},"二次搬运",{"key":31,"text":315,"correct":22},"冬雨季施工",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":24,"analysis":33},893710,"编制工程量清单出现计算规范附录中未包括的清单项目时，下列正确的做法是（ ）。",[320,322,324,326],{"key":20,"text":321,"correct":22},"补充项目编码由附录顺序码与B和三位阿拉伯数字组成",{"key":24,"text":323,"correct":29},"补充项目应报省级工程造价管理机构备案",{"key":27,"text":325,"correct":22},"补充项目的工作内容可不明确",{"key":31,"text":327,"correct":22},"补充项目编码由编制人根据需要自主确定",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":24,"analysis":33},893711,"根据《建设工程工程量清单计价规范》（GB 50500—2013），允许投标人根据具体情况对招标工程量清单进行修正或增加的内容是（ ）。",[332,334,336,337],{"key":20,"text":333,"correct":22},"分部分项工程量清单",{"key":24,"text":335,"correct":29},"措施项目清单",{"key":27,"text":204,"correct":22},{"key":31,"text":338,"correct":22},"计日工",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":31,"analysis":33},893713,"施工招标工程量清单中，应由投标人自主报价的其他项目是（ ）。",[343,344,345,347],{"key":20,"text":208,"correct":22},{"key":24,"text":204,"correct":22},{"key":27,"text":346,"correct":22},"工程设备暂估价",{"key":31,"text":348,"correct":29},"计日工单价",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":31,"analysis":33},893714,"根据《房屋建筑与装饰工程工程量计算规范》（GB50584—2013），关于门窗工程类计算，说法正确的是（ ）。",[353,355,357,359],{"key":20,"text":354,"correct":22},"木质门带套工程量应按套外围面积计算",{"key":24,"text":356,"correct":22},"门窗工程量计量单位与项目特征描述无关",{"key":27,"text":358,"correct":22},"门窗工程量按图示尺寸以面积为单位时，项目特征必须描述洞口尺寸",{"key":31,"text":360,"correct":29},"门窗工作量以数量“樘”为单位时，项目特征必须描述洞口尺寸",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":20,"analysis":33},893715,"关于招标工程量清单中分部分项工程量清单的编制，下列说法中错误的是（ ）。",[365,367,369,371],{"key":20,"text":366,"correct":29},"招标人只负责项目编码、项目名称、计量单位和工程量四项内容的填写",{"key":24,"text":368,"correct":22},"同一招标工程的项目编码不得有重复",{"key":27,"text":370,"correct":22},"清单所列项目应在单位工程施工过程中以其本身构成该工程实体的分项工程",{"key":31,"text":372,"correct":22},"当清单计价规范附录中有两个计量单位时，应结合实际情况选择其中一个",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},893716,"根据《建设工程工程量清单计价规范》（GB 50500—2013），下列关于工程量清单项目编码的说法中，正确的是（ ）。",[377,379,381,383],{"key":20,"text":378,"correct":22},"第三级编码为分部工程顺序码，由三位数字表示",{"key":24,"text":380,"correct":29},"第五级编码应根据拟建工程的工程量清单项目名称设置，不得重码",{"key":27,"text":382,"correct":22},"同一标段含有多个单位工程，不同单位工程中项目特征相同的工程应采用相同编码",{"key":31,"text":384,"correct":22},"补充项目编码以加上计量规范代码后跟三位数字表示",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":24,"analysis":33},893717,"招标工程清单是招标文件的组成部分，其准确性由（ ）负责。",[389,391,393,395],{"key":20,"text":390,"correct":22},"招标代理机构",{"key":24,"text":392,"correct":29},"招标人",{"key":27,"text":394,"correct":22},"编制工程量清单的造价咨询机构",{"key":31,"text":396,"correct":22},"招标工程量清单的编制人",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":20,"analysis":33},893718,"在规费、税金项目计价表中，社会保险费的计算基础是（ ）",[401,403,405,407],{"key":20,"text":402,"correct":29},"定额人工费",{"key":24,"text":404,"correct":22},"定额机械费",{"key":27,"text":406,"correct":22},"定额人工费+定额机械费",{"key":31,"text":408,"correct":22},"定额人工费+定额材料费+定额机械费",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":20,"analysis":33},893719,"除另有说明外，分部分项工程量清单表中的工程量应等于（ ）。",[413,415,417,419],{"key":20,"text":414,"correct":29},"实体工程量",{"key":24,"text":416,"correct":22},"实体工程量+施工损耗量",{"key":27,"text":418,"correct":22},"实体工程量+施工需要增加的工程量",{"key":31,"text":420,"correct":22},"实体工程量+措施工程量",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":20,"analysis":33},893720,"《建设工程工程量清单计价规范》规定，分部分项工程量清单项目编码的第四级为表示（ ）的顺序码。",[425,426,428,429],{"key":20,"text":114,"correct":29},{"key":24,"text":427,"correct":22},"附录分类",{"key":27,"text":112,"correct":22},{"key":31,"text":108,"correct":22},{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":27,"analysis":33},893721,"根据《建设工程工程量清单计价规范》（GB 50500-2013）关于招标工程量清单中暂列金额的编制，下列说法正确的是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"应详列其项目名称、计量单位，不列明金额",{"key":24,"text":437,"correct":22},"应列明暂定金额总额，不详列项目名称",{"key":27,"text":439,"correct":29},"不同专业预留的暂列金额应分别列项",{"key":31,"text":441,"correct":22},"没有特殊要求一般不列暂列金额",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":20,"analysis":33},893722,"根据《建设工程工程量计价规范》（GB50500-2013，关于其他项目清单的编制和计价，下列说法正确的是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":29},"暂列金额由招标人在工程量清单中暂定",{"key":24,"text":449,"correct":22},"暂列金额包括暂不能确定价格的材料暂定价",{"key":27,"text":451,"correct":22},"专业工程量暂估价中包括规费和税金",{"key":31,"text":453,"correct":22},"计日工单价中不包括企业管理费和利润",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},893723,"招标人在工程量清单中提供的用于支付必然发生但暂不能确定价格的材料、工程设备单价及专业工程金额是（ ）。",[458,459,461,462],{"key":20,"text":204,"correct":22},{"key":24,"text":460,"correct":29},"暂估价",{"key":27,"text":210,"correct":22},{"key":31,"text":463,"correct":22},"价差预备费",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":20,"analysis":33},893724,"根据我国现行建筑安装工程费用项目组成的规定，下列费用中应计入暂列金额的是（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":29},"施工过程中可能发生的工程变更以及索赔、现场签证等费用",{"key":24,"text":471,"correct":22},"应建设单位要求,完成建设项目之外的零星项目费用",{"key":27,"text":473,"correct":22},"对建设单位自行采购的材料进行保管所发生的费用",{"key":31,"text":475,"correct":22},"施工用电、用水的开办费",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":27,"analysis":33},893725,"在同一合同段的工程量清单中，多个单位工程中具有相同项目特征的项目编码和计量单位时（ ）。",[480,482,484,486],{"key":20,"text":481,"correct":22},"项目编码不一致，计量单位不一致",{"key":24,"text":483,"correct":22},"项目编码一致，计量单位一致",{"key":27,"text":485,"correct":29},"项目编码不一致，计量单位一致",{"key":31,"text":487,"correct":22},"项目编码一致，计量单位不一致",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":27,"analysis":33},893726,"关于工程量清单的编制，下列说法中正确的是（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"项目编码以五级全国统一编码设置，用十二位阿拉伯数字表示",{"key":24,"text":495,"correct":22},"编制分部分项工程量清单时，必须对工作内容进行描述",{"key":27,"text":497,"correct":29},"补充项目的编码由计算规范的代码与B和三位阿拉伯数字组成",{"key":31,"text":499,"correct":22},"按施工方案计算的措施费，必须写明“计算基础”、“费率”的数值",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":27,"analysis":33},893727,"分部分项工程量清单项目编码用十二位数字表示，可分为（ ）级。",[504,506,508,510],{"key":20,"text":505,"correct":22},"3",{"key":24,"text":507,"correct":22},"4",{"key":27,"text":509,"correct":29},"5",{"key":31,"text":511,"correct":22},"6",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},893728,"根据《建设工程工程量清单计价规范》（GB50500—2013）编制的工程量清单中，某分部分项工程的项目编码010302004005，则“01”的含义是（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":22},"分项工程顺序码",{"key":24,"text":519,"correct":22},"分部工程顺序码",{"key":27,"text":521,"correct":22},"专业工程顺序码",{"key":31,"text":523,"correct":29},"工程分类顺序码",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":20,"analysis":33},893729,"下列费用中，应列入其他项目清单的是（ ）。",[528,529,531,533],{"key":20,"text":208,"correct":29},{"key":24,"text":530,"correct":22},"安全文明施工费",{"key":27,"text":532,"correct":22},"二次搬运费",{"key":31,"text":534,"correct":22},"夜间施工增加费",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":31,"analysis":33},893730,"工程量清单编制者应是（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":22},"投标单位的造价管理人员",{"key":24,"text":542,"correct":22},"招投标管理部门负责人",{"key":27,"text":544,"correct":22},"工程标底审查机构人员",{"key":31,"text":546,"correct":29},"有编制能力的招标人",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":27,"analysis":33},893731,"根据《建设工程工程量清单计价规范》（GB50500—2013），分部分项工程量清单中所列工程量以形成工程实体为准，按（ ）计算。",[551,553,555,557],{"key":20,"text":552,"correct":22},"施工方案计算出来的数值",{"key":24,"text":554,"correct":22},"实际完成的全部工程量",{"key":27,"text":556,"correct":29},"工程完成后的净值",{"key":31,"text":558,"correct":22},"工程实体量与损耗量之和",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":24,"analysis":33},893732,"招标人编制工程量清单时，对各专业工程现行《计量规范》中未包括的项目应作补充，则关于该补充项目及其编码的说法，正确的是（ ）。",[563,565,567,569],{"key":20,"text":564,"correct":22},"该项目编码应由对应《计量规范》的代码和三位阿拉伯数字组成",{"key":24,"text":566,"correct":29},"清单编制人应将补充项目报省级或行业工程造价管理机构备案",{"key":27,"text":568,"correct":22},"清单编制人在最后一个清单项目后面自行补充该项目，不需编码",{"key":31,"text":570,"correct":22},"该项目按《计量规范》中相近的清单项目编码",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":20,"analysis":33},893733,"根据《建设工程工程量清单计价规范》（GB50500—2013），关于其他项目清单的编制和计价，下列说法正确的是（ ）。",[575,576,577,579],{"key":20,"text":447,"correct":29},{"key":24,"text":449,"correct":22},{"key":27,"text":578,"correct":22},"专业工程暂估价中包括规费和增值税",{"key":31,"text":453,"correct":22},{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":24,"analysis":33},893734,"在进行实际工程的绘制和计算时，以下算量顺序正确的是（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":22},"新建工程→新建轴网→新建楼层→绘图输入→汇总查看报表",{"key":24,"text":587,"correct":29},"新建工程→新建楼层→新建轴网→绘图输入→汇总查看报表",{"key":27,"text":589,"correct":22},"新建轴网→新建工程→新建楼层→绘图输入→汇总查看报表",{"key":31,"text":591,"correct":22},"新建轴网→新建楼层→新建工程→绘图输入→汇总查看报表",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":24,"analysis":33},893735,"根据《房屋建筑与装饰工程工程量计算规范》G1350854—2013，若开挖设计长为20m，宽为6m，深度为0．8m的土方工程，在清单中列项应为（ ）。",[596,598,600,602],{"key":20,"text":597,"correct":22},"平整场地",{"key":24,"text":599,"correct":29},"挖沟槽",{"key":27,"text":601,"correct":22},"挖基坑",{"key":31,"text":603,"correct":22},"挖一般土方",[605,608,611,614,617,620],{"id":15,"name":606,"category":7,"favorite":607},"领导干部任职前廉政法规知识测试题",92,{"id":609,"name":610,"category":7,"favorite":15},595,"建筑结构与设备",{"id":612,"name":613,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":615,"name":616,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":618,"name":619,"category":7,"favorite":8},534,"BIM工程师",{"id":621,"name":619,"category":7,"favorite":8},535]