[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-580-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},580,"[土木建筑工程]建设工程计量与计价实务","建筑工程",0,14,50,1733,[13,34,46,58,70,82,94,106,118,130,142,152,160,171,183,192,204,216,224,236,248,260,268,280,289,301,313,325,336,348,360,372,384,396,408,420,432,444,456,468,480,492,504,516,528,540,552,561,573,584],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},893631,1,"单选题","根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），关于现浇混凝土梁工程量计算的说法，正确的是（）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","圈梁区分不同断面按设计中心线长度计算",false,{"key":24,"text":25,"correct":22},"B","过梁工程不单独计算，并入墙体工程量计算",{"key":27,"text":28,"correct":29},"C","异形梁按设计图示尺寸以体积计算",true,{"key":31,"text":32,"correct":22},"D","拱形梁按设计拱形轴线长度计算","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},893632,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013）规定，关于现浇混凝土基础的项目列项或工程量计算正确的为（）。",[38,40,42,44],{"key":20,"text":39,"correct":29},"箱式满堂基础中的墙按现浇混凝土墙列项",{"key":24,"text":41,"correct":22},"箱式满堂基础中的梁按满堂基础列项",{"key":27,"text":43,"correct":22},"框架式设备基础的基础部分按现浇混凝土墙列项",{"key":31,"text":45,"correct":22},"框架式设备基础的柱和梁按设备基础列项",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},893633,"根据《房屋建筑与装饰工程量计算规范》（GB50854-2013），关于石砌体工程量计算的说法，正确的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"石台阶按设计图示水平投影面积计算",{"key":24,"text":53,"correct":22},"石坡道按水平投影面积乘以平均高度以体积计算",{"key":27,"text":55,"correct":22},"石地沟、明沟按设计尺寸水平投影面积计算",{"key":31,"text":57,"correct":29},"一般石栏杆按设计图示尺寸以长度计算",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},893634,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013）规定，关于桩基础的项目列项或工程量计算正确的为（）。",[62,64,66,68],{"key":20,"text":63,"correct":29},"预制钢筋混凝土管桩试验桩应在工程量清单中单独列项",{"key":24,"text":65,"correct":22},"预制钢筋混凝土方桩试验桩工程量应并入预制钢筋混凝土方桩项目",{"key":27,"text":67,"correct":22},"现场截凿桩头工程量不单独列项，并入桩工程量计算",{"key":31,"text":69,"correct":22},"挖孔桩土方按设计桩长（包括桩尖）以米计算",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},893635,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854－2013）基坑支护的锚杆工程量应（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"按设计图示尺寸以支护体体积计算",{"key":24,"text":77,"correct":22},"按设计图示尺寸以支护面积计算",{"key":27,"text":79,"correct":29},"按设计图示尺寸以钻孔深度计算",{"key":31,"text":81,"correct":22},"按设计图示尺寸以质量计算",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},893636,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），关于土石方工程量计算，说法正确的是（）。",[86,88,90,92],{"key":20,"text":87,"correct":29},"回填土方项目特征应包括填方来源及运距",{"key":24,"text":89,"correct":22},"室内回填应扣除间隔墙所占体积",{"key":27,"text":91,"correct":22},"场地回填按设计回填尺寸以面积计算",{"key":31,"text":93,"correct":22},"基础回填不扣除基础垫层所占体积",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},893637,"根据《房屋建筑与装饰工程工程量计量规范》（GB50854-2013），若开挖设计长为20m，宽为 6m，深度为 0.8m的土方工程，在清单中列项应为（）",[98,100,102,104],{"key":20,"text":99,"correct":22},"平整场地",{"key":24,"text":101,"correct":29},"挖沟槽",{"key":27,"text":103,"correct":22},"挖基坑",{"key":31,"text":105,"correct":22},"挖一般土方",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},893638,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），关于地基处理，说法正确的是（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"铺设土工合成材料按设计长度计算",{"key":24,"text":113,"correct":22},"强夯地基按设计图示处理范围乘以深度以体积计算",{"key":27,"text":115,"correct":29},"填料振冲桩按设计图示尺寸以体积计算",{"key":31,"text":117,"correct":22},"砂石桩按设计数量以根计算",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},893639,"某管沟工程，设计管底垫层宽度为 2000mm，开挖深度为 2.00m，管径为 1200mm，工作面宽为 400mm，管道中心线长为 180m，管沟土方工程量计量正确的为（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"432m3",{"key":24,"text":125,"correct":22},"576m3",{"key":27,"text":127,"correct":29},"720m3",{"key":31,"text":129,"correct":22},"1008m3",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},893640,"某建筑首层面积 500㎡，场地较为平整，其自然地面标高为+87.5m，设计室外地面标高为+87.15m，则其场地土方清单列项和工程量分别是（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"按平整场地列项：500㎡",{"key":24,"text":137,"correct":22},"按一般土方列项：500㎡",{"key":27,"text":139,"correct":22},"按平整场地列项：175m3",{"key":31,"text":141,"correct":29},"按一般土方列项：175m3",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},893641,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），当土方开挖底长≤3倍底宽，且底面积≥150㎡，开挖深度为 0.8m时，清单项应列为（）。",[146,147,148,150],{"key":20,"text":99,"correct":22},{"key":24,"text":105,"correct":29},{"key":27,"text":149,"correct":22},"挖沟槽土方",{"key":31,"text":151,"correct":22},"挖基坑土方",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":24,"analysis":33},893645,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），若开挖设计长为20m，宽为6m，深度为0.8m的土方工程，在清单中列项应为（ ）。",[156,157,158,159],{"key":20,"text":99,"correct":22},{"key":24,"text":101,"correct":29},{"key":27,"text":103,"correct":22},{"key":31,"text":105,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":31,"analysis":33},893646,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），关于石砌体工程量计算的说法，正确的是（ ）。",[164,165,167,169],{"key":20,"text":51,"correct":22},{"key":24,"text":166,"correct":22},"石坡道按水平投影面积乘以平均体积计算",{"key":27,"text":168,"correct":22},"石地沟、明沟按设计力求水平投影面积计算",{"key":31,"text":170,"correct":29},"一般石栏杆按设计图示尺寸长度计算",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":27,"analysis":33},893647,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），在三类土中挖基坑不放坡的坑深可达（ ）。",[175,177,179,181],{"key":20,"text":176,"correct":22},"1.2m",{"key":24,"text":178,"correct":22},"1.3m",{"key":27,"text":180,"correct":29},"1.5m",{"key":31,"text":182,"correct":22},"2.0m",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":20,"analysis":33},893648,"根据《房屋建筑与装饰工程工程量计量规范》（GB 50854—2013），关于土石方回填工程量计算，说法正确的是（ ）。",[187,188,189,190],{"key":20,"text":87,"correct":29},{"key":24,"text":89,"correct":22},{"key":27,"text":91,"correct":22},{"key":31,"text":191,"correct":22},"基础回填不扣除基本垫层所占体积",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":20,"analysis":33},893649,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，关于石方的项目列项或工程量计算正确的为（ ）。",[196,198,200,202],{"key":20,"text":197,"correct":29},"山坡凿石按一般石方列项",{"key":24,"text":199,"correct":22},"考虑石方运输，石方体积需折算为虚方体积计算",{"key":27,"text":201,"correct":22},"管沟石方均按一般石方列项",{"key":31,"text":203,"correct":22},"基坑底面积超过120m2的按一般石方列项",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":31,"analysis":33},893650,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），砌筑工程量计算正确的是（ ）。",[208,210,212,214],{"key":20,"text":209,"correct":22},"砖地沟按设计图示尺寸以水平投影面积计算",{"key":24,"text":211,"correct":22},"砖地坪按设计图示尺寸以体积计算",{"key":27,"text":213,"correct":22},"石挡土墙按设计图示尺寸以面积计算",{"key":31,"text":215,"correct":29},"石坡道按设计图示尺寸以面积计算",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":27,"analysis":33},893651,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）基坑支护的锚杆工程量应（ ）。",[220,221,222,223],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":22},{"key":27,"text":79,"correct":29},{"key":31,"text":81,"correct":22},{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},893652,"对某建筑地基设计要求强夯处理，处理范围为40.0×56.0m，需要铺设400mm厚土工合成材料，并进行机械压实，根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，正确的项目列项或工程量计算是（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"铺设土工合成材料的工程量为896m3",{"key":24,"text":231,"correct":29},"铺设土工合成材料的工程量为2240m2",{"key":27,"text":233,"correct":22},"强夯地基工程量按一般土方项目列项",{"key":31,"text":235,"correct":22},"强夯地基工程量为896m3",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":20,"analysis":33},893653,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），地基处理工程量计算正确的是（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":29},"换填垫层按设计图示尺寸以体积计算",{"key":24,"text":243,"correct":22},"强夯地基按设计图示处理范围乘以处理深度以体积计算",{"key":27,"text":245,"correct":22},"填料振冲桩以填料体积计算",{"key":31,"text":247,"correct":22},"水泥粉煤碎石桩按设计图示尺寸以体积计算",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":24,"analysis":33},893654,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），打桩工程量计算正确的是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"打预制钢筋混凝土方桩，按设计图示尺寸桩长以米计算，送桩工程量另计",{"key":24,"text":255,"correct":29},"打预制钢筋混凝土管桩，按设计图示数量以根计算，截桩头工程量另计",{"key":27,"text":257,"correct":22},"钢管桩按设计图示截面积乘以桩长，以实体积计算",{"key":31,"text":259,"correct":22},"钢板桩按不同板幅以设计长度计算",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":20,"analysis":33},893655,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，关于现浇混凝土基础的项目列项或工程量计算正确的为（ ）。",[264,265,266,267],{"key":20,"text":39,"correct":29},{"key":24,"text":41,"correct":22},{"key":27,"text":43,"correct":22},{"key":31,"text":45,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":31,"analysis":33},893656,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，关于现浇混凝土柱工程量计算，说法正确的是（ ）。",[272,274,276,278],{"key":20,"text":273,"correct":22},"有梁板矩形独立柱工程量按柱设计截面积乘以自柱基底面至板面高度以体积计算",{"key":24,"text":275,"correct":22},"无梁板矩形柱工程量按柱设计截面积乘以自楼板上表面至柱帽上表面高度以体积计算",{"key":27,"text":277,"correct":22},"框架柱工程量按柱设计截面积乘以自柱基底面至柱顶面高度以体积计算",{"key":31,"text":279,"correct":29},"构造柱按设计尺寸自柱底面至顶面全高以体积计算",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":27,"analysis":33},893657,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），关于现浇混凝土梁工程量计算的说法，正确的是（ ）。",[284,285,286,288],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":287,"correct":29},"异型梁设计图示尺寸以体积计算",{"key":31,"text":32,"correct":22},{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":20,"analysis":33},893658,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），关于现浇混凝土板工程量计算的说法，正确的是（ ）。",[293,295,297,299],{"key":20,"text":294,"correct":29},"空心板按图示尺寸以体积计算，扣除空心所占体积",{"key":24,"text":296,"correct":22},"雨棚板从外墙内侧算至雨棚板结构外边线按面积计算",{"key":27,"text":298,"correct":22},"阳台板按墙体中心线以外部图示面积计算",{"key":31,"text":300,"correct":22},"天沟板按设计图示尺寸中心线长度计算",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":31,"analysis":33},893659,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，关于现浇混凝土板的工程量计算正确的为（ ）。",[305,307,309,311],{"key":20,"text":306,"correct":22},"栏板按设计图示尺寸以面积计算",{"key":24,"text":308,"correct":22},"雨篷按设计外墙中心线外图示体积计算",{"key":27,"text":310,"correct":22},"阳台板按设计外墙中心线外图示面积计算",{"key":31,"text":312,"correct":29},"散水按设计图示尺寸以面积计算",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":27,"analysis":33},893660,"在计算钢筋工程量时，钢筋的容量（kg\u002Fm3）可取（ ）。",[317,319,321,323],{"key":20,"text":318,"correct":22},"7580",{"key":24,"text":320,"correct":22},"7800",{"key":27,"text":322,"correct":29},"7850",{"key":31,"text":324,"correct":22},"8750",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":20,"analysis":33},893661,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），球型节点钢网架工程量（ ）。",[329,330,332,334],{"key":20,"text":81,"correct":29},{"key":24,"text":331,"correct":22},"按设计图示尺寸以榀计算",{"key":27,"text":333,"correct":22},"按设计图示尺寸以铺设水平投影面积计算",{"key":31,"text":335,"correct":22},"按设计图示构件尺寸以总长度计算",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":31,"analysis":33},893662,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），门窗工程量计算正确的是（ ）。",[340,342,344,346],{"key":20,"text":341,"correct":22},"木门框按设计图示洞口尺寸以面积计算",{"key":24,"text":343,"correct":22},"金属纱窗按设计图示洞口尺寸以面积计算",{"key":27,"text":345,"correct":22},"石材窗台板按设计图示以水平投影面积计算",{"key":31,"text":347,"correct":29},"木门的门锁安装按设计图示数量计算",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":31,"analysis":33},893663,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），关于门窗工程量计算，说法正确的是（ ）。",[352,354,356,358],{"key":20,"text":353,"correct":22},"木质门带套工程量应按套外围面积计算",{"key":24,"text":355,"correct":22},"门窗工程量计量单位与项目特征描述无关",{"key":27,"text":357,"correct":22},"门窗工程量按图示尺寸以面积为单位时，项目特征必须描述洞口尺寸",{"key":31,"text":359,"correct":29},"门窗工作量以数量“樘”为单位时，项目特征必须描述洞口尺寸",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":31,"analysis":33},893664,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，关于厂库房大门工程量计算，说法正确的是（ ）。",[364,366,368,370],{"key":20,"text":365,"correct":22},"防护铁丝门按设计数量以质量计算",{"key":24,"text":367,"correct":22},"金属格栅门按设计图示门框以面积计算",{"key":27,"text":369,"correct":22},"钢质花饰大门按设计图示数量以质量计算",{"key":31,"text":371,"correct":29},"全钢板大门按设计图示洞口尺寸以面积计算",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":24,"analysis":33},893665,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，关于金属窗工程量计算，说法正确的是（ ）。",[376,378,380,382],{"key":20,"text":377,"correct":22},"彩板钢窗按设计图示尺寸以框外围展开面积计算",{"key":24,"text":379,"correct":29},"金属纱窗按框的外围尺寸以面积计算",{"key":27,"text":381,"correct":22},"金属百叶窗按框外围尺寸以面积计算",{"key":31,"text":383,"correct":22},"金属橱窗按设计图示洞口尺寸以面积计算",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":24,"analysis":33},893666,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），斜屋面的卷材防水工程量应（ ）。",[388,390,392,394],{"key":20,"text":389,"correct":22},"按设计图示尺寸以水平投影面积计算",{"key":24,"text":391,"correct":29},"按设计图示尺寸以斜面积计算",{"key":27,"text":393,"correct":22},"扣除房上烟囱、风帽底座所占面积",{"key":31,"text":395,"correct":22},"扣除屋面小气窗、斜沟所占面积",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":27,"analysis":33},893667,"根据《建设工程工程量清单计价规范》（GB 50500—2008），膜结构屋面的工程量（ ）。",[400,402,404,406],{"key":20,"text":401,"correct":22},"按设计图示尺寸以斜面面积计算",{"key":24,"text":403,"correct":22},"按设计图示尺寸以长度计算",{"key":27,"text":405,"correct":29},"按设计图示尺寸以需要覆盖的水平面积计算",{"key":31,"text":407,"correct":22},"按设计图示尺寸以面积计算",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":24,"analysis":33},893668,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），屋面防水工程量计算，说法正确的是（ ）。",[412,414,416,418],{"key":20,"text":413,"correct":22},"斜屋面卷材防水，工程量按水平投影面积计算",{"key":24,"text":415,"correct":29},"平屋面涂膜防水，工程量不扣除烟囱所占面积",{"key":27,"text":417,"correct":22},"平屋面女儿墙弯起部分卷材防水不计工程量",{"key":31,"text":419,"correct":22},"平屋面伸缩缝卷材防水不计工程量",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":31,"analysis":33},893669,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，关于屋面防水工程量计算，说法正确的是（ ）。",[424,426,428,430],{"key":20,"text":425,"correct":22},"斜屋面卷材防水按水平投影面积计算",{"key":24,"text":427,"correct":22},"女儿墙、伸缩缝等处卷材防水弯起部分不计",{"key":27,"text":429,"correct":22},"屋面排水管按设计图示数量以根计算",{"key":31,"text":431,"correct":29},"屋面变形逢卷材防水按设计图示尺寸以长度计算",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":31,"analysis":33},893670,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，有关防腐工程量计算，说法正确的是（ ）。",[436,438,440,442],{"key":20,"text":437,"correct":22},"隔离层平面防腐，门洞开口部分按图示面积计入",{"key":24,"text":439,"correct":22},"隔离层立面防腐，门洞口侧壁部分不计算",{"key":27,"text":441,"correct":22},"砌筑沥青浸渍砖，按图示水平投影面积计算",{"key":31,"text":443,"correct":29},"立面防腐涂料，门洞侧壁按展开面积并入墙面积内",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":20,"analysis":33},893671,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，有关保温、隔热工程量计算，说法正确的是（ ）。",[448,450,452,454],{"key":20,"text":449,"correct":29},"与顶棚相连的梁的保温工程量并入顶棚工程量",{"key":24,"text":451,"correct":22},"与墙相连的柱的保温工程量按柱工程量计算",{"key":27,"text":453,"correct":22},"门窗洞口侧壁的保温工程量不计",{"key":31,"text":455,"correct":22},"保温梁工程量按设计图示尺寸以梁的中心线长度计算",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":20,"analysis":33},893672,"根据《房屋建筑与装饰工程工程最计算规范》（GB 50854—2013），关于管沟石方工程量计算，说法正确的是（ ）。",[460,462,464,466],{"key":20,"text":461,"correct":29},"按设计图示尺寸以管道中心线长度计算",{"key":24,"text":463,"correct":22},"按设计图示尺寸以截面积计算",{"key":27,"text":465,"correct":22},"有管沟设计时，按管底以上部分体积计算",{"key":31,"text":467,"correct":22},"无管沟设计时，按延长米计算",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":20,"analysis":33},893673,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），关于基坑与边坡支护工程量计算的说法，正确的是（ ）。",[472,474,476,478],{"key":20,"text":473,"correct":29},"地下连续墙按设计图示墙中心线长乘以厚度乘以槽深以体积计算",{"key":24,"text":475,"correct":22},"咬合灌注桩按设计图示尺寸以体积计算",{"key":27,"text":477,"correct":22},"喷射混凝土按设计图示尺寸以体积计算",{"key":31,"text":479,"correct":22},"预制钢筋混凝土板桩按照设计图示尺寸以体积计算",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":20,"analysis":33},893674,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），关于实心砖墙的砌墙工程量计算，说法正确的是（ ）。",[484,486,488,490],{"key":20,"text":485,"correct":29},"扣除凹进墙内的管槽、暖气槽所占体积",{"key":24,"text":487,"correct":22},"扣除伸入墙内的梁头、板头所占体积",{"key":27,"text":489,"correct":22},"扣除凸出墙面砖垛体积",{"key":31,"text":491,"correct":22},"扣除檩头、垫木所占体积",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":31,"analysis":33},893675,"根据《建设工程工程量清单计价规范》（GB 50500—2008）附录 A，关于实心砖墙高度计算的说法，正确的是（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":22},"有屋架且室内外均有天棚者，外墙高度算至屋架下弦底另加100mm",{"key":24,"text":499,"correct":22},"有屋架且无天棚者，外墙高度算至屋架下弦底另加200mm",{"key":27,"text":501,"correct":22},"无屋架者，内墙高度算至天棚底另加300mm",{"key":31,"text":503,"correct":29},"女儿墙高度从屋面板上表面算至混凝土压顶下表面",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":27,"analysis":33},893676,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），预制混凝土构件工程量计算正确的是（ ）。",[508,510,512,514],{"key":20,"text":509,"correct":22},"过梁按设计图示尺寸以中心线长度计算",{"key":24,"text":511,"correct":22},"平板按设计图示以水平投影面积计算",{"key":27,"text":513,"correct":29},"楼梯按设计图示尺寸以体积计算",{"key":31,"text":515,"correct":22},"井盖板按设计图示尺寸以面积计算",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":27,"analysis":33},893677,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），钢筋工程中钢筋网片工程量（ ）。",[520,522,524,526],{"key":20,"text":521,"correct":22},"不单独计算",{"key":24,"text":523,"correct":22},"按设计图示以数量计算",{"key":27,"text":525,"correct":29},"按设计图示面积乘以单位理论质量计算",{"key":31,"text":527,"correct":22},"按设计图示尺寸以片计算",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":20,"analysis":33},893678,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），钻孔压浆桩的工程量应为（ ）。",[532,534,536,538],{"key":20,"text":533,"correct":29},"按设计图示尺寸以桩长计算",{"key":24,"text":535,"correct":22},"按设计图示以注浆体积计算",{"key":27,"text":537,"correct":22},"以钻孔深度（含空钻长度）计算",{"key":31,"text":539,"correct":22},"按设计图示尺寸以体积计算",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":31,"analysis":33},893679,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，关于石砌体工程量计算正确的为（ ）。",[544,546,548,550],{"key":20,"text":545,"correct":22},"挡土墙按设计图示中心线长度计算",{"key":24,"text":547,"correct":22},"勒脚工程量按设计图示尺寸以延长米计算",{"key":27,"text":549,"correct":22},"石围墙内外地坪标高之差为挡土墙墙高时，墙身与基础以较低地坪标高为界",{"key":31,"text":551,"correct":29},"石护坡工程量按设计图示尺寸以体积计算",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":27,"analysis":33},893680,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），压型钢板楼板工程量应（ ）。",[556,557,559,560],{"key":20,"text":539,"correct":22},{"key":24,"text":558,"correct":22},"扣除所有柱、垛及孔洞所占体积",{"key":27,"text":333,"correct":29},{"key":31,"text":81,"correct":22},{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":27,"analysis":33},893681,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），关于金属结构工程量计算，说法正确的是（ ）。",[565,567,569,571],{"key":20,"text":566,"correct":22},"钢桁架工程量应增加铆钉质量",{"key":24,"text":568,"correct":22},"钢桁架工程量中应扣除切边部分质量",{"key":27,"text":570,"correct":29},"钢屋架工程量中螺栓质量不另计算",{"key":31,"text":572,"correct":22},"钢屋架工程量中应扣除孔眼质量",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":20,"analysis":33},893682,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），钢木屋架工程应（ ）。",[577,579,580,582],{"key":20,"text":578,"correct":29},"按设计图示数量以榀计算",{"key":24,"text":539,"correct":22},{"key":27,"text":581,"correct":22},"按设计图示尺寸以下弦中心线长度计算",{"key":31,"text":583,"correct":22},"按设计图示尺寸以上部屋面斜面积计算",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":31,"analysis":33},893683,"根据《建设工程工程量清单计价规范》（GB 50500—2008）附录 B，关于楼梯梯面装饰工程量计算的说法，正确的是（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":22},"按设计图示尺寸以楼梯（不含楼梯井）水平投影面积计算",{"key":24,"text":591,"correct":22},"按设计图示尺寸以楼梯梯段斜面积计算",{"key":27,"text":593,"correct":22},"楼梯与楼地面连接时，算至梯口梁外侧边沿",{"key":31,"text":595,"correct":29},"无梯口梁者，算至最上一层踏步边沿加300mm",[597,600,603,606,609,612],{"id":15,"name":598,"category":7,"favorite":599},"领导干部任职前廉政法规知识测试题",92,{"id":601,"name":602,"category":7,"favorite":15},595,"建筑结构与设备",{"id":604,"name":605,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":607,"name":608,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":610,"name":611,"category":7,"favorite":8},534,"BIM工程师",{"id":613,"name":611,"category":7,"favorite":8},535]