[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-580-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},580,"[土木建筑工程]建设工程计量与计价实务","建筑工程",0,12,50,1733,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,321,332,344,356,368,376,388,400,412,424,436,448,460,472,484,496,505,517,529,541,553,565,577,589,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},893528,1,"单选题","根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013，关于金属结构工程量计算，说法正确的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","钢桁架工程量应增加铆钉质量",false,{"key":24,"text":25,"correct":22},"B","钢桁架工程量中应扣除切边部分质量",{"key":27,"text":28,"correct":29},"C","钢屋架工程量中螺栓质量不另计算",true,{"key":31,"text":32,"correct":22},"D","钢屋架工程量中应扣除孔眼质量","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},893529,"根据《建筑工程建筑面积计算规范》GB／T50353—2013，关于室外楼梯的建筑面积计算的说法，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"依附建筑物自然层，并按其水平投影面积计算建筑面积",{"key":24,"text":41,"correct":29},"依附建筑物自然层，并按其水平投影面积的1\u002F2计算建筑面积",{"key":27,"text":43,"correct":22},"室外楼梯各层均不计算建筑面积",{"key":31,"text":45,"correct":22},"室外楼梯最上层不计算建筑面积",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},893530,"根据《房屋建筑与装饰工程工程量计算规范》（GB50584—2013），某钢筋混凝土梁长为12000mm。涉及保护层厚为25mm，钢筋为A10@300，则该梁所配钢筋数量应为（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"40根",{"key":24,"text":53,"correct":29},"41根",{"key":27,"text":55,"correct":22},"42根",{"key":31,"text":57,"correct":22},"300根",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},893531,"根据《房屋建筑与装饰工程量计算规范》GB50854—2013，关于地基处理工程量计算的说法，正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":29},"换填垫层按照图示尺寸以体积计算",{"key":24,"text":65,"correct":22},"铺设土工合成材料按图示尺寸以铺设长度计算",{"key":27,"text":67,"correct":22},"强夯地基按图示处理范围和深度以体积计算",{"key":31,"text":69,"correct":22},"振冲密实（不填料）的按图示处理范围以体积计算",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},893532,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），砌筑工程垫层工程量应（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"按基坑（槽）底设计图示尺寸以面积计算",{"key":24,"text":77,"correct":22},"按垫层设计宽度乘以中心线长度以面积计算",{"key":27,"text":79,"correct":29},"按设计图示尺寸以体积计算",{"key":31,"text":81,"correct":22},"按实际铺设垫层面积计算",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},893533,"在计算钢筋工程量时，低合金钢筋采用后张混凝土自锚时，钢筋长度按孔道长度（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":29},"增加0．35m",{"key":24,"text":89,"correct":22},"增加0．30m",{"key":27,"text":91,"correct":22},"减少0．30m",{"key":31,"text":93,"correct":22},"减少0．35m",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},893534,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），混凝土框架柱工程量应（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"按设计图示尺寸扣除板厚所占部分以体积计算",{"key":24,"text":101,"correct":22},"区别不同截面以长度计算",{"key":27,"text":103,"correct":29},"按设计图示尺寸不扣除梁所占部分以体积计算",{"key":31,"text":105,"correct":22},"按柱基上表面至梁底面部分以体积计算",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},893535,"根据《房屋建筑与装饰工程工程量计算规范》GB 50854—2013，土石方工程中工程量可以长度计算的有（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"冻土开挖",{"key":24,"text":113,"correct":22},"挖淤泥、流砂",{"key":27,"text":115,"correct":22},"土石方回填",{"key":31,"text":117,"correct":29},"管沟石方",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},893536,"根据《房屋建筑与装饰工程工程量计算规范》GB 50854—2013，下列关于油漆、涂料、裱糊工程的叙述错误的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"筒子板油漆按没计图示尺寸以面积计算",{"key":24,"text":125,"correct":22},"木间壁油漆按设计图示尺寸以单面外围面积计算",{"key":27,"text":127,"correct":22},"衣柜油漆按设计图示尺寸以油漆部分展开面积计算",{"key":31,"text":129,"correct":29},"木地板油漆按设计图示尺寸以面积计算。空洞、空圈的开口部分不计算",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},893537,"根据《混凝土结构设计规范（2015年版）》（GB 50010—2010），设计使用年限为50年的二b环境类别条件下，混凝土梁柱最外层钢筋保护层最小厚度应为（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"25mm",{"key":24,"text":137,"correct":29},"35mm",{"key":27,"text":139,"correct":22},"40mm",{"key":31,"text":141,"correct":22},"50mm",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},893538,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013规定，关于砖砌体工程量计算说法正确的为（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"砖基础工程量中不含基础砂浆防潮层所占体积",{"key":24,"text":149,"correct":29},"使用同一种材料的基础与墙身以设计室内地面为分界",{"key":27,"text":151,"correct":22},"实心砖墙的工程量中不应计入凸出墙面的砖垛体积",{"key":31,"text":153,"correct":22},"坡屋面有屋架的外墙高由基础顶面算至屋架下弦底面",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},893539,"关于石砌体工程量计算说法错误的为（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"石砌体中工作内容包括勾缝",{"key":24,"text":161,"correct":22},"基础与勒脚应以设计室外地坪为界",{"key":27,"text":163,"correct":22},"勒脚与墙身应以设计室内地面为界",{"key":31,"text":165,"correct":29},"工程量计算时石墙与实心砖柱一致",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},893540,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），预制混凝土构件工程量计算正确的是（）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"过梁按照设计图示尺寸以中心线长度计算",{"key":24,"text":173,"correct":22},"平板按照设计图示以水平投影面积计算",{"key":27,"text":175,"correct":29},"楼梯按照设计图示尺寸以体积计算",{"key":31,"text":177,"correct":22},"D井盖板按设计图示尺寸以面积计算",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},893541,"在进行地基处理时，工程量计算既可用体积，又可用面积计算的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"换填垫层",{"key":24,"text":185,"correct":22},"铺设土工合成材料",{"key":27,"text":187,"correct":22},"振冲桩",{"key":31,"text":189,"correct":29},"褥垫层",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},893542,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,钢筋工程中钢筋网片工程量（）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"不单独计算",{"key":24,"text":197,"correct":22},"按设计图以数量计算",{"key":27,"text":199,"correct":29},"按设计图示面积乘以单位理论质量计算",{"key":31,"text":201,"correct":22},"按设计图示尺寸以片计算",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},893543,"下列措施项目中，费用的计算不使用日历天数的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":29},"满堂脚手架",{"key":24,"text":209,"correct":22},"施工排水",{"key":27,"text":211,"correct":22},"垂直运输",{"key":31,"text":213,"correct":22},"施工降水",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},893544,"基地处理中深层搅拌桩，按设计图示尺寸以（ ）计算。",[218,220,222,224],{"key":20,"text":219,"correct":22},"面积",{"key":24,"text":221,"correct":22},"体积",{"key":27,"text":223,"correct":29},"桩长",{"key":31,"text":225,"correct":22},"质量",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},893545,"根据《房屋建筑与装饰工程工程量计算规范》GB 508542013，下列分部分项工程中，（ ）是以平方米为计量单位的。",[230,232,234,236],{"key":20,"text":231,"correct":22},"现浇混凝土天沟",{"key":24,"text":233,"correct":22},"现浇混凝土雨篷",{"key":27,"text":235,"correct":22},"现浇混凝土板后浇带",{"key":31,"text":237,"correct":29},"砖散水",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},893546,"根据《房屋建筑与装饰工程工程量清单计算规范》GB50854—2013，钢板桩的计算规则是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"按设计图示尺寸以桩长（包括桩尖）计算",{"key":24,"text":245,"correct":22},"按设计根数计算",{"key":27,"text":247,"correct":22},"按设计图示尺寸以接头数量",{"key":31,"text":249,"correct":29},"按设计图示尺寸以质量计算",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},893547,"根据《房屋建筑与装饰工程量计量规范》GB50854—2013，关于现浇混凝土柱高计算，说法正确的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"有梁板的柱高自楼板上表面至上一层楼板下表面之间的高度计算",{"key":24,"text":257,"correct":22},"无梁板的柱高自楼板上表面至上一层楼板下表面之间的高度计算",{"key":27,"text":259,"correct":22},"框架柱的柱高自柱基上表面至柱顶高度减去各层板厚的高度计算",{"key":31,"text":261,"correct":29},"构造柱按全高计算",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},893548,"根据《房屋建筑与装饰工程工程量计算规范》GB 50854—2013，某建筑物外墙外边线的尺寸为60m×15m，其平整场地的清单工程量为（ ）m2。",[266,268,270,272],{"key":20,"text":267,"correct":29},"900",{"key":24,"text":269,"correct":22},"1054",{"key":27,"text":271,"correct":22},"1216",{"key":31,"text":273,"correct":22},"1350",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},893549,"一建筑物，外墙轴线尺寸为9．60mm×5．40mm，外墙均为240mm厚，内、外墙及门洞面积如下：外墙上有门二樘计0．48m2，120mm内墙门一樘0．29 m2，240mm内墙横截面共计2．48m2，120mm内墙横截面计0．33m2。则该建筑地面水泥砂浆抹面工程量为（ ）m2。",[278,280,282,284],{"key":20,"text":279,"correct":29},"45．82",{"key":24,"text":281,"correct":22},"45．49",{"key":27,"text":283,"correct":22},"44．72",{"key":31,"text":285,"correct":22},"44．62",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":31,"analysis":33},893550,"基坑与边坡支护计算时以立方米为单位的是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"咬合灌注桩",{"key":24,"text":293,"correct":22},"型钢桩",{"key":27,"text":295,"correct":22},"钢支撑",{"key":31,"text":297,"correct":29},"钢筋混凝土支撑",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},893551,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013规定，关于石方的项目列项或工程量计算正确的为（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":29},"山坡凿石按一般石方列项",{"key":24,"text":305,"correct":22},"考虑石方运输，石方体积需折算为虚方体积计算",{"key":27,"text":307,"correct":22},"管沟石方均按一般石方列项",{"key":31,"text":309,"correct":22},"基坑底面积超过120m2的按一般石方列项",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":27,"analysis":33},893552,"在抗震等级为一级的地区，当梁截面高度为450mm时，其箍筋的加密区范围最小为（ ）mm。",[314,316,318,319],{"key":20,"text":315,"correct":22},"500",{"key":24,"text":317,"correct":22},"675",{"key":27,"text":267,"correct":29},{"key":31,"text":320,"correct":22},"1000",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":24,"analysis":33},893553,"根据《房屋建筑与装饰工程工程量计算规范》GB 50854—2013的规定，强夯地基应按（ ）。",[325,326,328,330],{"key":20,"text":79,"correct":22},{"key":24,"text":327,"correct":29},"按设计图示尺寸以面积计算",{"key":27,"text":329,"correct":22},"按实际尺寸以面积计算",{"key":31,"text":331,"correct":22},"按设计图示尺寸外扩2m以面积计算",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":31,"analysis":33},893554,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013规定，有关木结构工程量计算，说法正确的是（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"屋面木基层按设计图示尺寸以水平投影面积计算",{"key":24,"text":339,"correct":22},"木楼梯按设计图示尺寸以展开面积计算",{"key":27,"text":341,"correct":22},"不扣除宽度小于500mm的楼梯井，伸入墙内部分不计算",{"key":31,"text":343,"correct":29},"木屋架工程量以榀计量时，按设计图示数量计算",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},893555,"编制钢筋工程量清单时，适宜采用暂估量加签证处理的钢筋是（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":29},"支撑双层钢筋用的“铁马”",{"key":24,"text":351,"correct":22},"伸出构件的锚固钢筋",{"key":27,"text":353,"correct":22},"设计注明的搭接钢筋",{"key":31,"text":355,"correct":22},"规范规定的搭接钢筋",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":31,"analysis":33},893556,"施工合同履行期间，下列不属于工程计量范围的是（）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"工程变更修改的工程量清单内容",{"key":24,"text":363,"correct":22},"合同文件中规定的各种费用支付项目",{"key":27,"text":365,"correct":22},"暂列金额中的专业工程",{"key":31,"text":367,"correct":29},"擅自超出施工图纸施工的工程",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":24,"analysis":33},893557,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013）。某钢筋混凝土梁长为12000mm。设计保护层厚为25mm，钢筋为A10@300，则该梁所配箍筋数量为（ ）。",[372,373,374,375],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":29},{"key":27,"text":55,"correct":22},{"key":31,"text":57,"correct":22},{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":27,"analysis":33},893558,"下列油漆工程量计算规则中，正确的说法是（ ）。",[380,382,384,386],{"key":20,"text":381,"correct":22},"门、窗油漆按展开面积计算",{"key":24,"text":383,"correct":22},"木扶手油漆按平方米计算",{"key":27,"text":385,"correct":29},"金属面油漆按构件质量计算",{"key":31,"text":387,"correct":22},"抹灰面油漆按图示尺寸以面积和遍数计算",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":31,"analysis":33},893559,"根据《建设工程工程量清单计价规范》的有关规定，天棚工程量清单计算中，下面说法正确的是（ ）。",[392,394,396,398],{"key":20,"text":393,"correct":22},"天棚工程中的灯槽、跌级展开增加的面积另行计算并入天棚工程工程量",{"key":24,"text":395,"correct":22},"扣除间壁墙所占面积",{"key":27,"text":397,"correct":22},"天棚检查口、灯槽单独列项",{"key":31,"text":399,"correct":29},"天棚工程中的灯槽、跌级的面积不展开计算",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":31,"analysis":33},893560,"柱面装饰板工程量应按设计图示饰面外围尺寸以面积计算，且（ ）。",[404,406,408,410],{"key":20,"text":405,"correct":22},"扣除柱帽、柱墩面积",{"key":24,"text":407,"correct":22},"扣除柱帽、不扣除柱墩面积",{"key":27,"text":409,"correct":22},"扣除柱墩、不扣除柱帽面积",{"key":31,"text":411,"correct":29},"柱帽、柱墩并入相应柱饰面工程量内",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":27,"analysis":33},893561,"根据《建设工程工程量清单计价规范》的有关规定，工程量清单计算时，附墙柱侧面抹灰（ ）。",[416,418,420,422],{"key":20,"text":417,"correct":22},"不计算工程量，在综合单价中考虑",{"key":24,"text":419,"correct":22},"计算工程量后并入柱面抹灰工程量",{"key":27,"text":421,"correct":29},"计算工程量后并入墙面抹灰工程量",{"key":31,"text":423,"correct":22},"计算工程量后并入零星抹灰工程量",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":20,"analysis":33},893562,"计算装饰工程楼地面块料面层工程量时，应扣除（ ）。",[428,430,432,434],{"key":20,"text":429,"correct":29},"凸出地面的设备基础",{"key":24,"text":431,"correct":22},"间壁墙",{"key":27,"text":433,"correct":22},"0.3m2以内附墙烟囱",{"key":31,"text":435,"correct":22},"0.3m2以内柱",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":24,"analysis":33},893563,"根据《建设工程工程量清单计价规范》的有关规定，计算墙体保温隔热工程量清单时，对于有门窗洞口且其侧壁需作保温的，正确的计算方法是（ ）",[440,442,444,446],{"key":20,"text":441,"correct":22},"扣除门窗洞口所占面积，不计算其侧壁保温隔热工程量",{"key":24,"text":443,"correct":29},"扣除门窗洞口所占面积，计算其侧壁保温隔热工程量，将其并入保温墙体工程量内",{"key":27,"text":445,"correct":22},"不扣除门窗洞口所占面积，不计算其侧壁保温隔热工程量",{"key":31,"text":447,"correct":22},"不扣除门窗洞口所占面积，计算其侧壁保温隔热工程量",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":31,"analysis":33},893564,"工程量按体积计算的是（ ）。",[452,454,456,458],{"key":20,"text":453,"correct":22},"防腐混凝土面层",{"key":24,"text":455,"correct":22},"防腐砂浆面层",{"key":27,"text":457,"correct":22},"块料防腐面层",{"key":31,"text":459,"correct":29},"砌筑沥青浸渍砖",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":24,"analysis":33},893565,"根据《建设工程工程量清单计价规范》，钢筋工程量的计算，正确的是（ ）。",[464,466,468,470],{"key":20,"text":465,"correct":22},"碳素钢丝束采用镦头锚具时，其长度按孔道长度增加0.30m计算",{"key":24,"text":467,"correct":29},"直径为d的HPB300光圆钢筋，端头90°弯钩形式，其弯钩增加长度为3.5d",{"key":27,"text":469,"correct":22},"弯起钢筋增加的长度为S-Ｌ，弯曲度数为30°时，弯起增加长度为0.414h",{"key":31,"text":471,"correct":22},"钢筋混凝土梁柱的箍筋长度仅按梁柱设计断面外围周长计算",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":24,"analysis":33},893566,"后张法预应力钢筋混凝土梁长6m，留设直线孔道，选用低合金钢筋作预应力筋，一端采用螺杆锚具，另一端采用镦头插片，则预应力钢筋单根长度为（ ）。",[476,478,480,482],{"key":20,"text":477,"correct":22},"5.65m",{"key":24,"text":479,"correct":29},"6.00m",{"key":27,"text":481,"correct":22},"6.15m",{"key":31,"text":483,"correct":22},"6.30m",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":20,"analysis":33},893567,"混凝土后浇带以体积计算，通常包括梁后浇带、板后浇带，还有（ ）。",[488,490,492,494],{"key":20,"text":489,"correct":29},"墙后浇带",{"key":24,"text":491,"correct":22},"雨篷后浇带",{"key":27,"text":493,"correct":22},"柱后浇带",{"key":31,"text":495,"correct":22},"楼梯后浇带",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":31,"analysis":33},893568,"工程量按面积以平方米为计量单位计算的有（ ）",[500,501,502,503],{"key":20,"text":231,"correct":22},{"key":24,"text":233,"correct":22},{"key":27,"text":235,"correct":22},{"key":31,"text":504,"correct":29},"砖砌散水",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":27,"analysis":33},893569,"计算现浇混凝土楼梯工程量时，正确的做法是（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":22},"以斜面积计算",{"key":24,"text":512,"correct":22},"扣除宽度小于500mm的楼梯井",{"key":27,"text":514,"correct":29},"按面积计算时，伸入墙内部分不另增加",{"key":31,"text":516,"correct":22},"整体楼梯不包括连接梁",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":27,"analysis":33},893570,"现浇钢筋混凝土楼梯的工程量应按设计图示尺寸（ ）。",[521,523,525,527],{"key":20,"text":522,"correct":22},"以体积计算，不扣除宽度小于500mm的楼梯井",{"key":24,"text":524,"correct":22},"以体积计算，扣除宽度小于500mm的楼梯井",{"key":27,"text":526,"correct":29},"以水平投影面积计算，不扣除宽度小于500mm的楼梯井",{"key":31,"text":528,"correct":22},"以水平投影面积计算，扣除宽度小于500mm的楼梯井",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":31,"analysis":33},893571,"下列现浇混凝土板工程量计算规则中，正确的说法是（ ）。",[533,535,537,539],{"key":20,"text":534,"correct":22},"天沟、挑檐按设计图示尺寸以面积计算",{"key":24,"text":536,"correct":22},"雨篷、阳台板按设计图示尺寸以墙外部分体积计算",{"key":27,"text":538,"correct":22},"现浇挑檐、天沟板与板连接时，以板的外边线为界",{"key":31,"text":540,"correct":29},"雨篷、阳台板包括伸出墙外的阳台牛腿和雨篷反挑檐工程量",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":20,"analysis":33},893572,"现浇混凝土挑檐、雨篷与圈梁连接时，其工程量计算的分界线应为（ ）。",[545,547,549,551],{"key":20,"text":546,"correct":29},"圈梁外边线",{"key":24,"text":548,"correct":22},"圈梁内边线",{"key":27,"text":550,"correct":22},"外墙外边线",{"key":31,"text":552,"correct":22},"板内边线",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":27,"analysis":33},893573,"现浇钢筋混凝土无梁楼板的混凝土工程量应为（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"按板的体积计算",{"key":24,"text":560,"correct":22},"按板的体积乘以1.22的系数计算",{"key":27,"text":562,"correct":29},"按板和柱帽体积之和计算",{"key":31,"text":564,"correct":22},"按不同板厚以水平投影面积计算",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":27,"analysis":33},893574,"根据《建设工程工程量清单计价规范》，以下关于砖砌体工程量计算，正确的说法是（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"砖砌台阶按设计图示尺寸以体积计算",{"key":24,"text":572,"correct":22},"砖散水按设计图示尺寸以体积计算",{"key":27,"text":574,"correct":29},"砖地沟按设计图示尺寸以中心线长度计算",{"key":31,"text":576,"correct":22},"砖明沟按设计图示尺寸以水平面积计算",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":24,"analysis":33},893575,"计算空斗墙的工程量（ ）。",[581,583,585,587],{"key":20,"text":582,"correct":22},"应按设计图示尺寸以实砌体积计算",{"key":24,"text":584,"correct":29},"应按设计图示尺寸以外形体积计算",{"key":27,"text":586,"correct":22},"应扣除内外墙交接处部分",{"key":31,"text":588,"correct":22},"应扣除门窗洞口立边部分",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":24,"analysis":33},893576,"计算砌块墙外墙高度时，正确的方法是（ ）。",[593,595,597,599],{"key":20,"text":594,"correct":22},"屋面无天棚者外墙高度算至屋架下弦底另加200mm",{"key":24,"text":596,"correct":29},"平屋面外墙高度算至钢筋混凝土板底",{"key":27,"text":598,"correct":22},"平屋面外墙高度算至钢筋混凝土板顶",{"key":31,"text":600,"correct":22},"女儿墙从屋面板上表面算至压顶上表面",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":31,"analysis":33},893577,"以下各项中，应计入砌筑墙体工程量的是（ ）。",[605,607,609,611],{"key":20,"text":606,"correct":22},"突出墙面的窗台虎头砖",{"key":24,"text":608,"correct":22},"腰线的突出部分",{"key":27,"text":610,"correct":22},"混凝土圈梁",{"key":31,"text":612,"correct":29},"附墙柱垛",[614,617,620,623,626,629],{"id":15,"name":615,"category":7,"favorite":616},"领导干部任职前廉政法规知识测试题",92,{"id":618,"name":619,"category":7,"favorite":15},595,"建筑结构与设备",{"id":621,"name":622,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":624,"name":625,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":627,"name":628,"category":7,"favorite":8},534,"BIM工程师",{"id":630,"name":628,"category":7,"favorite":8},535]