[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-580-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},580,"[土木建筑工程]建设工程计量与计价实务","建筑工程",0,11,50,1733,[13,34,46,58,70,82,94,106,118,130,138,150,162,174,186,198,206,218,230,242,254,266,278,290,302,314,326,338,350,362,374,386,398,410,422,434,446,458,470,482,494,505,517,529,541,553,565,577,588,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},893478,1,"单选题","根据《建筑工程建筑面积计算规则》（GB\u002FT50353），下列关于建筑物雨棚结构的建筑面积计算，正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","有柱雨篷按结构外边线计算",true,{"key":24,"text":25,"correct":26},"B","无柱雨篷按雨篷水平投影面积计算",false,{"key":28,"text":29,"correct":26},"C","雨篷外边线至外墙结构外边线不足2.10m不计算面积",{"key":31,"text":32,"correct":26},"D","雨篷外边线至外墙结构外边线超过2.10m按投影计算面积","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},893479,"根据《建筑工程建筑面积计算规则》（GB\u002FT50353），以下关于建筑面积计算说法正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"建筑物外有围护结构的挑廊按其外围水平面积的一半计算建筑面积",{"key":24,"text":41,"correct":22},"室外楼梯应并入所依附建筑物自然层，并应按其水平投影面积的1\u002F2计算建筑面积",{"key":28,"text":43,"correct":26},"建筑物前的混凝土台阶按其水平投影面积的一半计算建筑面积",{"key":31,"text":45,"correct":26},"建筑物间有顶盖的架空走廊按其顶盖水平投影面积的一半计算建筑面积",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},893480,"根据《建筑工程建筑面积计算规则》（GB\u002FT50353），以下应计算全部建筑面积的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"层高为2.3m的地下商店",{"key":24,"text":53,"correct":26},"层高为2.1m的半地下贮藏室",{"key":28,"text":55,"correct":26},"屋面上部有顶盖和1.4m高钢管围栏的凉棚",{"key":31,"text":57,"correct":26},"外挑宽度1.6m的悬挑雨蓬",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},893481,"根据《建筑工程建筑面积计算规则》（GB\u002FT50353），单层建筑物内有局部楼层时，其建筑面积计算，正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"有围护结构的按底板水平面积计算",{"key":24,"text":65,"correct":26},"无围护结构的不计算建筑面积",{"key":28,"text":67,"correct":26},"层高超过2.10m计算全面积",{"key":31,"text":69,"correct":22},"层高不足2.20m计算1\u002F2面积",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},893482,"根据《建筑工程建筑面积计算规范》（GB\u002FT 50353-2013）,有顶盖无围护结构的货棚，其建筑面积应（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"按其顶盖水平投影面积的1\u002F2计算",{"key":24,"text":77,"correct":26},"按其顶盖水平投影面积计算",{"key":28,"text":79,"correct":26},"按柱外围水平面积的1\u002F2计算",{"key":31,"text":81,"correct":26},"按柱外围水平面积计算",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},893483,"根据《建筑工程建筑面积计算规范》（GB\u002FT50353-2013），关于建筑外有永久顶盖无围护结构的走廊，建筑面积计算说法正确的是（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"按结构底板水平面积1\u002F2计算",{"key":24,"text":89,"correct":26},"按顶盖水平面积计算",{"key":28,"text":91,"correct":26},"层高超过2.1m的计算全面积",{"key":31,"text":93,"correct":26},"层高不超过2m的不计算建筑面积",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},893484,"根据《建筑工程建筑面积计算规范》（GB\u002FT 50353-2013）规定，层高在 2.20m及以上有围护结构的舞台灯光控制室，建筑面积计算正确的是（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"按围护结构外围水平面积计算",{"key":24,"text":101,"correct":26},"按围护结构外围水平面积的1\u002F2计算",{"key":28,"text":103,"correct":26},"按控制室底板水平面积计算",{"key":31,"text":105,"correct":26},"按控制室底板水平面积的1\u002F2计算",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},893485,"根据《建筑工程建筑面积计算规范》（GB\u002FT 50353-2013），高度为 2.10m的立体书库结构层,其建筑面积（）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"不予计算",{"key":24,"text":113,"correct":22},"按1\u002F2面积计算",{"key":28,"text":115,"correct":26},"按全面积计算",{"key":31,"text":117,"correct":26},"只计算一层面积",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},893486,"根据《建筑工程建筑面积计算规范》（GB\u002FT50353-2013）规定，建筑物的建筑面积 应按自然层外墙结构外围水平面积之和计算。以下说法正确的是（）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"建筑物高度为2.00m部分，应计算全面积",{"key":24,"text":125,"correct":26},"建筑物高度为1.80m部分不计算面积",{"key":28,"text":127,"correct":26},"建筑物高度为1.20m部分不计算面积",{"key":31,"text":129,"correct":22},"建筑物高度为2.10m部分应计算1\u002F2面积",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},893487,"根据《建筑与工程建筑面积计算规范》（GB\u002FT 50353—2013），有顶盖无围护结构的货棚，其建筑面积应（ ）。",[134,135,136,137],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":26},{"key":28,"text":79,"correct":26},{"key":31,"text":81,"correct":26},{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":28,"analysis":33},893488,"根据《建筑工程建筑面积计算规范》（GB\u002FT 50353—2013），内部连通的高低联跨建筑物内的变形缝应（ ）。",[142,144,146,148],{"key":20,"text":143,"correct":26},"计入高跨面积",{"key":24,"text":145,"correct":26},"高低跨平均计算",{"key":28,"text":147,"correct":22},"计入低跨面积",{"key":31,"text":149,"correct":26},"不计算面积",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":31,"analysis":33},893489,"根据《建筑工程建筑面积计算规范》（GB\u002FT 50353—2013）规定，建筑物的建筑面积应按自然层外墙结构外围水平面积之和计算。以下说法正确的是（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":26},"建筑高度为2.00m部分，应计算全面积",{"key":24,"text":157,"correct":26},"建筑高度为1.80m部分不计算面积",{"key":28,"text":159,"correct":26},"建筑高度为1.20m部分不计算面积",{"key":31,"text":161,"correct":22},"建筑高度为2.10m部分应计算1\u002F2面积",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":24,"analysis":33},893490,"根据《建筑工程建筑面积计算规范》（GB\u002FT 50353—2013）规定，地下室、半地下室建筑面积计算正确的是（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":26},"层高不足1.80m者不计算面积",{"key":24,"text":169,"correct":22},"层高为2.10m的部位计算1\u002F2面积",{"key":28,"text":171,"correct":26},"层高2.10m的部位应计算全面积",{"key":31,"text":173,"correct":26},"层高2.10m以上的部位应计算全面积",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},893491,"根据有关规定，国有投资建设项目，其施工图建筑面积不得超过初步设计建筑面积的一定比例，该比例为（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":26},"3%",{"key":24,"text":181,"correct":22},"5%",{"key":28,"text":183,"correct":26},"7%",{"key":31,"text":185,"correct":26},"10%",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},893492,"根据《建筑工程建筑面积计算规范》（GB\u002FT 50353—2013），建筑物间的架空走廊无围护结构、有围护设施的，其建筑面积应（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":26},"按护栏外围水平面积的1\u002F2计算",{"key":24,"text":193,"correct":22},"按结构底板水平投影面积的1\u002F2计算",{"key":28,"text":195,"correct":26},"按护栏外围水平面积计算全面积",{"key":31,"text":197,"correct":26},"按结构底板水平投影面积计算全面积",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":20,"analysis":33},893493,"根据《建筑工程建筑面积计算规范》（GB 50854—2013）规定，层高在2.20m及以上有围护结构的舞台灯光控制室建筑面积计算正确的是（ ）。",[202,203,204,205],{"key":20,"text":99,"correct":22},{"key":24,"text":101,"correct":26},{"key":28,"text":103,"correct":26},{"key":31,"text":105,"correct":26},{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":20,"analysis":33},893494,"挑出宽度在（ ）m以下的无柱雨篷，可不计算建筑面积。",[210,212,214,216],{"key":20,"text":211,"correct":22},"2.10",{"key":24,"text":213,"correct":26},"2.20",{"key":28,"text":215,"correct":26},"0.45",{"key":31,"text":217,"correct":26},"1.50",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":24,"analysis":33},893495,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013规定，墙面抹灰按设计图示尺寸以面积计，但应扣除（ ）。",[222,224,226,228],{"key":20,"text":223,"correct":26},"踢脚线",{"key":24,"text":225,"correct":22},"门窗洞口",{"key":28,"text":227,"correct":26},"构件与墙交界面",{"key":31,"text":229,"correct":26},"挂镜线",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":31,"analysis":33},893496,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013，某建筑物首层建筑面积为2000m2场地内有部分150mm以内的挖土用6．5t自卸汽车（斗容量4．5m3）运土，弃土共计20车，运距150m，则平整场地的工程量应为（ ）m2。",[234,236,238,240],{"key":20,"text":235,"correct":26},"69．2",{"key":24,"text":237,"correct":26},"83．3",{"key":28,"text":239,"correct":26},"90",{"key":31,"text":241,"correct":22},"2000",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":28,"analysis":33},893497,"关于螺栓、铁件工程量计量的说法，正确的是（ ）。",[246,248,250,252],{"key":20,"text":247,"correct":26},"螺栓以个计量，按数量计算",{"key":24,"text":249,"correct":26},"机械连接，按设计图示尺寸以质量计算",{"key":28,"text":251,"correct":22},"预埋铁件，按设计图示尺寸以质量计算",{"key":31,"text":253,"correct":26},"螺栓、预埋铁件和机械连接以个计量，按数量计算",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":20,"analysis":33},893498,"混凝土结构中的纵向受压钢筋，当计算中充分利用其抗压强度时，锚固长度不应小于相应受拉锚固长度的（ ）。",[258,260,262,264],{"key":20,"text":259,"correct":22},"70％",{"key":24,"text":261,"correct":26},"75％",{"key":28,"text":263,"correct":26},"80％",{"key":31,"text":265,"correct":26},"90％",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":31,"analysis":33},893499,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013。关于门窗工程量计算，说法正确的是（ ）。",[270,272,274,276],{"key":20,"text":271,"correct":26},"木质门带套工程量应按套外围面积计算",{"key":24,"text":273,"correct":26},"门窗工程量计量单位与项目特征描述无关",{"key":28,"text":275,"correct":26},"门窗工程量按图示尺寸以面积为单位时，项目特征必须描述洞口尺寸",{"key":31,"text":277,"correct":22},"门窗工作量以数量“樘”为单位时，项目特征必须描述洞口尺寸",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":24,"analysis":33},893500,"有一两砖厚墙体，长8m，高5m，开有门窗总面积为6m2，两个通风洞口各为0．25m2，门窗洞口上的钢筋混凝土过梁总体积为0．5m3。则该段墙体的砌砖工程量为（ ）m3。",[282,284,286,288],{"key":20,"text":283,"correct":26},"16．5",{"key":24,"text":285,"correct":22},"16．16",{"key":28,"text":287,"correct":26},"15．92",{"key":31,"text":289,"correct":26},"16．75",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":28,"analysis":33},893501,"已知某现浇钢筋混凝土梁长6000mm，截面为800mm×1200mm，设计用φ12mm箍筋，单位理论重量为0．888kg／m，单根箍筋两个弯钩增加长度共160mm，钢筋保护层厚为25mm，箍筋间距为200mm，则10根梁的箍筋工程量为（ ）t。",[294,296,298,300],{"key":20,"text":295,"correct":26},"1．042",{"key":24,"text":297,"correct":26},"1．047",{"key":28,"text":299,"correct":22},"1．076",{"key":31,"text":301,"correct":26},"1．123",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":20,"analysis":33},893502,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013规定，关于天棚装饰工程量计算，说法正确的是（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":22},"回风口按设计图示数量计算",{"key":24,"text":309,"correct":26},"灯带（槽）按设计图示尺寸以延长米计算",{"key":28,"text":311,"correct":26},"送风口按设计图示尺寸以结构内边线面积计算",{"key":31,"text":313,"correct":26},"灯带（槽）按设计图示尺寸以框中心线面积计算",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":24,"analysis":33},893503,"下列关于钢网架工程量计量的说法，错误的是（ ）。",[318,320,322,324],{"key":20,"text":319,"correct":26},"钢网架项目适用于一般钢网架和不锈钢网架",{"key":24,"text":321,"correct":22},"钢网架工程量按设计图示尺寸以质量计算，扣除孔眼的质量",{"key":28,"text":323,"correct":26},"节点连接方式的钢网架可以采用钢网架项目",{"key":31,"text":325,"correct":26},"钢网架工程量按设计图示尺寸以质量计算，焊条、铆钉等不另增加质量",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":20,"analysis":33},893504,"某现浇混凝土梁，截面周长为1500mm，保护层厚度为25mm，采用的双肢箍筋，直径为8mm，弯钩增加长度为90mm，计算单根箍筋长度为（ ）mm。",[330,332,334,336],{"key":20,"text":331,"correct":22},"1448",{"key":24,"text":333,"correct":26},"1458",{"key":28,"text":335,"correct":26},"1480",{"key":31,"text":337,"correct":26},"1630",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":31,"analysis":33},893505,"某建筑采用现浇整体楼梯，楼梯共4层自然层，楼梯间净长6m，净宽4m，楼梯井宽450mm，长3m。则该现浇楼梯的混凝土工程量为（ ）m2。",[342,344,346,348],{"key":20,"text":343,"correct":26},"22．65",{"key":24,"text":345,"correct":26},"24．00",{"key":28,"text":347,"correct":26},"67．95",{"key":31,"text":349,"correct":22},"72．00",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":24,"analysis":33},893506,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013，屋面防水工程量计算，说法正确的是（ ）。",[354,356,358,360],{"key":20,"text":355,"correct":26},"斜屋面卷材防水，工程量按水平投影面积计算",{"key":24,"text":357,"correct":22},"平屋面涂膜防水，工程量不扣除烟囱所占面积",{"key":28,"text":359,"correct":26},"平屋面女儿墙弯起部分卷材防水不计工程量",{"key":31,"text":361,"correct":26},"平屋面伸缩缝卷材防水不计工程量",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":20,"analysis":33},893507,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013，关于刷喷涂料工程量计算，说法正确的是（ ）。",[366,368,370,372],{"key":20,"text":367,"correct":22},"木材构件喷刷防火涂料按设计图示以面积计算",{"key":24,"text":369,"correct":26},"金属构件刷防火涂料按构件单面外围面积计算",{"key":28,"text":371,"correct":26},"空花格、栏杆刷涂料按设计图示尺寸以双面面积计算",{"key":31,"text":373,"correct":26},"线条刷涂料按设计展开面积计算",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":24,"analysis":33},893508,"根据《房屋建筑与装饰工程工程量计算规范》GB 50854—2013，下列关于柱帽的工程量计算叙述错误的是（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":26},"现浇混凝土无梁板按板和柱帽体积之和计算",{"key":24,"text":381,"correct":22},"现浇混凝土无梁板的柱高，应自柱基上表面至柱帽上表面之间的高度计算",{"key":28,"text":383,"correct":26},"柱饰面按设计图示饰面外围尺寸以面积计算，柱帽并入相应柱饰面工程量内",{"key":31,"text":385,"correct":26},"保温隔热天棚按设计图示尺寸以面积计算，柱帽保温隔热并入天棚保温隔热工程量内",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":24,"analysis":33},893509,"某建筑工程挖土方工程量需要通过现场签证核定，已知用斗容量为1．5m3的轮胎式装载机运土500车，则挖土工程量应为（ ）m3。",[390,392,394,396],{"key":20,"text":391,"correct":26},"501．92",{"key":24,"text":393,"correct":22},"576．92",{"key":28,"text":395,"correct":26},"623．15",{"key":31,"text":397,"correct":26},"750",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":20,"analysis":33},893510,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），钻孔压浆桩的工程量应为（）。",[402,404,406,408],{"key":20,"text":403,"correct":22},"按设计图示尺寸以桩长计算",{"key":24,"text":405,"correct":26},"设设计图示以注浆体积计算",{"key":28,"text":407,"correct":26},"以钻孔深度（含空钻长度）计算",{"key":31,"text":409,"correct":26},"按设计图示尺寸以体积计算",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":20,"analysis":33},893511,"根据《房屋建筑与装饰工程工程量清单计算规范》（GB50854-2013）规定，关于砌体墙高度计算正确的是（）。",[414,416,418,420],{"key":20,"text":415,"correct":22},"外墙从基础顶面算至平屋面板底面",{"key":24,"text":417,"correct":26},"女儿墙从屋面板顶面算至压顶顶面",{"key":28,"text":419,"correct":26},"围墙从基础顶面算至砼压顶上表面",{"key":31,"text":421,"correct":26},"外山墙从基础顶面算至山墙最高点",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":31,"analysis":33},893512,"根据《房屋建筑与装饰工程工程量清单计算规范》（GB50854-2013）规定，关于石砌体工程量计算正确的是（）。",[426,428,430,432],{"key":20,"text":427,"correct":26},"挡土墙按设计图示中心线长度计算",{"key":24,"text":429,"correct":26},"勒脚工程量按设计图示尺寸以延长米计算",{"key":28,"text":431,"correct":26},"石围墙内外地坪标高之差为挡土墙墙高时，墙身与基础以较低地坪标高为界",{"key":31,"text":433,"correct":22},"石护坡工程量按设计图示尺寸以体积计算",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":31,"analysis":33},893513,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），砌筑工程量计算正确的是（）。",[438,440,442,444],{"key":20,"text":439,"correct":26},"砖地沟按设计图示尺寸以水平投影面积计算",{"key":24,"text":441,"correct":26},"砖地坪按设计图示尺寸以体积计算",{"key":28,"text":443,"correct":26},"石挡土墙按设计图示尺寸以面积计算",{"key":31,"text":445,"correct":22},"石坡道按设计图示尺寸以面积计算",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":31,"analysis":33},893514,"根据《房屋建筑与装饰工程工程量计量规范》（GB50854—2013），关于现浇混凝土柱高计算，说法正确的是（）。",[450,452,454,456],{"key":20,"text":451,"correct":26},"有梁板的柱高自楼板上表面至上一层楼板下表面之间的高度计算",{"key":24,"text":453,"correct":26},"无梁板的柱高自楼板上表面至上一层楼板上表面之间的高度计算",{"key":28,"text":455,"correct":26},"框架柱的柱高自柱基上表面至柱顶高度减去各层板厚的高度计算",{"key":31,"text":457,"correct":22},"构造柱按全高计算",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":20,"analysis":33},893515,"根据《房屋建筑与装饰工程工程量计量规范》（GB50854—2013），关于预制混凝土构件工程量计算，说法正确的是（）。",[462,464,466,468],{"key":20,"text":463,"correct":22},"如以构件数量作为计量单位，特征描述中必须说明单件体积",{"key":24,"text":465,"correct":26},"异形柱应扣除构件内预埋铁件所占体积，铁件另计",{"key":28,"text":467,"correct":26},"大型板应扣除单个尺寸≤300mm×300mm孔洞所占体积",{"key":31,"text":469,"correct":26},"空心板不扣除空洞体积",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":28,"analysis":33},893516,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013，膜结构屋面的工程量应（ ）。",[474,476,478,480],{"key":20,"text":475,"correct":26},"按设计图示尺寸以斜面面积计算",{"key":24,"text":477,"correct":26},"按设计图示尺寸以长度计算",{"key":28,"text":479,"correct":22},"按设计图示尺寸以需要覆盖的水平面积计算",{"key":31,"text":481,"correct":26},"按设计图示尺寸以面积计算",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":20,"analysis":33},893517,"根据《房屋建筑与装饰工程工程量清单计算规范》（GB50854-2013）规定，关于桩基础的项目列项或工程量计算正确的是（）。",[486,488,490,492],{"key":20,"text":487,"correct":22},"预制钢筋砼管桩试验桩应在工程量清单中单独列项",{"key":24,"text":489,"correct":26},"预制钢筋砼方桩试验桩工程量应并入预制钢筋砼方桩项目",{"key":28,"text":491,"correct":26},"现场凿截桩头工程量不单独列项，并入桩工程量计算",{"key":31,"text":493,"correct":26},"挖孔桩土方按设计桩长（包括桩尖）以米计算",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":31,"analysis":33},893518,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013，保温柱的工程量计算正确的是（ ）。",[498,499,501,503],{"key":20,"text":409,"correct":26},{"key":24,"text":500,"correct":26},"按设计图示尺寸以保温层外边线展开长度乘以其高度计算",{"key":28,"text":502,"correct":26},"按图示尺寸以柱面积计算",{"key":31,"text":504,"correct":22},"按设计图示尺寸以保温层中心线展开长度乘以其高度计算",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":28,"analysis":33},893519,"根据《房屋建筑与装饰工程工程量计算规范》GB 50854—2013，下列关于幕墙说法正确的是（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":26},"带肋全玻幕墙其工程量按外围面积计算",{"key":24,"text":512,"correct":26},"带肋全玻幕墙其工程量按投影面积计算",{"key":28,"text":514,"correct":22},"带肋全玻幕墙其工程量按展开面积计算",{"key":31,"text":516,"correct":26},"设在玻幕墙、隔墙上的同样材质的门窗要扣除",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":31,"analysis":33},893520,"如使用不同材料砌筑。墙与基础的分界线应是（ ）。",[521,523,525,527],{"key":20,"text":522,"correct":26},"设计室内地坪",{"key":24,"text":524,"correct":26},"设计室外地坪",{"key":28,"text":526,"correct":26},"材料分界线",{"key":31,"text":528,"correct":22},"据材料分界线与室内地坪的位置而定",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":24,"analysis":33},893521,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013），实心砖墙工程量计算正确的是（）。",[533,535,537,539],{"key":20,"text":534,"correct":26},"凸出墙面的砖垛单独列项",{"key":24,"text":536,"correct":22},"框架梁间内墙按梁间墙体积计算",{"key":28,"text":538,"correct":26},"围墙扣除柱所占体积",{"key":31,"text":540,"correct":26},"平屋顶外墙算至钢筋混凝土板顶面",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":31,"analysis":33},893522,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）规定，关于现浇混凝土柱工程量计算，说法正确的是（）。",[545,547,549,551],{"key":20,"text":546,"correct":26},"有梁板矩形独立柱工程量按住设计截面积乘以自柱基底面至板面高度以体积计算",{"key":24,"text":548,"correct":26},"无梁板矩形柱工程量按柱设计截面积乘以自楼板上表面至柱帽上表面高度以体积计算",{"key":28,"text":550,"correct":26},"框架柱工程量按柱设计截面积乘以自柱基底面至柱顶面高度以体积计算",{"key":31,"text":552,"correct":22},"构造柱按设计尺寸自柱底面至顶面全高以体积计算",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":20,"analysis":33},893523,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）规定，关于预制混凝土构件工程量计算，说法正确的是（）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"预制组合屋架，按设计图示尺寸以体积计算，不扣除预埋铁件所占体积",{"key":24,"text":560,"correct":26},"预计网架板，按设计图示尺寸以体积计算，不扣除孔洞占体积",{"key":28,"text":562,"correct":26},"预制空心板，按设计图示尺寸以体积计算，不扣除空心板空洞所占体积",{"key":31,"text":564,"correct":26},"预制混凝土楼梯按设计图示尺寸以体积计算，不扣除空心踏步板空洞体积",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":31,"analysis":33},893524,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013，楼地面装饰装修工程的工程量计算，正确的是（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":26},"水泥砂浆楼地面整体面层按设计图示尺寸以面积计算，不扣除设备基础和室内地沟所占面积",{"key":24,"text":572,"correct":26},"块料面层按设计图示尺寸以体积计算，并增加门洞开口部分所占面积",{"key":28,"text":574,"correct":26},"金属复合地板按设计图示尺寸以面积计算，门洞、空圈部分所占面积不另增加",{"key":31,"text":576,"correct":22},"水泥砂浆楼梯面按设计图示尺寸以楼梯（包括踏步、休息平台及500mm以内的楼梯井）水平投影面积计算",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":24,"analysis":33},893525,"关于石砌体工程量计算，基础与勒脚应以（ ）为界。",[581,583,584,586],{"key":20,"text":582,"correct":26},"设计室内地面",{"key":24,"text":524,"correct":22},{"key":28,"text":585,"correct":26},"以设计室内／室外的地面／地坪较高者",{"key":31,"text":587,"correct":26},"以设计室内／室外的地面／地坪较低者",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":31,"analysis":33},893526,"根据《房屋建筑与装饰工程工程量清单计算规范》（GB50854-2013）规定，关于现浇砼板的工程量计算正确的是（）。",[592,594,596,598],{"key":20,"text":593,"correct":26},"栏板按设计图示尺寸以面积计算",{"key":24,"text":595,"correct":26},"雨蓬按设计外墙中心线外图示体积计算",{"key":28,"text":597,"correct":26},"阳台板按设计外墙中心线外图示面积计算",{"key":31,"text":599,"correct":22},"散水按设计图示尺寸以面积计算",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":28,"analysis":33},893527,"后张法施工预应力混凝土，孔道长度为12．00m，采用后张混凝土自锚低合金钢筋。钢筋工程量计算的每孔钢筋长度为（ ）m。",[604,606,608,610],{"key":20,"text":605,"correct":26},"12．00",{"key":24,"text":607,"correct":26},"12．15",{"key":28,"text":609,"correct":22},"12．35",{"key":31,"text":611,"correct":26},"13．00",[613,616,619,622,625,628],{"id":15,"name":614,"category":7,"favorite":615},"领导干部任职前廉政法规知识测试题",92,{"id":617,"name":618,"category":7,"favorite":15},595,"建筑结构与设备",{"id":620,"name":621,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":623,"name":624,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":626,"name":627,"category":7,"favorite":8},534,"BIM工程师",{"id":629,"name":627,"category":7,"favorite":8},535]