[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894747":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},894747,580,2,"多选题","工程竣工结算包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","单位工程竣工结算",true,{"key":16,"text":17,"correct":14},"B","单项工程竣工结算",{"key":19,"text":20,"correct":21},"C","分部工程竣工结算",false,{"key":23,"text":24,"correct":21},"D","分项工程竣工结算",{"key":26,"text":27,"correct":14},"E","建设项目竣工总结算","ABE","本题考查的是土建工程价款结算和合同价款的调整。工程竣工结算分为单位工程竣工结算、单项工程竣工结算和建设项目竣工总结算。",{"id":6,"name":31,"category":32,"favorite":33},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]