[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894736":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},894736,580,2,"多选题","根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），关于管沟土方工程量计算的说法，正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","按管沟宽乘以深度再乘以管道中心线长度计算",false,{"key":16,"text":17,"correct":18},"B","按设计管道中心线长度计算",true,{"key":20,"text":21,"correct":18},"C","按设计管底垫层面积乘以深度计算",{"key":23,"text":24,"correct":18},"D","按管道外径水平投影面积乘以深度计算",{"key":26,"text":27,"correct":14},"E","按管沟开挖断面乘以管道中心线长度计算","BCD","本题考查的是土石方工程工程量。按设计图示以管道中心线长度计算；或按设计图示截面积乘以长度以体积计算。有管沟设计时，平均深度以沟垫层底面标高至交付施工场地标高计算；无管沟设计时，直埋管深度应按管底外表面标高至交付施工场地标高的平均高度计算。",{"id":6,"name":31,"category":32,"favorite":33},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]