[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894707":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},894707,580,2,"多选题","根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013）规定，关于土石方的项目列项或工程量计算，正确的是（）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","山坡凿石按一般石方项目编码列项",true,{"key":16,"text":17,"correct":14},"B","挖沟槽石方按设计图示尺寸沟槽底面积乘以挖石深度以体积计算",{"key":19,"text":20,"correct":21},"C","室内回填按主墙间净面积乘以回填厚度计算，扣除间隔墙",false,{"key":23,"text":24,"correct":14},"D","基础回填按设计图示尺寸以体积计算，减去自然地坪以下埋设的基础体积",{"key":26,"text":27,"correct":14},"E","挖管沟石方按设计图示截面积乘以长度以体积计算","ABDE","室内回填按主墙间净面积乘以回填厚度，不扣除间隔墙。",{"id":6,"name":31,"category":32,"favorite":33},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]