[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894674":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},894674,580,2,"多选题","在单位工程施工组织设计中，绘制施工进度计划图时，可以选择（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","横道图计划",true,{"key":16,"text":17,"correct":14},"B","双代号网络计划",{"key":19,"text":20,"correct":14},"C","时标网络计划",{"key":22,"text":23,"correct":14},"D","单代号网络计划",{"key":25,"text":26,"correct":27},"E","多代号网络计划",false,"ABCD","本题考查的是单位工程施工组织设计。绘制施工进度计划图，首先应选择进度图的形式。主要包括横道图计划、双代号网络计划、单代号网络计划和时标网络计划。以时标网络计划较好。",{"id":6,"name":31,"category":32,"favorite":33},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]