[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894668":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},894668,580,2,"多选题","预制柱在吊装时，对于重型柱或配筋少而细长的柱常绑扎（ ）点，以减少柱的吊装弯矩。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","一",false,{"key":16,"text":17,"correct":18},"B","二",true,{"key":20,"text":21,"correct":18},"C","三",{"key":23,"text":24,"correct":18},"D","四",{"key":26,"text":27,"correct":18},"E","六","BCDE","本题考查的是结构吊装工程施工。柱身绑扎点数和绑扎位置，要保证柱在吊装过程中受力合理，不发生变形或裂缝而折断。一般中、小型柱绑扎一点；重型柱或配筋少而细长的柱常绑扎两点甚至两点以上，以减少柱的吊装弯矩。",{"id":6,"name":31,"category":32,"favorite":33},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]