[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894558":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},894558,580,2,"多选题","下列关于招标工程量清单的描述，说法正确的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","招标工程量清单是招标文件的组成部分，可以由招标人委托的工程造价咨询人编制",true,{"key":16,"text":17,"correct":14},"B","招标人对工程量清单中各分部分项工程工程量的准确性和完整性负责",{"key":19,"text":20,"correct":21},"C","由于措施项目投标人可自行选择，因此招标人无须对措施项目工程量的准确性和完整性负责",false,{"key":23,"text":24,"correct":14},"D","招标工程量清单编制前也要进行现场踏勘",{"key":26,"text":27,"correct":21},"E","招标工程量清单编制时需进行先进施工组织设计方案的编制，以提高施工水平","ABD","本题考查的是招标工程量清单的编制。选项C错误，招标人应当对招标工程量清单的准确性和完整性负责；选项E错误，招标工程量清单编制应当拟定常规施工组织设计。",{"id":6,"name":31,"category":32,"favorite":33},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]