[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894535":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},894535,580,2,"多选题","根据《建设工程工程量清单计价规范》的有关规定，下列项目工程量清单计算时，可以m3为计量单位的有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","预制混凝土楼梯",true,{"key":16,"text":17,"correct":14},"B","现浇混凝土楼梯",{"key":19,"text":20,"correct":14},"C","现浇混凝土雨篷",{"key":22,"text":23,"correct":24},"D","现浇混凝土坡道",false,{"key":26,"text":27,"correct":24},"E","现浇混凝土地沟","ABC","本题考查的是。选项D，散水、坡道、室外地坪工程量按设计图示尺寸以水平投影面积计算；选项E，电缆沟、地沟以米计量，按设计图示以中心线长度计算。",{"id":6,"name":31,"category":32,"favorite":33},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]