[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894473":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},894473,580,2,"多选题","根据《国家建筑标准设计图集》（16G101）平法施工图注写方式，含义正确的有（）。 A.LZ表示梁上柱",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","梁300×700Y400×300表示梁规格为300×700，水平加腋长、宽分别为400、300",true,{"key":16,"text":17,"correct":18},"B","XL300×600／400表示根部和端部不同高的悬挑梁",false,{"key":20,"text":21,"correct":14},"C","φ10@120（4）／150（2）表示φ10的钢筋加密区间距120，4肢箍，非加密区间距150，2肢箍",{"key":23,"text":24,"correct":14},"D","KL3（2",{"key":26,"text":27,"correct":14},"E","400×600表示3号楼层框架梁，2跨，一端悬挑","ACDE","梁 300×700Y400×300表示竖向加腋梁，故 B错。",{"id":6,"name":31,"category":32,"favorite":33},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]