[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894453":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},894453,580,2,"多选题","地下连续墙开挖，对确定单元槽段长度因素说法正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","土层不稳定时，应增大槽段长度",false,{"key":16,"text":17,"correct":18},"B","附近有较大地面荷载时，可减少槽段长度",true,{"key":20,"text":21,"correct":14},"C","防水要求高时可减少槽段长度",{"key":23,"text":24,"correct":18},"D","混凝土供应充足时可选用较大槽段",{"key":26,"text":27,"correct":18},"E","现场起重能力强可选用较大槽段","BDE","A项，当土层不稳定时，为防止槽壁坍塌，应减少单元槽段的长度，以缩短挖槽时间。B项，当附近有高大的建筑物、构筑物，或邻近地下连续墙有较大的地面静载或动载时，为了保证槽壁的稳定，亦应缩短单元槽段的长度。C项，单元槽段宜尽量长一些，以减少槽段的接头数量和增加地下连续墙的整体性，又可提高其防水性能和施工效率。D项，一般情况下一个单元槽段长度内的全部混凝土，宜在4h内一次浇筑完毕，所以可按4h内混凝土的最大供应量来推算单元槽段的长度，混凝土供应充足时可选用较大槽段。E项，由于一个单元槽段的钢筋笼多为整体吊装（钢筋笼过长时可水平分为两段），所以应根据起重机械的起重能力估算钢筋笼的重量和尺寸，以此推算单元槽段的长度，现场起重能力强可选用较大槽段。",{"id":6,"name":31,"category":32,"favorite":33},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]