[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894426":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},894426,580,2,"多选题","放坡的坡度应根据（ ）等因素确定，在保证边坡稳定和方便施工的前提下，应减少放坡所增加的挖方量。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","土石性质",true,{"key":16,"text":17,"correct":14},"B","开挖深度",{"key":19,"text":20,"correct":14},"C","开挖方法",{"key":22,"text":23,"correct":24},"D","人工筹备",false,{"key":26,"text":27,"correct":14},"E","地下水位","ABCE","本题考查的是土石方工程施工技术。放坡的坡度（坡高与扩宽之比）应根据土石性质、开挖深度、开挖方法、地下水位、坡顶荷载及气候条件等因素确定，在保证边坡稳定和方便施工的前提下，应减少放坡所增加的挖方量。",{"id":6,"name":31,"category":32,"favorite":33},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]