[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894397":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},894397,580,2,"多选题","土石方工程中，下列关于填方压实施工要求的说法中不正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","填充的边坡坡度越小越好",true,{"key":16,"text":17,"correct":18},"B","填方宜采用同类土填筑",false,{"key":20,"text":21,"correct":18},"C","基础的结构混凝土达到一定的强度后方可填筑",{"key":23,"text":24,"correct":18},"D","当采用不同透水性的土分层填筑时，下层宜填筑透水性较大、上层宜填筑透水性较小的填料。",{"key":26,"text":27,"correct":14},"E","填方由下向上一次完成","AE","本题考查的是土石方工程施工技术。 选项A错误，正确的是永久性填方的高度与边坡坡度应依据不同土石料类别等因素分别确定。 选项B正确，填方宜采用同类土填筑。 选项C正确，基础的结构混凝土达到一定的强度后方可填筑。 选项D正确，当采用不同透水性的土分层填筑时，下层宜填筑透水性较大、上层宜填筑透水性较小的填料。有的要将透水性较小的土层表面做成适当坡度，以防形成水囊。 选项E错误，填方压实应由下至上分层铺填，分层压（夯）实。",{"id":6,"name":31,"category":32,"favorite":33},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]