[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894295":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},894295,580,1,"单选题","根据GB50854-2013 规定，有关木结构工程量计算，说法正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","木屋架的跨度应与墙或柱的支撑点间的距离计算",false,{"key":16,"text":17,"correct":14},"B","木屋架的马尾、折角工程量不予计算",{"key":19,"text":20,"correct":21},"C","木屋架工程量以榀计算",true,{"key":23,"text":24,"correct":14},"D","木柱区分不同规格以高度计算","本题考查的是木结构。木屋架工程量以榀计量时，按设计图示数量计算；以立方米计量时，按设计图示的规格尺寸以体积计算。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]