[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894225":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},894225,580,1,"单选题","下列关于其他项目费的编制说法错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","暂列金额应由投标人自主填写",true,{"key":16,"text":17,"correct":18},"B","暂估价中的材料、工程设备单价应按招标工程量清单中列出的单价计入综合单价",false,{"key":20,"text":21,"correct":18},"C","计日工应按招标工程量清单中列出的项目根据工程特点和有关计价依据确定综合单价计算",{"key":23,"text":24,"correct":18},"D","总承包服务费应根据工程量清单列出的内容和要求按国家或内蒙古自治区建设主管部门的相关规定计算","本题考查的是建筑与装饰工程招标控制价的编制。暂列金额应按招标工程量清单中列出的金额填写。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]