[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894156":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},894156,580,1,"单选题","编制工程量清单出现计算规范附录中未包括的清单项目时，编制人应作补充，下列关于编制补充项目的说法中正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","补充项目编码由B与三位阿拉伯数字组成",false,{"key":16,"text":17,"correct":14},"B","补充项目应报县级工程造价管理机构备案",{"key":19,"text":20,"correct":21},"C","补充项目的工作内容等应予以明确",true,{"key":23,"text":24,"correct":14},"D","补充项目编码应顺序编制，起始序号由编制人根据需要自主确定","本题考查的是土建工程工程量清单的编制方法。工程量清单中应附补充项目的项目名称、项目特征、计量单位、工程量计算规则和工作内容。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]