[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894124":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},894124,580,1,"单选题","根据《建设工程工程量清单计价规范》（GB 50500－2013），关于金属结构工程量计算的说法，正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","钢吊车梁工程量包括制动梁、制动桁架工程量",true,{"key":16,"text":17,"correct":18},"B","钢管柱按设计图示尺寸以质量计算，扣除加强环、内衬管工程量",false,{"key":20,"text":21,"correct":18},"C","空腹钢柱按设计图示尺寸以长度计算",{"key":23,"text":24,"correct":18},"D","实腹钢柱按图示尺寸的长度计算，牛腿和悬臂梁质量另计","本题考查的是金属工程。钢管柱上的节点板、加强坏、内衬管、牛腿等并入钢管柱工程量内；实腹柱、空腹柱，按设计图示尺寸以质量计算，依附在钢柱上的牛腿及悬臂梁等并入钢柱工程量内。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]