[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894110":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},894110,580,1,"单选题","根据《建设工程工程量清单计价规范》（GB 50500－2013），地下连续墙的工程量应（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","按设计图示槽横断面面积乘以槽深以体积计算",false,{"key":16,"text":17,"correct":14},"B","按设计图示尺寸以支护面积计算",{"key":19,"text":20,"correct":14},"C","按设计图示以墙中心线长度计算",{"key":22,"text":23,"correct":24},"D","按设计图示墙中心线长乘以厚度乘以槽深以体积计算",true,"本题考查的是地基处理与边坡支护工程。下连续墙工程量按设计图示墙中心线长乘以厚度乘以槽深以体积计算。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]