[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-894108":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},894108,580,1,"单选题","根据《建设工程工程量清单计价规范》（GB 50500－2013），关于土方的项目列项或工程量计算正确的为（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","建筑物场地厚度为350mm的挖土应按平整场地项目列项",false,{"key":16,"text":17,"correct":14},"B","挖一般土方的工程量通常按开挖虚方体积计算",{"key":19,"text":20,"correct":21},"C","基础土方开挖需区分沟槽、基坑和一般土方项目分别列项",true,{"key":23,"text":24,"correct":14},"D","冻土开挖工程量需按虚方体积计算","本题考查的是土石方工程。选项A错误，厚度＞±300mm的竖向布置挖土或山坡切土应按一般土方项目编码列项；选项BD错误，土方体积应按挖掘前的天然密实体积计算",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]