[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893835":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},893835,580,1,"单选题","招标工程量清单的项目特征中通常不需描述的内容是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","材料材质",false,{"key":16,"text":17,"correct":14},"B","结构部位",{"key":19,"text":20,"correct":21},"C","工程内容",true,{"key":23,"text":24,"correct":14},"D","规格尺寸","在编制分部分项工程量清单时，工程内容通常无须描述。因此，正确选项为 C。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]