[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893808":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},893808,580,1,"单选题","采用定额单价法编制施工图预算时，下列做法正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","若分项工程主要材料品种与预算单价规定材料不一致，需要按实际使用材料价格换算预算单价",true,{"key":16,"text":17,"correct":18},"B","因施工工艺条件与预算单价的不一致而致人工、机械的数量增加，只调价不调量",false,{"key":20,"text":21,"correct":18},"C","因施工工艺条件与预算单价的不一致而使人工、机械的数量减少，既调价也调量",{"key":23,"text":24,"correct":18},"D","对于定额项目基价中未包括的主材费用，应按造价管理机构发布的造价信息价补充进定额基价","A项，分项工程的主要材料品种与预算单价或单位估价表中规定材料不一致时，不可以直接套用预算单价，需要按实际使用材料价格换算预算单价。BCD三项，分项工程施工工艺条件与预算单价或单位估价表不一致而造成人工、机械的数量增减时，一般调量不调价。对于定额项目基价中未包括的主材费用，应单独计算出主材费。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]