[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893807":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},893807,580,1,"单选题","实物量法和定额单价法在编制施工图预算方面的主要区别在于（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","直接工程费计算过程",true,{"key":16,"text":17,"correct":18},"B","依据的定额",false,{"key":20,"text":21,"correct":18},"C","工程量的计算规则",{"key":23,"text":24,"correct":18},"D","确定利润的方法","实物量法编制施工图预算的步骤与定额单价法基本相似，但在具体计算人工费、材料费和机械使用费及汇总三种费用之和方面有一定区别。实物量法编制施工图预算所用人工、材料和机械台班的单价都是当时当地的实际价格，编制出的预算可较准确地反映实际水平，误差较小，适用于市场经济条件波动较大的情况。由于采用该方法需要统计人工、材料、机械台班消耗量，还需搜集相应的实际价格，因而工作量较大、计算过程烦琐。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]