[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893748":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},893748,580,1,"单选题","下列选项中，不属于竣工决算的编制程序中前期准备工作阶段的主要工作内容的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","收集和整理基本的编制资料",false,{"key":16,"text":17,"correct":14},"B","制定切实可行、符合建设项目情况的编制计划",{"key":19,"text":20,"correct":14},"C","由项目负责人对成员进行培训",{"key":22,"text":23,"correct":24},"D","编制完成规范的工作底稿",true,"竣工决算的编制程序前期准备工作阶段的主要工作内容如下：①了解编制工程竣工决算建设项目的基本情况，收集和整理基本的编制资料；②确定项目负责人，配置相应的编制人员；③制定切实可行、符合建设项目情况的编制计划；④由项目负责人对成员进行培训。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]