[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893738":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},893738,580,1,"单选题","下列施工机械的停歇时间，不在预算定额机械幅度差中考虑的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","机械维修引起的停歇",false,{"key":16,"text":17,"correct":14},"B","工程质量检查引起的停歇",{"key":19,"text":20,"correct":14},"C","机械转移工作面引起的停歇",{"key":22,"text":23,"correct":24},"D","进行准备与结束工作时引起的停歇",true,"进行准备与结束工作时引起的停歇属于施工定额中应考虑的。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]