[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893736":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},893736,580,1,"单选题","编制某分项工程预算定额人工工日消耗量时，已知基本用工，辅助用工、超运距用工分别为 20工日、2工日、3工日，人工幅度差系数为10%。则该分项工程单位人工工日消耗量为（）工日。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","27.0",false,{"key":16,"text":17,"correct":14},"B","27.2",{"key":19,"text":20,"correct":14},"C","27.3",{"key":22,"text":23,"correct":24},"D","27.5",true,"该分项工程单位人工工日消耗量＝（20＋2＋3）×（1＋10%）＝27.5（工日）。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]