[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893727":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},893727,580,1,"单选题","分部分项工程量清单项目编码用十二位数字表示，可分为（ ）级。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","3",false,{"key":16,"text":17,"correct":14},"B","4",{"key":19,"text":20,"correct":21},"C","5",true,{"key":23,"text":24,"correct":14},"D","6","项目编码是分部分项工程量清单项目名称的数字标识。分部分项工程量清单项目应按规定编码，项目编码以五级设置，用十二位数字表示，前九位全国统一，不得变动，即一至九位必须按《计价规则》附录的规定设置；后三位是清单项目名称顺序编码，由清单编制人设置，同一招标工程的项目编码不得有重码，一般从00起按顺序编制。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]