[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893635":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},893635,580,1,"单选题","根据《房屋建筑与装饰工程工程量计算规范》（GB50854－2013）基坑支护的锚杆工程量应（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","按设计图示尺寸以支护体体积计算",false,{"key":16,"text":17,"correct":14},"B","按设计图示尺寸以支护面积计算",{"key":19,"text":20,"correct":21},"C","按设计图示尺寸以钻孔深度计算",true,{"key":23,"text":24,"correct":14},"D","按设计图示尺寸以质量计算","锚杆（锚索）、土钉以米计量，按设计图示尺寸以钻孔深度计算；以根计量，按设计图示数量计算。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]