[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893624":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},893624,580,1,"单选题","根据《工程量计算规范》（GB 50854-2013）规定，关于桩基础的项目列项或工程量计算正确的为（ ）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","人工挖孔灌注桩设计图示尺寸以体积（含护壁）计算",false,{"key":16,"text":17,"correct":14},"B","接桩与送桩需要单独列项",{"key":19,"text":20,"correct":21},"C","现场截凿桩头工程量需单独列项",true,{"key":23,"text":24,"correct":14},"D","挖孔桩土方按设计桩长（报括桩尖）以米计算","人工挖空灌注桩按桩芯混凝土体积计算；接庄和送桩综合在桩工程中，截桩应单独列项计算；挖孔桩土方按体积计算。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]