[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893614":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},893614,580,1,"单选题","根据《房屋建筑与装饰工程计算规范》（GB50854-2013），现浇混凝土工程量计算正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","雨篷与圈梁连接时其工程量以梁中心为分界线",false,{"key":16,"text":17,"correct":18},"B","阳台梁与圈梁连接部分并入圈梁工程量",true,{"key":20,"text":21,"correct":14},"C","挑檐板按设计图示水平投影面积计算",{"key":23,"text":24,"correct":14},"D","空心板按设计图示尺寸以体积计算，空心部分不予扣除","A 选项应以外边线为界；C 选项按体积计算；D 选项空心部分扣除",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]