[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893585":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},893585,580,1,"单选题","根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），石材踢脚线工程量应（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","不予计算",false,{"key":16,"text":17,"correct":14},"B","并入地面面层工程量",{"key":19,"text":20,"correct":14},"C","按设计图示尺寸以长度计算",{"key":22,"text":23,"correct":24},"D","按设计图示长度乘以高度以面积计算",true,"踢脚线①以平方米计量，按设计图示长度乘高度以面积计算②以米计量，按延长米计算。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]