[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893567":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},893567,580,1,"单选题","混凝土后浇带以体积计算，通常包括梁后浇带、板后浇带，还有（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","墙后浇带",true,{"key":16,"text":17,"correct":18},"B","雨篷后浇带",false,{"key":20,"text":21,"correct":18},"C","柱后浇带",{"key":23,"text":24,"correct":18},"D","楼梯后浇带","本题考查的是。后浇带项目适用于梁、墙、板的后浇带。后浇带工程量按设计图示尺寸以体积计算。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]