[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893512":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},893512,580,1,"单选题","根据《房屋建筑与装饰工程工程量清单计算规范》（GB50854-2013）规定，关于石砌体工程量计算正确的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","挡土墙按设计图示中心线长度计算",false,{"key":16,"text":17,"correct":14},"B","勒脚工程量按设计图示尺寸以延长米计算",{"key":19,"text":20,"correct":14},"C","石围墙内外地坪标高之差为挡土墙墙高时，墙身与基础以较低地坪标高为界",{"key":22,"text":23,"correct":24},"D","石护坡工程量按设计图示尺寸以体积计算",true,"石挡土墙工程量按设计图示尺寸以体积计算。石勒脚工程量按设计图示尺寸以体积计算。石围墙内外地坪标高不同时，应以较低地坪标高为界，以下为基础；内外标高之差为挡土墙时，挡土墙以上为墙身。石护坡工程量按设计图示尺寸以体积计算。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]