[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893407":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},893407,580,1,"单选题","关于梁平法施工图的注写方式，说法正确的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","梁平法施工图分平面注写方式、列表注写方式",false,{"key":16,"text":17,"correct":14},"B","原位标注表达梁的通用数值",{"key":19,"text":20,"correct":14},"C","集中标注表达梁的特殊数值",{"key":22,"text":23,"correct":24},"D","施工时，原位标注优先于集中标注",true,"本题考查的是平法标准图集。选项A错误，正确的说法是梁平法施工图分平面注写方式、截面注写方式。 选项B、C错误，正确的说法是梁的平面注写包括集中标注与原位标注。集中标注表达梁的通用数值，原位标注表达梁的特殊数值。当集中标注中的某项数值不适用于梁的某部位时，则将该项数值原位标注。 选项D正确，施工时原位标注优先于集中标注。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]