[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893379":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},893379,580,1,"单选题","关于推土机施工作业，说法正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","土质较软使切土深度较大时可采用分批集中后一次推送",false,{"key":16,"text":17,"correct":18},"B","并列推土的推土机数量不宜超过4台",true,{"key":20,"text":21,"correct":14},"C","沟槽推土法是先用小型推土机推出两侧沟槽后再用大型推土机推土",{"key":23,"text":24,"correct":14},"D","斜角推土法是指推土机行走路线沿斜向交叉推进","A项，在较硬的土中，推土机的切土深度较小，一次铲土不多，可分批集中，再整批地推送到卸土区。B项，推土机并列推土时，铲刀间距15～30cm。并列台数不宜超过四台，否则互相影响。C项，沟槽推土法是指沿第一次推过的原槽推土，前次推土所形成的土埂能阻止土的散失，从而增加推运量。D项，斜角推土法是指将铲刀斜装在支架上，与推土机横轴在水平方向形成一定角度进行推土。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]