[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-893353":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},893353,580,1,"单选题","关于钢筋混凝土预制桩加工制作，说法正确的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","长度在10m以上的桩必须工厂预制",false,{"key":16,"text":17,"correct":14},"B","重叠法预制不宜超过5层",{"key":19,"text":20,"correct":14},"C","重叠法预制下层桩强度达到设计强度70%时方可灌注上层桩",{"key":22,"text":23,"correct":24},"D","桩的强度达到设计强度的70%方可起吊",true,"A项，长度在10m以下的短桩，一般多在工厂预制，较长的桩，因不便于运输，通常就在打桩现场附近露天预制。BC两项，现场预制桩多用重叠法预制，重叠层数不宜超过4层，层与层之间应涂刷隔离剂，上层桩或邻近桩的灌注，应在下层桩或邻近桩混凝土达到设计强度等级的30%以后方可进行。D项，钢筋混凝土预制桩应在混凝土达到设计强度的70%方可起吊；达到100%方可运输和打桩。",{"id":6,"name":27,"category":28,"favorite":29},"[土木建筑工程]建设工程计量与计价实务","建筑工程",0]